PART I - THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Solicitation – 1282A718R0004
Seed Project 2 – Misc. Building Egress and Emergency Lighting
Columbia Basin Job Corps Center Moses Lake, WA 98837-3246 Grant County, Washington
Item Method of No. Description Measurement Total
BASE ITEM
001 Building 2403 – Egress and Emergency Lump Sum $ Lighting
002 Building 2406 – Egress and Emergency Lump Sum $ Lighting
BASE ITEMS TOTAL $
Lump Sum Quantities: These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.
FAR 36.204 Disclosure of the magnitude of construction projects
The Government’s estimate is: Less than $25,000.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 001500-1
COLUMBIA BASIN JOB CORPS CCC LIST OF DRAWINGS AND SPECIFICATIONS
SECTION 001500
COLUMBIA BASIN JOB CORPS CCC
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING
LIST OF DRAWINGS AND SPECIFICATIONS
PART 1 – GENERAL
1.1 DESCRIPTION
A. List of Contract Drawings:
1. Index of Sheets:
SHEET NUMBER BUILDING NAME SHEET TITLE
T1.0 General Title Sheet and Sheet Index
E1.1 2403 - Dormitory Lighting Floor Plans
E1.2 2406 - Dormitory Lighting Floor Plans
E2.1 General Luminaire Schedule
4 TOTAL SHEETS IN CONTRACT
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 001500-2
COLUMBIA BASIN JOB CORPS CCC LIST OF DRAWINGS AND SPECIFICATIONS
B. List of Contract Specifications
1. Index of Specifications
DIVISION 1 - GENERAL REQUIREMENTS
Section 001500 List of Drawings and Specifications Section 010150
General Requirements
DIVISION 26 – ELECTRICAL
Section 260000
Electrical Materials and Methods
END OF SECTION 001500
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 1
COLUMBIA BASIN JOB CORPS CCC GENERAL REQUIREMENTS
SECTION 010150
GENERAL REQUIREMENTS
PART 1 – SUMMARY OF WORK
1.01 DESCRIPTION
A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, miscellaneous items, freight and delivery and all necessary valid licenses and permits to install egress and emergency lighting on 4 buildings at the Columbia Basin Job Corps Center.
1.02 QUALITY ASSURANCE
A. Worker's Qualifications: All electrical work shall be performed by licensed electricians or under the direct supervision of a licensed electrician in the state of Washington.
1.02 CODE COMPLIANCE REQUIREMENTS
A. The requirements indicated below shall be in conformance with the most recent versions of the following:
1. NFPA 101.
2. NFPA 70, “National Electric Code”.
1.03 LOCATION
A. This project is located at the Columbia Basin Job Corps Center, approximately 3 miles east of Moses Lake, Washington and approximately 100 miles southwest of Spokane, Washington. The address is 6739 24th St, Moses Lake, WA 98837.
1.04 GENERAL SITE CONDITIONS AND WEATHER
A. The elevation of the site is approximately 1000 feet above mean sea level. The site has little rainfall, with high temperatures in the summer into the upper 80’s, and low temperatures in the winter down to the high 20’s.
1.05 USE OF PREMISES
A. Use of Site: Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Full Government Occupancy: Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations.
C. Driveways and Entrances: Keep driveways, parking areas, loading areas and entrances serving premises clear and available to Government, Government's employees, and
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 2
emergency vehicles at all times. Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
1.06 PROJECT SCHEDULING
A. Work shall be performed on regular work days (Monday through Friday) and during regular business houses (7:30 am – 4:00 pm), excluding official Federal Government Holidays. Contractor shall provide a project work schedule and notify the Government a minimum 5 days prior to starting work.
1.07 WORK RESTRICTIONS
A. Nonsmoking Buildings: Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.
1.08 CONTRACTOR’S RESPONSIBILITIES
A. Confine storage of materials to areas as approved by the CO.
B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.
1.09 FIELD VERIFICATION
A. Field verify all new and existing conditions affecting the work of this contract before ordering products.
1.01 PERMITS
A. Obtain permits for any other work required by County, State, or Federal laws or regulations.
B. State electrical inspection is required on this project. Obtain a state electrical permit if a permit is required in order to do the inspection.
