Attachment 1 - Seed Project One

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

Solicitation – 1282A718R0004

Seed Project 1 – Food Service Hood Repairs

Columbia Basin Job Corps Center

Moses Lake, WA 98837-3246 Grant County, Washington

Item Method of No. Description Measurement Total

BASE ITEM

001 Food Service Hood Repairs Lump Sum $

BASE ITEM TOTAL $

Lump Sum Quantities: These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.

FAR 36.204 Disclosure of the magnitude of construction projects

The Government’s estimate is:

Columbia Basin – Food Service Hood Repairs – Less Than $25,000

COLUMBIA BASIN JOB CORPS CENTER

FOOD SERVICE HOOD REPAIRS

Package prepared by:

Lexie Carroll

November 2017

THIS PAGE IS INTENTIONALLY LEFT BLANK

THIS PAGE IS INTENTIONALLY LEFT BLANK

FOOD SERVICE HOOD REPAIRS 010150 – 1

COLUMBIA BASIN JOB CORPS CCC GENERAL REQUIREMENTS

SECTION 010150

GENERAL REQUIREMENTS

PART 1 – SUMMARY OF WORK

1.01 DESCRIPTION

A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, miscellaneous items, freight and delivery and all necessary valid licenses and permits to repair fire suppression and notification systems on four (4) kitchen hoods in the Food Service Building (Bldg #2401) at the Columbia Basin Job Corps Center. Work to include all plumbing, HVAC, electrical, and alarm work needed.

B. Work is as follows:

1. Hood #1 - Serving Line:

a. Install additional fire suppression nozzles to provide code compliant coverage for the hood.

b. Re-locate existing pull station to be no more than 48 inches above the floor and at least 10’ away from the hood, in the path of egress.

c. Wire the fire suppression system to the electric appliance so that the appliance automatically shuts down when the fire suppression system is triggered.

d. This hood serves an electric deep fat fryer and 2 electric griddles.

2. Hood #2 – Main Floor:

a. Replace cylinder for fire suppression system.

b. Install additional fire detection and fire suppression nozzles to provide code compliant coverage for the hood.

c. Re-locate existing pull station to be no more than 48 inches above the floor and at least 10’ away from the hood, in the path of egress.

d. Install access panel in duct above the hood to provide access for cleaning and nozzle and detection maintenance.

e. Tie fire suppression system controls into building fire alarm system and make up air so that alarm is triggered and make-up air is shutdown when fire suppression system is activated.

f. Install hinge kit on exposed portion of exhaust fan on roof to provide for cleaning.

g. Where currently not in place but required by Code, install automatic gas shut off valves for gas appliances.

h. This hood serves 3 electric convection ovens, 1 gas stove-top with 8 burners and 2 ovens, 1 gas char-broiler, 1- 30 quart tilt skillet, 1 steam jacketed 60 quart kettle, 2 gas rice cookers, and 1 steamer.

3. Hood #3 – Bakery Hood:

a. Replace cylinder for fire suppression system.

FOOD SERVICE HOOD REPAIRS 010150 – 2

b. Install additional fire detection and fire suppression nozzles to provide code compliant coverage for the duct and plenum area.

c. Re-locate existing pull station to be no more than 48 inches above the floor and at least 10’ away from the hood, in the path of egress.

d. Install access panel in duct above the hood to provide access for cleaning and nozzle and detection maintenance.

e. Tie fire suppression system controls into building fire alarm system so that the alarm is triggered and the appliance is shut down when the fire suppression system is activated.

f. This hood serves an electric stove top with 4 burners and 1 oven. The Job Corps Center is currently in the process of also installing a steamer/combo oven which will also be served by a hood #3.

4. Hood #4 – Test Kitchen:

a. Replace cylinder for fire suppression system.

b. Install additional fire detection and fire suppression nozzles to provide code compliant coverage for the hood.

c. Re-locate existing pull station to be no more than 48 inches above the floor and at least 10’ away from the hood, in the path of egress.

d. Tie fire suppression system controls into building fire alarm system so that the alarm is triggered when fire suppression system is activated.

e. Install hinge kit on exposed portion of exhaust fan on roof to provide for cleaning.

f. Where currently not in place but required by Code, install automatic gas shut off valves for gas appliances.

g. This hood serves 1 gas deep fat fryer, 1 gas char-broiler, 1 gas griddle, and a 4-burner gas stove top.

5. All wiring, medium and low voltage, will be installed in surface-mounted EMT conduit.

1.02 QUALITY ASSURANCE

A. Worker's Qualifications: All electrical work shall be performed by licensed electricians or under the direct supervision of a licensed electrician in the state of Washington.

