QandA August-7-2020.pdf
PDF 102 KB Posted
- Attached to
- Roof Replacement - Stillwater, OK Federal contract opportunity
- Solicitation number
- 12805B20Q0081
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QandA August-13-2020.pdf | ||
| QandA_ Aug_6_2020.pdf | ||
| Appendix B Downspout Photos.pdf | ||
| Attachment 4 ARS-372.pdf | ||
| Attachment 2 SOW v1.pdf | ||
| Attachment 3 ARS-371.pdf | ||
| Attachment 5 FAR Deviation Accelerated Payments to Small Business.pdf | ||
| Sol_12805B20Q0081.pdf | ||
| Attachment 1 Wage Determination OK20200063.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 7, 2020 Questions and Answers
12805B20Q0081
Note: This Q&A supersedes the one posted yesterday August 6, 2020.
Questions and clarifications about Roof Replacement on Building 17 at Stillwater, OK.
1. What is the iso board thickness? Is it 1 layer of 1.5" or 2 layers of 1.5". THIS DOES NOT INCLUDE
THE FLUTE FILL INSULATION.
a. SOW Page 5, Paragraph 3.1.2 states “1.5” roof board insulation over existing PBR roof system”; and 3.1.3 states “1.5” roof board insulation cover board over new 1.5” roof board insulation” for a total of 3” of roof board insulation above the filled flutes between the ribs of the metal roof.
2. Can we install 6" Seamless gutters with double downspouts vs 12' pieces of gutter which eventually leak at the joints?
a. Yes, seamless gutters can be used, but no seams or downspouts shall be placed over windows or doors. Number of Downspouts to be the same and in the same locations.
b. See attached Photos of Existing Downspouts in Appendix B.
3. What are the working hours are weekends allowed?
a. SOW Page 1, Paragraph 1.4, 0800 to 1630, Monday through Friday. Location Monitor will consider special circumstances for weather and hours can be extended from 07:00 am to 4:30 pm on weekdays. A special circumstance would not include that the company is from out of state. Indoor restrooms are never provided. The contractor is to provide their own restrooms.
4. Clarifications to Paragraph 3.1.7, Add the following “Gutter demolition and replacement sketches and gauges are to be submitted for review. Insulation at eaves shall be tapered from 3” to 1” thickness over 2 ft. length with 1” above the exterior wall.”