PART 2 – DEFINITION OF ITEMS AND PAYMENT
2.01 DESCRIPTION
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 3
A. This section explains what is and what is not included in each pay item; the limits or cut-off points where one item ends and another begins; and basis of payment for work items listed in the Schedule of Items.
B. Payment: For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, and as shown on the drawings.
2.02 SCHEDULE OF ITEMS
A. Base Items (BI):
1. Base Item No.1 – Building 2403 Egress and Emergency Lighting
a. Measurement: This item is measured as a lump sum quantity.
b. Payment: The contract lump sum price as shown in the Schedule of Items to install new egress and emergency lighting in Buildings #2403. Work includes all demolition, submittals materials, equipment and installation, start-up, and testing. General requirements for the project are also part of this Pay Item.
2. Base Item No. 2 – Building 2406 Egress and Emergency Lighting
a. Measurement: This item is measured as a lump sum quantity.
b. Payment: The contract lump sum price as shown in the Schedule of Items to install new egress and emergency lighting in Buildings #2406. Work includes all demolition, submittals materials, equipment and installation, start-up, and testing.
3.01 DESCRIPTION
A. This section consists of establishing an effective accident prevention plan and providing a safe environment for personnel and visitors.
3.02 SUBMITTALS
A. Accident Prevention Plan: Before on-site work begins, submit a company approved accident prevention plan. This plan will be posted in the contract file. Design the plan to address Federal, State, and Local Occupational Safety and Health requirements that apply to this project. A Notice to Proceed will not be issued until the plan is received. As a minimum the plan shall include:
1. Name, position title and contact information of company executive responsible for approving the Accident Prevention Plan.
2. Name and contact information of supervisor responsible to carry out the plan.
3. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 4 government personnel, and the Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.
4. Contingency plans for emergency situations such as medical, fire, hazard material spills and other contract assessed hazard prevention and abatement requirement needs that apply to this project.
B. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.
C. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.
D. Submit a brief report of safety meetings and of inspections.
E. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.
3.03 QUALITY ASSURANCE
A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions: In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.
B. Qualifications of Employees: Ensure employees are physically qualified to perform assigned duties in a safe manner.
3.04 ACCIDENT REPORTING
A. All Accidents: Report all other accidents to the CO as soon as possible and assist the CO and other officials as required in the investigation of the accident.
3.05 FIRST AID FACILITIES
A. Provide adequate facilities for the number of employees and the type of construction at the site.
3.06 PERSONNEL PROTECTIVE EQUIPMENT
A. Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.
3.07 EMERGENCY INSTRUCTIONS
A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
3.08 PROTECTIVE EQUIPMENT
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 5
A. Inspect personal protective equipment daily and maintain in a serviceable condition.
Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
3.09 SAFETY MEETINGS
A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.
3.10 HARD HATS AND PROTECTIVE EQUIPMENT AREAS
A. The CO will designate a hard hat area. Post the hard hat area in a manner satisfactory to the CO.
B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide two hard hats for use by visitors. Change liners before reissuing hats.
3.11 TRAINING
A. First Aid: Provide adequate training to ensure prompt and efficient first aid.
B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.
PART 4 – SUBMITTAL PROCEDURES
4.01 DESCRIPTION
A. This section includes administrative and procedural requirements for submittals.
4.02 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Contracting Officer’s (CO's) responsive action.
B. Informational Submittals: Written information that does not require CO's approval.
Submittals may be rejected for not complying with requirements.
4.03 PROCEDURES
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 6
A. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 10 working days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 10 working days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
B. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space approximately 2 by 3 inches on label or beside title block to record
Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. Other necessary identification.
C. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
D. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
E. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
F. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
G. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 7
H. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
I. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
4.04 ACTION SUBMITTALS
A. General: Prepare and submit Action Submittals as outlined:
1. Number of Copies: Submit four copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
4.05 INFORMATIONAL SUBMITTALS
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated. CO will not return copies.