1.02 CODE COMPLIANCE REQUIREMENTS

A. The requirements indicated below shall be in conformance with the most recent versions of the following:

1. NFPA 96, “Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations.

2. NFPA 70, “National Electric Code”.

1.02 SUBMITTAL REQUIREMENTS

FOOD SERVICE HOOD REPAIRS 010150 – 3

A. Prior to beginning work, furnish the following submittals:

1. Floor plan showing all existing conditions, including hoods, appliances, ductwork, shut-off valves, fire suppression systems, and fire detection systems.

2. Applicable photos of existing conditions.

3. Floor plan showing all proposed work.

2. Manufacturer’s literature on all proposed equipment.

3. Sample warranties, if applicable.

C. At Close-out, provide the following submittals:

1. Operations and maintenance information.

2. Project record documents (revised floor plans showing hoods and implemented work).

3. Test reports.

4. Photos of work done.

5. Final warranties.

1.03 LOCATION

A. This project is located at the Food Service/Warehouse Building (Bldg #2401) approximately 3 miles east of Moses Lake, Washington and approximately 100 miles southwest of Spokane, Washington. The address is 6739 24th St, Moses Lake, WA 98837.

1.04 GENERAL SITE CONDITIONS AND WEATHER

A. The elevation of the site is approximately 1000 feet above mean sea level. The site has little rainfall, with high temperatures in the summer into the upper 80’s, and low temperatures in the winter down to the high 20’s.

1.05 USE OF PREMISES

A. Use of Site: Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Full Government Occupancy: Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations.

C. Driveways and Entrances: Keep driveways, parking areas, loading areas and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.

FOOD SERVICE HOOD REPAIRS 010150 – 4

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

1.06 PROJECT SCHEDULING

A. Work shall be performed on regular work days (Monday through Friday) and during regular business houses (7:30 am – 4:00 pm), excluding official Federal Government Holidays. Contractor shall provide a project work schedule and notify the Government a minimum 5 days prior to starting work.

1.07 WORK RESTRICTIONS

A. Nonsmoking Buildings: Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.

1.08 CONTRACTOR’S RESPONSIBILITIES

A. Confine storage of materials to areas as approved by the CO.

B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.

1.09 FIELD VERIFICATION

A. Field verify all new and existing conditions affecting the work of this contract before ordering products.

1.01 PERMITS

A. Obtain permits for any other work required by County, State, or Federal laws or regulations.

B. State electrical inspection is required on this project. Obtain a state electrical permit if a permit is required in order to do the inspection.

PART 2 – DEFINITION OF ITEMS AND PAYMENT

2.01 DESCRIPTION

A. This section explains what is and what is not included in each pay item; the limits or cut-off points where one item ends and another begins; and basis of payment for work items listed in the Schedule of Items.

B. Payment: For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, and as shown on the drawings.

FOOD SERVICE HOOD REPAIRS 010150 – 5

2.02 SCHEDULE OF ITEMS

A. The project Schedule of Items includes several sections to organize the bid items into Base Items and Optional Items.

1. Provide item pricing for all items listed in the Schedule of Items.

2. Contract award will be made for all Base Items.

3. Items listed as Optional Items will be awarded based on available project funding and in no particular order.

B. Base Items (BI):

1. Base Item No.1 – Food Service Hood Repairs

a. Measurement: This item is measured as a lump sum quantity.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to make fire suppression and detection repairs to four existing hoods in the Food Service Building. Work includes all demolition, equipment and installation, HVAC, electrical and plumbing, start-up, submittals, and testing.

3.01 DESCRIPTION

A. This section consists of establishing an effective accident prevention plan and providing a safe environment for personnel and visitors.

3.02 SUBMITTALS

A. Accident Prevention Plan: Before on-site work begins, submit a company approved accident prevention plan. This plan will be posted in the contract file. Design the plan to address Federal, State, and Local Occupational Safety and Health requirements that apply to this project. A Notice to Proceed will not be issued until the plan is received. As a minimum the plan shall include:

1. Name, position title and contact information of company executive responsible for approving the Accident Prevention Plan.

2. Name and contact information of supervisor responsible to carry out the plan.

3. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, government personnel, and the Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.

4. Contingency plans for emergency situations such as medical, fire, hazard material spills and other contract assessed hazard prevention and abatement requirement needs that apply to this project.

B. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.

FOOD SERVICE HOOD REPAIRS 010150 – 6

C. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.

D. Submit a brief report of safety meetings and of inspections.

E. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.

3.03 QUALITY ASSURANCE

A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions: In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.

