Attachment 3 - Schedule of Items.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Bushy Knoll Pit Crush & Stockpile
- Solicitation number
- 127EAX27Q0017
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items pricing template for the Bushy Knoll Crush and Stockpile project issued by the Department of Agriculture Forest Service for the Mogollon Rim Ranger District, Coconino National Forest. The solicitation (127EAX27Q0017) is a Request for Quotation set-aside for small business concerns under NAICS code 212321 (Construction Sand and Gravel Mining) with a 500-employee size standard. The contract requires mobilization, aggregate gradation sampling and testing with quality control surveying, pit and quarry development, and stockpiling of aggregate material graded "R3-G" per specification 703. The base contract includes 10,500 cubic yards of stockpiled aggregate, while four optional periods (Options A through D) each include 2,000 cubic yards of additional aggregate and associated sampling/testing activities. All pricing fields are blank in this template, indicating this is a bidding document where contractors must submit their unit costs and total prices. A bid guarantee of 20 percent of the bid price is required per FAR 52.228-1. The contractor is responsible for obtaining all required permits from the Arizona Department of Environmental Quality.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Statement of Work.pdf | ||
| Attachment 2 - Specifications.docx | DOCX document | |
| Attachment 5 - Site Plan.pdf | ||
| Attachment 6 - Wage Determination.pdf | ||
| Attachment 4 - Fire Plan.pdf | ||
| 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
SCHEDULE OF ITEMS
MOGOLLON RIM RANGER DISTRICT / COCONINO NF
PROJECT TITLE: Bushy Knoll Crush and Stockpile
| PROJECT | Bushy Knoll Crush and Stockpile | |||||
| UNIT | Mogollon Rim Ranger District | |||||
| Base | ||||||
| Pay Item | Description | Method of Measure | Estimated Quantity | Pay Unit | Estimated Unit Cost | Total |
| 151 (01) | Mobilization | LS | 1 | LSQ | $0.00 | $0.00 |
| 154 (01) | Aggregate Gradation Sampling & Testing including surveying for quality control | LS | 1 | LSQ | $0.00 | $0.00 |
| 314 (01) | Stockpiled Aggregate, Grading "R3-G" per 703 Aggregate | CQ | 10500 | CY | $0.00 | $0.00 |
| 651 (01) | Pit and Quarry Development | LS | 1 | LSQ | $0.00 | $0.00 |
| TOTAL BASE | $0.00 | |||||
| Option A | ||||||
| Pay Item | Description | Method of Measure | Estimated Quantity | Pay Unit | Estimated Unit Cost | Total |
| 154 (02) | Aggregate Gradation Sampling & Testing including surveying for quality control | LS | 1 | LSQ | $0.00 | $0.00 |
| 314 (02) | Stockpiled Aggregate, Grading "R3-G" per 703 Aggregate | CQ | 2000 | CY | $0.00 | $0.00 |
| TOTAL OPTION A | $0.00 | |||||
| Option B | ||||||
| Pay Item | Description | Method of Measure | Estimated Quantity | Pay Unit | Estimated Unit Cost | Total |
| 154 (03) | Aggregate Gradation Sampling & Testing including surveying for quality control | LS | 1 | LSQ | $0.00 | $0.00 |
| 314 (03) | Stockpiled Aggregate, Grading "R3-G" per 703 Aggregate | CQ | 2000 | CY | $0.00 | $0.00 |
| TOTAL OPTION B | $0.00 | |||||
| Option C | ||||||
| Pay Item | Description | Method of Measure | Estimated Quantity | Pay Unit | Estimated Unit Cost | Total |
| 154 (04) | Aggregate Gradation Sampling & Testing including surveying for quality control | LS | 1 | LSQ | $0.00 | $0.00 |
| 314 (04) | Stockpiled Aggregate, Grading "R3-G" per 703 Aggregate | CQ | 2000 | CY | $0.00 | $0.00 |
| TOTAL OPTION C | $0.00 | |||||
| Option D | ||||||
| Pay Item | Description | Method of Measure | Estimated Quantity | Pay Unit | Estimated Unit Cost | Total |
| 154 (05) | Aggregate Gradation Sampling & Testing including surveying for quality control | LS | 1 | LSQ | $0.00 | $0.00 |
| 314 (05) | Stockpiled Aggregate, Grading "R3-G" per 703 Aggregate | CQ | 2000 | CY | $0.00 | $0.00 |
| TOTAL OPTION D | $0.00 |
| TOTAL BASE | $0.00 |
| TOTAL OPTIONS | $0.00 |
TOTAL BASE + OPTIONS $0.00