2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
B. Contractor's Construction Schedule: Provide a construction schedule.
4.06 ELECTRONIC SUBMITTALS
A. In lieu of hard copies, submittals may be furnished via email in PDF format, if approved by the CO. This does not apply to product samples, which must be submitted hard copy.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 8
PART 5 – TEMPORARY FACILITIES AND CONTROLS
5.01 DESCRIPTION
A. This section consists of requirements for temporary facilities and controls, including utilities, support facilities, and security and protection facilities.
5.02 UTILITIES
A. Water Service: Use of Government existing water service facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.
B. Sanitary Facilities: Use of Government sanitary facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.
C. Electric Power and Lighting Service: Use of Government's existing electric power and lighting service will be permitted without metering and without payment of use charges, as long as equipment is maintained in a condition acceptable to CO.
D. Telephone Service: The Contractor is responsible for providing telephone service deemed necessary for the duration of the construction.
5.03 STORAGE AREAS
A. Coordinate on-site storage requirements with the Contracting Officer.
5.04 CONSTRUCTION WASTE DISPOSAL FACILITIES
A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Use of Government waste disposal facilities will not be permitted.
5.05 SUPPORT FACILITIES INSTALLATION
A. Locate temporary construction and support facilities for easy access.
5.06 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Restrict use of noisemaking tools and equipment to hours that will minimize complaints from persons or firms near Project site.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 9
B. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where appropriate and needed, provide lighting, including flashing red or amber lights.
C. Fire Protection:
1. Store combustible materials in containers in fire-safe locations.
2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.
3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.
PART 6 – EXECUTION REQUIREMENTS
6.01 DESCRIPTION
A. This section consists of general procedural requirements governing execution of the Work including, but not limited to, the following:
1. General installation of products.
2. Progress cleaning.
3. Protection of installed construction.
4. Correction of the Work.
6.02 EXAMINATION
A. Existing Conditions: Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work.
B. Acceptance of Conditions: Examine areas, and conditions, with Installer. Record observations.
1. Examine roughing-in for electrical systems to verify actual locations of connections before equipment and fixture installation.
2. Proceed with installation only after unsatisfactory conditions have been corrected.
Proceeding with the Work indicates acceptance of surfaces and conditions.
6.03 PREPARATION
A. Field Measurements: Take field measurements as required to fit the Work properly.
B. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO.
Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 10
6.04 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
B. Comply with manufacturer's written instructions and recommendations for installing products.
C. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.
6.05 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.
D. Waste Disposal: Burying or burning waste materials on-site will not be permitted.
Washing waste materials down sewers or into waterways will not be permitted.
6.06 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.
6.07 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
PART 7 – OPERATIONS AND MAINTENANCE MANUALS
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 11
7.01 DESCRIPTION
A. This Section consists of administrative and procedural requirements for operation and maintenance manuals.
7.02 SUBMITTALS
A. Submit two manuals in final form at least 15 working days before final inspection.
7.03 OPERATION AND MAINTENANCE MANUALS
A. Assemble a complete set of operation and maintenance data indicating the operation and maintenance of each system, subsystem, and piece of equipment not part of a system.
Include operation and maintenance data required in individual Specification Sections and as follows:
1. Operation Data: Include emergency instructions and procedures, system and equipment descriptions, operating procedures, and sequence of operations.
2. Maintenance Data: Include manufacturer's information, list of spare parts, maintenance procedures, maintenance and service schedules for preventive and routine maintenance, and copies of warranties and bonds.
B. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain a title page, table of contents, and manual contents.
C. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:
1. Subject matter included in manual.
2. Name and address of Project.
3. Name and address of Job Corps.
4. Date of submittal.
5. Name, address, and telephone number of Contractor.
6. Cross-reference to related systems in other operation and maintenance manuals.
D. Table of Contents: List each product included in manual, identified by product name, indexed to content of volume, and cross-referenced to Specification Section.
E. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.
1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 12
a. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets.
2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual.
3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment.
4. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.
a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.
b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.
F. Content: Include operation and maintenance data required in individual Specification Sections and equipment descriptions, operating standards, operating procedures, operating logs, wiring and control diagrams, and license requirements.