B. Qualifications of Employees: Ensure employees are physically qualified to perform assigned duties in a safe manner.

3.04 ACCIDENT REPORTING

A. All Accidents: Report all other accidents to the CO as soon as possible and assist the CO and other officials as required in the investigation of the accident.

3.05 FIRST AID FACILITIES

A. Provide adequate facilities for the number of employees and the type of construction at the site.

3.06 PERSONNEL PROTECTIVE EQUIPMENT

A. Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.

3.07 EMERGENCY INSTRUCTIONS

A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

3.08 PROTECTIVE EQUIPMENT

A. Inspect personal protective equipment daily and maintain in a serviceable condition.

Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.

B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

3.09 SAFETY MEETINGS

FOOD SERVICE HOOD REPAIRS 010150 – 7

A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.

3.10 HARD HATS AND PROTECTIVE EQUIPMENT AREAS

A. The CO will designate a hard hat area. Post the hard hat area in a manner satisfactory to the CO.

B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide two hard hats for use by visitors. Change liners before reissuing hats.

3.11 TRAINING

A. First Aid: Provide adequate training to ensure prompt and efficient first aid.

B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.

PART 4 – SUBMITTAL PROCEDURES

4.01 DESCRIPTION

A. This section includes administrative and procedural requirements for submittals.

4.02 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Contracting Officer’s (CO's) responsive action.

B. Informational Submittals: Written information that does not require CO's approval.

Submittals may be rejected for not complying with requirements.

4.03 PROCEDURES

A. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow 10 working days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow 10 working days for processing each re-submittal.

FOOD SERVICE HOOD REPAIRS 010150 – 8

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

B. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space approximately 2 by 3 inches on label or beside title block to record

Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. Other necessary identification.

C. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

D. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

E. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

F. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

G. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

H. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

I. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

4.04 ACTION SUBMITTALS

A. General: Prepare and submit Action Submittals as outlined:

FOOD SERVICE HOOD REPAIRS 010150 – 9

1. Number of Copies: Submit four copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

4.05 INFORMATIONAL SUBMITTALS

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated. CO will not return copies.

2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

B. Contractor's Construction Schedule: Provide a construction schedule.

4.06 ELECTRONIC SUBMITTALS

A. In lieu of hard copies, submittals may be furnished via email in PDF format, if approved by the CO. This does not apply to product samples, which must be submitted hard copy.

PART 5 – TEMPORARY FACILITIES AND CONTROLS

5.01 DESCRIPTION

A. This section consists of requirements for temporary facilities and controls, including utilities, support facilities, and security and protection facilities.

5.02 UTILITIES

FOOD SERVICE HOOD REPAIRS 010150 – 10

A. Water Service: Use of Government existing water service facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.

B. Sanitary Facilities: Use of Government sanitary facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.

C. Electric Power and Lighting Service: Use of Government's existing electric power and lighting service will be permitted without metering and without payment of use charges, as long as equipment is maintained in a condition acceptable to CO.

D. Telephone Service: The Contractor is responsible for providing telephone service deemed necessary for the duration of the construction.

5.03 STORAGE AREAS

A. Coordinate on-site storage requirements with the Contracting Officer.

5.04 CONSTRUCTION WASTE DISPOSAL FACILITIES

A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Use of Government waste disposal facilities will not be permitted.

5.05 SUPPORT FACILITIES INSTALLATION

A. Locate temporary construction and support facilities for easy access.

5.06 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Restrict use of noisemaking tools and equipment to hours that will minimize complaints from persons or firms near Project site.

B. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where appropriate and needed, provide lighting, including flashing red or amber lights.

C. Fire Protection:

1. Store combustible materials in containers in fire-safe locations.

FOOD SERVICE HOOD REPAIRS 010150 – 11

2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.

3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.

PART 6 – EXECUTION REQUIREMENTS

6.01 DESCRIPTION

A. This section consists of general procedural requirements governing execution of the Work including, but not limited to, the following:

1. General installation of products.

2. Progress cleaning.

3. Protection of installed construction.

4. Correction of the Work.

6.02 EXAMINATION

A. Existing Conditions: Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work.

B. Acceptance of Conditions: Examine areas, and conditions, with Installer. Record observations.

1. Examine roughing-in for electrical systems to verify actual locations of connections before equipment and fixture installation.

2. Proceed with installation only after unsatisfactory conditions have been corrected.

Proceeding with the Work indicates acceptance of surfaces and conditions.

6.03 PREPARATION

A. Field Measurements: Take field measurements as required to fit the Work properly.

B. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO.

Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.

6.04 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb and make horizontal work level.

