This is a Schedule of Items pricing template for the Bushy Knoll Crush and Stockpile project issued by the Department of Agriculture Forest Service for the Mogollon Rim Ranger District, Coconino National Forest. The solicitation (127EAX27Q0017) is a Request for Quotation set-aside for small business concerns under NAICS code 212321 (Construction Sand and Gravel Mining) with a 500-employee size standard. The contract requires mobilization, aggregate gradation sampling and testing with quality control surveying, pit and quarry development, and stockpiling of aggregate material graded "R3-G" per specification 703. The base contract includes 10,500 cubic yards of stockpiled aggregate, while four optional periods (Options A through D) each include 2,000 cubic yards of additional aggregate and associated sampling/testing activities. All pricing fields are blank in this template, indicating this is a bidding document where contractors must submit their unit costs and total prices. A bid guarantee of 20 percent of the bid price is required per FAR 52.228-1. The contractor is responsible for obtaining all required permits from the Arizona Department of Environmental Quality.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

SCHEDULE OF ITEMS

MOGOLLON RIM RANGER DISTRICT / COCONINO NF

PROJECT TITLE: Bushy Knoll Crush and Stockpile

PROJECTBushy Knoll Crush and Stockpile
UNITMogollon Rim Ranger District
Base
Pay ItemDescriptionMethod of MeasureEstimated QuantityPay UnitEstimated Unit CostTotal
151 (01)MobilizationLS1LSQ$0.00$0.00
154 (01)Aggregate Gradation Sampling & Testing including surveying for quality controlLS1LSQ$0.00$0.00
314 (01)Stockpiled Aggregate, Grading "R3-G" per 703 AggregateCQ10500CY$0.00$0.00
651 (01)Pit and Quarry DevelopmentLS1LSQ$0.00$0.00
TOTAL BASE$0.00
Option A
Pay ItemDescriptionMethod of MeasureEstimated QuantityPay UnitEstimated Unit CostTotal
154 (02)Aggregate Gradation Sampling & Testing including surveying for quality controlLS1LSQ$0.00$0.00
314 (02)Stockpiled Aggregate, Grading "R3-G" per 703 AggregateCQ2000CY$0.00$0.00
TOTAL OPTION A$0.00
Option B
Pay ItemDescriptionMethod of MeasureEstimated QuantityPay UnitEstimated Unit CostTotal
154 (03)Aggregate Gradation Sampling & Testing including surveying for quality controlLS1LSQ$0.00$0.00
314 (03)Stockpiled Aggregate, Grading "R3-G" per 703 AggregateCQ2000CY$0.00$0.00
TOTAL OPTION B$0.00
Option C
Pay ItemDescriptionMethod of MeasureEstimated QuantityPay UnitEstimated Unit CostTotal
154 (04)Aggregate Gradation Sampling & Testing including surveying for quality controlLS1LSQ$0.00$0.00
314 (04)Stockpiled Aggregate, Grading "R3-G" per 703 AggregateCQ2000CY$0.00$0.00
TOTAL OPTION C$0.00
Option D
Pay ItemDescriptionMethod of MeasureEstimated QuantityPay UnitEstimated Unit CostTotal
154 (05)Aggregate Gradation Sampling & Testing including surveying for quality controlLS1LSQ$0.00$0.00
314 (05)Stockpiled Aggregate, Grading "R3-G" per 703 AggregateCQ2000CY$0.00$0.00
TOTAL OPTION D$0.00
TOTAL BASE$0.00
TOTAL OPTIONS$0.00

TOTAL BASE + OPTIONS $0.00