G. Descriptions: Include the following:
1. Product name and model number.
2. Manufacturer's name.
3. Equipment identification with serial number of each component.
4. Equipment function.
5. Operating characteristics.
6. Engineering data and tests.
7. Complete nomenclature and number of replacement parts.
H. Source Information: For each product, list name, address, and telephone number of Installer or supplier.
I. Operating Procedures: Include startup, break-in, and control procedures; stopping and normal shutdown instructions; routine, normal, seasonal, and weekend operating instructions; and required sequences for electric or electronic systems.
J. Systems and Equipment Controls: Describe sequence of operation, and diagram controls as installed.
K. Maintenance Procedures: For each system, subsystem, and piece of equipment not part of a system, include manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, drawings and diagrams for maintenance, nomenclature of parts and components, and recommended spare parts for each component part or piece of equipment.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 13
L. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment.
M. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.
1. Provide heavy paper dividers with plastic-covered tabs for each separate warranty.
Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.
PART 8 – CLOSEOUT PROCEDURES
8.01 DESCRIPTION
A. This section consists of administrative and procedural requirements for contract closeout, including, but not limited to, the following:
1. Inspection procedures.
2. Project Record Documents.
3. Closeout Submittals.
4. Final cleaning.
8.02 SUBSTANTIAL COMPLETION
A. Definition of Substantial Completion: The Date certified by the Contracting Officer when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.
B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Advise Contracting Officer (CO) of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.
4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.
5. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs and photographic negatives, and similar final record information.
6. Complete startup testing of systems.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 14
7. Complete final cleaning requirements, including touchup painting.
8. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final Completion.
8.03 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
8.04 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
8.05 PROJECT RECORD DOCUMENTS
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 15
A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.
B. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.
1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.
a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.
b. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.
2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.
3. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.
4. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets;
bind each set with durable paper cover sheets. Include identification on cover sheets.
8.07 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
2. Remove tools, construction equipment, machinery, and surplus material from Project site.
3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.
Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 010150 – 16
D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 010150
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 260000 – 1
COLUMBIA BASIN JOB CORPS CCC ELECTRICAL MATERIAL
AND METHODS
SECTION 260000
ELECTRICAL MATERIAL AND METHODS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes electrical requirements and materials for installing and replacing light fixtures, including the following:
1. Raceways.
2. Wire and connectors.
3. Outlet, pull, and junction boxes.
4. Luminaires.
1.2 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specifications, apply to Division 26 Sections
1.3 QUALITY ASSURANCE
A. Worker's Qualifications: All electrical work shall be performed by licensed electricians or under the direct supervision of a licensed electrician licensed in the state of Washington.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a testing agency and marked for intended use.
C. Provide products that are UL listed and labeled.
D. Codes and Regulations:
1. All work shall meet requirements of governing codes and regulations, NFPA 70- 2017 (NEC), and NESC.
2. Comply with NFPA 101 for egress and emergency lighting.
3. The electrical installation shall meet the requirements of NECA Standard of
Installation, except where otherwise specified. Advise the Contracting Officer of conflicting codes or conflicts between codes and drawings and specifications.
4. When the requirements of specifications or drawings are more stringent than the codes, regulations, or standards, the specifications or drawings shall prevail.
E. IEEE Compliance: Applicable requirements and recommended installation practices of IEEE Standards pertaining to grounding and bonding of systems, circuits, and equipment.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 260000 – 2
AND METHODS
1.4 PERMITS AND INSPECTIONS
A. State electrical inspection is required for this project. Obtain an electrical permit if the State requires a permit to do the inspection.
1.5 INTENT OF CONSTRUCTION DRAWINGS
A. Electrical drawings do not attempt to show complete details of building construction that affect installation. Diagrams are schematic only and do not necessarily show physical arrangement of equipment. Refer to drawings of other trades for additional details that affect work.
B. Conduit, conductor and ground connections are shown diagrammatically only. Layout does not necessarily show total number of conduits or conductors for circuits required and should not be used for obtaining quantities for linear runs of conduits or wires.
Provide additional conduits and wire wherever needed to complete installation of specific equipment furnished.
C. Changes such as offsetting conduit runs, moving outlets, or other minor changes necessary to facilitate installation shall be made at no additional expense to the Government.