FOOD SERVICE HOOD REPAIRS 010150 – 12

B. Comply with manufacturer's written instructions and recommendations for installing products.

C. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.

6.05 PROGRESS CLEANING

A. General: Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).

3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

D. Waste Disposal: Burying or burning waste materials on-site will not be permitted.

Washing waste materials down sewers or into waterways will not be permitted.

6.06 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

6.07 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

6.09 FIELD QUALITY CONTROL

A. Notify Contracting Officer at least 48 hours before inspection or testing. Perform test in the presence of the Contracting Officer.

B. Operational Tests: Test that the new sprinkler heads, pull stations, and automatic shutdown of appliances work properly. Fix any improperly installed components and re-test. Show and demonstrate use of the newly installed access ports within existing ducts.

FOOD SERVICE HOOD REPAIRS 010150 – 13

C. Prepare a report that summarizes testing and any corrections made.

PART 7 – OPERATIONS AND MAINTENANCE MANUALS

7.01 DESCRIPTION

A. This Section consists of administrative and procedural requirements for operation and maintenance manuals.

7.02 SUBMITTALS

A. Submit two manuals in final form at least 15 working days before final inspection.

7.03 OPERATION AND MAINTENANCE MANUALS

A. Assemble a complete set of operation and maintenance data indicating the operation and maintenance of each system, subsystem, and piece of equipment not part of a system.

Include operation and maintenance data required in individual Specification Sections and as follows:

1. Operation Data: Include emergency instructions and procedures, system and equipment descriptions, operating procedures, and sequence of operations.

2. Maintenance Data: Include manufacturer's information, list of spare parts, maintenance procedures, maintenance and service schedules for preventive and routine maintenance, and copies of warranties and bonds.

B. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain a title page, table of contents, and manual contents.

C. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:

1. Subject matter included in manual.

2. Name and address of Project.

3. Name and address of Job Corps.

4. Date of submittal.

5. Name, address, and telephone number of Contractor.

6. Cross-reference to related systems in other operation and maintenance manuals.

D. Table of Contents: List each product included in manual, identified by product name, indexed to content of volume, and cross-referenced to Specification Section.

E. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.

FOOD SERVICE HOOD REPAIRS 010150 – 14

1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets.

a. Identify each binder on front and spine, with printed title "OPERATION

AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets.

2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual.

3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment.

4. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.

a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.

b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.

F. Content: Include operation and maintenance data required in individual Specification Sections and equipment descriptions, operating standards, operating procedures, operating logs, wiring and control diagrams, and license requirements.

G. Descriptions: Include the following:

1. Product name and model number.

2. Manufacturer's name.

3. Equipment identification with serial number of each component.

4. Equipment function.

5. Operating characteristics.

6. Engineering data and tests.

7. Complete nomenclature and number of replacement parts.

H. Source Information: For each product, list name, address, and telephone number of Installer or supplier.

I. Operating Procedures: Include startup, break-in, and control procedures; stopping and normal shutdown instructions; routine, normal, seasonal, and weekend operating instructions; and required sequences for electric or electronic systems.

J. Systems and Equipment Controls: Describe sequence of operation, and diagram controls as installed.

FOOD SERVICE HOOD REPAIRS 010150 – 15

K. Maintenance Procedures: For each system, subsystem, and piece of equipment not part of a system, include manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, drawings and diagrams for maintenance, nomenclature of parts and components, and recommended spare parts for each component part or piece of equipment.

L. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment.

M. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.

1. Provide heavy paper dividers with plastic-covered tabs for each separate warranty.

Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

PART 8 – CLOSEOUT PROCEDURES

8.01 DESCRIPTION

A. This section consists of administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Inspection procedures.

2. Project Record Documents.

3. Closeout Submittals.

4. Final cleaning.

8.02 SUBSTANTIAL COMPLETION

A. Definition of Substantial Completion: The Date certified by the Contracting Officer when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.

B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise Contracting Officer (CO) of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.

FOOD SERVICE HOOD REPAIRS 010150 – 16

4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

5. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs and photographic negatives, and similar final record information.

6. Complete startup testing of systems.

7. Complete final cleaning requirements, including touchup painting.

8. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final Completion.

8.03 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

8.04 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

FOOD SERVICE HOOD REPAIRS 010150 – 17

A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

8.05 PROJECT RECORD DOCUMENTS

A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.

B. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.

1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.

a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.

b. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.

2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.

3. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.

4. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets;

bind each set with durable paper cover sheets. Include identification on cover sheets.

