SOI - SF Vault Toilets.pdf

PDF 66 KB Posted

Attached to
GAOA Vault Toilet Replacement - Santa Fe National Forest
Solicitation number
127EAX26R0005
Issued by

About this file

This document is a Schedule of Items for the USDA Forest Service's Santa Fe National Forest, detailing vault toilet replacements under the GAOA (Great American Outdoors Act) project. The project covers three campground locations: Jacks Creek, Links Tract, and Field Tract, with multiple work items including pumping solids and liquids, toilet and septic tank demolition, backfilling, precast concrete double vault toilet installations, and related site work. Key quantities include pumping 9,000 gallons at Jacks Creek, 750 gallons at Links Tract, and 2,000 gallons at Field Tract, with demolition work ranging from 80-635 square feet across different toilet types. Additional scope involves trash bin removal, sidewalk and pathway construction, mobilization, and in the Field Tract location, an asbestos abatement component. All work items are measured using the "DQ" (Direct Quote) method of measurement, indicating the contractor will provide unit pricing for each listed item.

View the file

Other files

File Type Posted
Specifications - SF Vault Toilets.pdf PDF
127EAX26R0005 Santa Fe Vault Toilet QA3.docx DOCX document
127EAX26R0005 Santa Fe Vault Toilet QA1.docx DOCX document
127EAX26R0005 Santa Fe Vault Toilet QA2.docx DOCX document
127EAX26R0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item No. Description Unit Qty Method of

Measurement Unit Price Amount

Pump Solids and Liquids out of 4 Compost Tanks & 4 Vaults.

Estimated Quantity: 9,000 gallons

LS 1 DQ

2 Toilet 1 (Single Dual Compost) Demolition SF 350 DQ

3 Toilet 2 (Single Dual Compost) Demolition SF 350 DQ

4 Toilet 3 (Single Dual Compost) Demolition SF 350 DQ

5 Toilet 4 (Double Dual Compost) Demolition SF 635 DQ

6 Toilet 5 (Vault) Demolition SF 350 DQ

7 Toilet 6 (Vault) Demolition SF 350 DQ

11 Backfill for 4 Compost Toilet Basements Tons 153 DQ

13 Precast Concrete Double Vault Toilets Delivery/Install Each 6 DQ

16 Sidewalks and Trash Bin Pads SF 3,077 DQ

17 Trash Bin Removal & Reinstallation (6 sites, 2 bins per site) Each 12 DQ

19 Mobilization LS 1 DQ

JACKS CREEK SUBTOTAL Subtotal

Item No. Description Unit Qty Method of

Measurement Unit Price Amount

Pump Solids and Liquids out of 1 Vault.

Estimated Quantity: 750 gallons

LS 1 DQ

8 Single Vault Toilet Demolition SF 80 DQ

11 Backfill for Vault Toilet Tons 7 DQ

14 Precast Concrete Double Vault Toilets Delivery/Install Each 1 DQ

18 Gravel Pathways SF 230 DQ

19 Mobilization LS 1 DQ

LINKS TRACT SUBTOTAL Subtotal

Item No. Description Unit Qty Method of

Measurement Unit Price Amount

Pump Solids and Liquids out of 1 Septic Tank.

Estimated Quantity: 2000 gallons

LS 1 DQ

Field Tract Campground

USDA Forest Service - Santa Fe National Forest GAOA - Santa Fe Vault Toilet Replacements

Schedule of Items

Jacks Creek Campground

Links Tract Campground

9 Flush Toilet Demolition SF 288 DQ

10 Asbestos Abatement LS 1 DQ

11 Backfill for Septic Tank Tons 7 DQ

12 Septic Tank Decommission Each 1 DQ

15 Precast Concrete Double Vault Toilets Delivery/Install Each 1 DQ

18 Gravel Pathways SF 770 DQ

19 Mobilization LS 1 DQ

FIELD TRACT SUBTOTAL Subtotal

PROJECT TOTAL