1.6 SUBMITTALS
A. As specified in Division 1 Section “Submittal Procedures.”
1. Product Data: Submit manufacturer’s product literature for the following items:
a. Conduit, raceways, and fittings.
b. Wire and cable.
c. Luminaires.
2. Sample warranties for luminaires.
1.7 CLOSEOUT SUBMITTALS
A. As specified in Division 1 Section “Submittal Procedures.”
1. Operations and Maintenance data for the following items:
a. Luminaires.
2. Warranties for luminaires.
3. Footcandle verification report.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 260000 – 3
AND METHODS
PART 2 – PRODUCTS
2.1 RACEWAYS
A. Metal Conduit:
1. RMC: Rigid metal conduit; galvanized rigid steel; ANSI C80.1.
2. Fittings and Conduit Bodies: ANSI/NEMA FB 1; material to match conduit.
B. EMT: Electrical metallic tubing; ANSI C80.3, zinc-coated steel.
1. Fittings and Conduit Bodies: ANSI/NEMA FB 1; steel compression type.
2.2 WIRE AND CABLE
A. Feeders and Branch Circuits: Copper, stranded conductor, 600 volt insulation, Type THW, THHN/THWN depending on application.
2.3 OUTLET, PULL, AND JUNCTION BOXES
A. General: Provide one for each outlet, switch, receptacle, or combination, at each junction point.
1. Metal Raceway Systems in Interior Dry Locations: Plastic or galvanized sheet metal.
2. Outdoor and Wet Locations: Weatherproof, cast metal, threaded hub.
3. Buried or Subject to Constant Moisture: Watertight.
2.4 LUMINAIRES
A. General: Provide accessories required for a complete and operable system. For recessed fixtures, provide plaster frames and flanges suitable for ceiling. Provide plates, barriers, or rings to cover any exposed ceiling material between fixture canopy or pan and outlet box. Fixtures installed in damp and wet locations shall be UL listed and marked "Suitable for Wet Locations”.
B. Exterior Wall Mount “Type A”
1. Housing: Die-cast aluminum with integral heat sink fins.
2. Finish: Zinc-infused thermoset power coat finish, natural aluminum, 3 mils thick.
3. Mounting: Wall mount.
4. Lamp: LED, L88 performance of 100,000 hours, class 1 electronic driver, CRI
= 70 min.
5. UL listed for wet locations.
6. With motion/ambient sensor for a 8-15’ mounting height.
7. Emergency battery backup.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 260000 – 4
AND METHODS
8. Warranty: Five year.
C. Exterior Wall Mount “Type B”
1. Housing: Die-cast aluminum with integral heat sink fins.
2. Finish: Zinc-infused thermoset power coat finish, natural aluminum, 3 mils thick.
3. Mounting: Wall mount.
4. Lamp: LED, L88 performance of 100,000 hours, class 1 electronic driver, CRI
= 70 min.
5. UL listed for wet locations.
6. With motion/ambient sensor for a 15’-30’ mounting height.
7. Emergency battery backup.
8. Warranty: Five year.
PART 3 – EXECUTION
3.1 EXAMINATION
A. Field verify measurements and circuiting arrangements.
B. Removal Drawings are based on casual field observation and existing record documents. Report discrepancies to Contracting Officer before disturbing existing installation.
C. Field check all existing conditions prior to beginning work. Beginning of removal means installer accepts existing conditions.
3.2 ELECTRICAL REMOVAL AND EXTENSION OF EXISTING ELECTRICAL
WORK
A. Disconnect, demolish, and remove electrical systems, equipment, and components in-dicated to be removed.
1. Circuits to Be Removed: Remove portion of circuits, including conductors and conduit, indicated to be removed to source of supply. Disconnect abandoned outlets and remove devices. Remove abandoned outlets if conduit servicing them is abandoned and removed. Provide blank cover for abandoned outlets which are not removed.
2. Equipment to Be Removed: Disconnect equipment. Remove circuit to source of supply where circuit is indicated to be removed. Temporarily terminate con-ductors in a safe manner where circuit will be reattached to new equipment or devices. Remove equipment.