8.07 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

FOOD SERVICE HOOD REPAIRS 010150 – 18

1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

2. Remove tools, construction equipment, machinery, and surplus material from Project site.

3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION 010150

General Decision Number: WA180051 01/05/2018 WA51

Superseded General Decision Number: WA20170051

State: Washington

Construction Type: Building

County: Grant County in Washington.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018

* BRWA0003-002 06/01/2017

Rates Fringes

BRICKLAYER.......................$ 39.46 16.15

* BRWA0003-009 06/01/2017

Rates Fringes

TILE SETTER......................$ 27.40 13.50

CARP0001-012 06/01/2017

Rates Fringes

CARPENTER (Including Drywall Hanging and Form Work)...........$ 27.76 16.14

ZONE PAY:

ZONE 1 0-40 MILES FREE

ZONE 2 41-65 MILES $2.25/PER HOUR

ZONE 3 66-100 MILES $3.25/PER HOUR

1/19/2018https://www.wdol.gov/wdol/scafiles/davisbacon/WA51.dvb?v=0

ZONE 4 OVER 100 MILES $4.75/PER HOUR

DISPATCH POINTS:

CARPENTERS/MILLWRIGHTS: PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

HAZMAT PROJECTS:

Anyone working on a HAZMAT job (task, where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows:

LEVEL D+ $.25 per hour - This is the lowest level of proection. No respirator is used and skin proection is minimal.

LEVEL C+ $.50 per hour - This level uses an air purifying respirator or additional protective clothing.

LEVEL B+ $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit."

LEVEL A+ $1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line.

ELEC0191-015 06/01/2017

Rates Fringes

ELECTRICIAN......................$ 40.65 19.59

ENGI0370-009 06/01/2015

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 26.16 13.55

GROUP 2.....................$ 26.48 13.55

GROUP 3.....................$ 27.09 13.55

GROUP 4.....................$ 27.25 13.55

GROUP 5.....................$ 27.41 13.55

GROUP 6.....................$ 27.69 13.55

GROUP 7.....................$ 27.96 13.55

GROUP 8.....................$ 29.06 13.55

ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00

Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;

Lewiston, Idaho

Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Rollers, all types on subgrade, including seal and chip coatings

GROUP 2: Fork Lift

GROUP 3: Bulldozer (up to D-6 or equivalent)

GROUP 4: Loaders (overhead & front-end, under 4 yds. R/T)

GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under 3/4 yd.); Cranes (25 tons & under)

GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Mechanic

GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons);

Loaders (overhead & front-end, over 8 yds. to 10 yds.)

GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)

BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale

NOTE:

In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

HAZMAT:

Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.

IRON0014-012 07/01/2016

Rates Fringes

IRONWORKER (Ornamental, Reinforcing and Structural)......$ 32.89 24.56

LABO0238-007 06/01/2017

Rates Fringes

Laborer, Mason Tender Brick......$ 26.76 11.30

LABO0238-025 06/01/2017

Rates Fringes

LABORER

GROUP 2.....................$ 26.76 11.30

GROUP 3.....................$ 27.03 11.30

GROUP 4.....................$ 27.30 11.30

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Pasco

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

LABORERS CLASSIFICATIONS

GROUP 2: Common or General Laborer

GROUP 3: Mason Tender-Cement/Concrete; Pipelayer

GROUP 4: Grade Checker

PAIN0005-005 07/01/2015

Rates Fringes

PAINTER (Brush, Prep Work, and Spray Only. Excludes Roller and Drywall Finishing/Taping.)...............$ 23.05 10.85

PLAS0072-008 06/01/2017

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.23 13.77

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee

Zone 1: 0 - 45 radius miles from the main post office

Zone 2: 45 radius miles from the main post office

PLUM0598-018 06/01/2017

Rates Fringes

PIPEFITTER.......................$ 49.24 28.79

ROOF0189-001 07/01/2017

Rates Fringes

ROOFER (Includes Roof Tear Off, Waterproofing, and Installation of Metal Roofs).....$ 26.86 11.73

SFWA0699-005 04/01/2017

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 33.20 15.84

SHEE0066-029 06/01/2017

Rates Fringes

SHEETMETAL WORKER (Including HVAC Duct Work)..................$ 29.42 20.84

SUWA2002-006 06/18/2009

Rates Fringes

METAL BUILDING ERECTOR...........$ 11.30 3.58

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 27.94 0.00

PAINTER: Drywall Finishing/Taping.................$ 25.17 4.41

PAINTER: Roller.................$ 22.06 2.72

PIPE INSULATOR/WRAPPER...........$ 24.21 4.07

PLUMBER..........................$ 35.00 0.00

TRUCK DRIVER, Includes Dump Truck............................$ 23.50 6.87

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters,…