B. Verify that abandoned wiring and equipment serve only abandoned facilities. Main-tain electrical continuity to remaining wiring and equipment.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 260000 – 5
AND METHODS
C. If during construction electrical conductors, conduits, or equipment to remain is dam-aged in appearance or is unserviceable, remove damaged or unserviceable portions and replace with new products of equal capacity and quality.
D. Existing Electrical Service: Maintain existing systems in service until new systems are accepted. Disable systems only to make switchovers and connections. Notify the Contracting Officer at least 36 hours before partially or completely disabling system.
Minimize outage duration. Make temporary connections to maintain service in areas adjacent to work area.
E. Where the reuse of existing conduits, outlets, junction boxes, etc. is permissible, make certain that the wiring for them is continuous from outlet to outlet.
F. Provide temporary wiring and connections to maintain existing systems in service during construction.
G. Remove exposed abandoned conduit, including abandoned conduit above accessible ceiling finishes. Cut conduit flush with walls and floors, and patch surfaces.
H. Repair adjacent construction and finishes damaged during demolition and extension work. Provide modifications to assure that circuits or systems wiring shall not pass through outlet or junction boxes that may be rendered inaccessible by changes made to the building.
I. Connect new work to existing work in a manner that will assure proper raceway grounding throughout in conformance with the National Electrical Code.
J. Removed conduits, wire, devices, fixtures, etc. is the property of the Contractor unless otherwise noted.
3.3 RACEWAY APPLICATION
A. Minimum Conduit Size, unless otherwise shown or specified:
1. Homeruns: Minimum 1/2-inch.
B. Wet and Damp Locations: RMC.
C. Dry Locations: Exposed, use EMT.
3.4 RACEWAY INSTALLATION
A. Install raceways in accordance with NECA “Standard of Installation” and manufacturer’s recommendations.
B. Route exposed raceways parallel and perpendicular to walls.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 260000 – 6
AND METHODS
C. Conceal raceways and cables, unless otherwise indicated, within finished walls, ceilings, and floors.
D. Run raceway plumb, level, and in a direct line, with long sweeping bends and offsets.
Make changes in direction of raceway with symmetrical bends or metal fittings.
E. Keep legs of raceway bends in the same plane and keep straight legs of offsets parallel.
F. Maintain 12-inch clearance between conduit and surfaces with temperatures exceeding 1040F.
G. Use conduit hubs or sealing locknuts to fasten conduit to sheet metal boxes and cast boxes in damp and wet locations.
H. Install no more than equivalent of four 90-degree bends between boxes. Use conduit bodies to make sharp changes in direction.
I. Seal wall and roof penetrations weathertight.
3.5 WIRE AND CABLE METHODS
A. Conductor Size:
1. Meet requirements of NFPA 70. or the sizes shown on the drawings if larger.
Use no wire smaller than No. 12 AWG for power and lighting circuits, and no smaller than No. 16 AWG for control wiring.
B. Building Wire and Cable Application: Use wiring and cabling methods specified below to the extent permitted by applicable codes.
1. Concealed Interior Feeders and Branch Circuits: Armored Cable (AC), Metal- Clad Cable, (MC), Non-metallic Sheathed Cable (NM), Mineral-insulated, Metal-sheathed Cable (MI) or THHN-THWN single conductors in raceway.
2. Exposed Interior Locations: THHN-THWN single conductors in raceway.
3. Exposed, Above Accessible Ceilings: THHN-THWN single conductors in raceway, Armored-cable Type AC, or Metal-clad-cable Type MC.
4. Wet or Damp Interior Locations: THHN-THWN single conductors in raceways.
5. Exterior Locations: THHN-THWN single conductors in raceway.
6. Underground: THHN-THWN single conductors in raceway.
C. Taps and Splices:
1. Permitted only in junction or outlet boxes.
2. Make splices and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors.
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 260000 – 7
AND METHODS
D. Place an equal number of conductors for each phase of a circuit in same raceway or cable. Pull all conductors into a raceway at the same time.
E. Cable Installation:
1. Do not use cable as flexible connection to motors or other vibrating equipment.
2. Run concealed cable parallel and perpendicular to building elements at right angles. Run parallel cable runs together. Run high and tight to structure.
3. Support cable every four feet and within 12 inches of every outlet box, junction box, cabinet, of fitting.
F. Sealing: Seal equipment raceways, boxes, etc. exiting through structures exposed to the weather watertight and insect-proof.
3.6 LUMINAIRE INSTALLATION
A. Set level, plumb, and square with ceilings and walls. Install lamps in each fixture.
B. Mount at heights shown, adjusting fixture locations to avoid space conflicts. Securely support fixtures, attaching to outlet box if box is adequately supported. Support suspended fixtures by metal stems or cables that hang level in same horizontal plane.
C. Do not use fixtures as a raceway for circuit conductors except for single branch circuit supplying the fixtures. Branch circuit wiring shall not pass through an outlet box that is an integral part of an incandescent fixture unless fixture is identified for the purpose.
D. Flush and recessed fixtures without integral outlet box shall have tap connection conductor, with insulation rated for 90 degrees C, run from fixture terminal connection to an outlet box at least 1 foot from fixture. Tap shall be between 4 and 6 feet long in metallic raceway.
E. Arrange wiring within fixtures neatly and protect from damage. Protect conductor insulation from abrasion where it passes through metal using chase nipples or equivalent.
F. Clean and install lenses just before final inspection.
3.7 ADJUST AND CLEAN
A. Adjust operating mechanisms for free mechanical movement.
B. Touch-up scratched or marred enclosure surfaces to match original finishes.
3.8 VERIFICATION
MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING 260000 – 8
AND METHODS
A. Measure the lighting levels in footcandles at ground surface to ensure compliance with egress and emergency requirements as outlined in NFPA 101. Perform verification in the presence of the Contracting Officer. Summarize findings in a report.
END OF SECTION 260000
B2401
A
CHANUTE STREET
T W
E N
T Y
F
O U
R T
H
S
T R
E E
T
T W
E N
S
E C
O N
D
S
T R
E E
T
BOLLING STREET
FORBES STREET
T W
E N
S
E C
O N
D
S
T R
E E
T
F
G
H
J
ROCKY MOUNTAIN REGION
JOB CORPS
NATIONAL FIELD OFFICE
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE TITLE SHEET AND DRAWING INDEX T1.0
1MISCELLANEOUS BUILDING EGRESS AND EMERGENCY LIGHTING
COLUMBIA BASIN
CIVILIAN CONSERVATION CENTER
OKANOGAN-WENATCHEE NATIONAL FOREST 4
Washington
PROJECT
LOCATION
BUILDING LEGEND
1901 -
GYMNASIUM/RECREATION/THEATER
1903 - CO-ED DORMITORY
2401 - FOOD SERVICE/WAREHOUSE
2402 - ADMINISTRATION/VOCATION
2403 - DORMITORY
2404 - MED/DENTAL/HEALTH
OCCUPATION
2406 - DORMITORY/EDUCATION
2407 - VACANT DORMITORY
2408 - VACANT DORMITORY
2409 - EDUCATION
3601 - PAINTING/FACILITY
MAINTENANCE
3604 - CARPENTRY/PLASTERING
3606 - WELDING
3607 - CEMENT MASONRY
3608 - STORAGE
3610 - PAINT SPRAY BOOTH
3611 - STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PAVED
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text C
AutoCAD SHX Text
CENTER SIGN
AutoCAD SHX Text
1/2 MILE
AutoCAD SHX Text
TENNIS COURT
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
RAMPS DOWN
AutoCAD SHX Text
BIKE RACK
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
SAND STORAGE
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text Checked:
AutoCAD SHX Text Design:
AutoCAD SHX Text Date:
AutoCAD SHX Text Drawn:
AutoCAD SHX Text Sheet Title:
AutoCAD SHX Text Sub Sheet:
AutoCAD SHX Text Sheet
AutoCAD SHX Text
OF
AutoCAD SHX Text
L.CARROLL
AutoCAD SHX Text
L.CARROLL
AutoCAD SHX Text
D.CHAV…