127EAX26R0005 Santa Fe Vault Toilet QA3.docx

DOCX document 93 KB Posted

Attached to
GAOA Vault Toilet Replacement - Santa Fe National Forest
Solicitation number
127EAX26R0005
Issued by

About this file

This document is a Questions and Answers (Q&A) file for Solicitation 127EAX26R0005, a vault toilet replacement project for the Santa Fe National Forest. The Q&A addresses two specific inquiries: first, clarifying that no new underground electrical lines are to be installed as part of the project, and second, responding to a request for project specifications. The solicitation involves demolishing 8 existing toilet facilities and replacing them with 8 new vault toilets on the Pecos/Las Vegas Ranger District, addressing human health and safety concerns. The project is being conducted by the Department of Agriculture Forest Service, with a site visit scheduled for December 3rd at the Pecos Las Vegas Ranger Station in Pecos, New Mexico.

View the file

Other files

File Type Posted
Specifications - SF Vault Toilets.pdf PDF
127EAX26R0005 Santa Fe Vault Toilet QA1.docx DOCX document
127EAX26R0005 Santa Fe Vault Toilet QA2.docx DOCX document
SOI - SF Vault Toilets.pdf PDF
127EAX26R0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

127EAX26R0005 Santa Fe Vault Toilet Replacement Q&A #3 1.In the RFI responses QA2, question number 6 response alludes to there being an installation of new underground electrical when the drawings only state to disconnect at the transformer/ disconnect at Field Track Restroom and abandon existing lines in place. Can you confirm we are to trench and run new secondary lines within the SOW of this project?

A: As noted the drawings do not indicate that there are to be secondary electric lines installed as a part of the Vault Toilet contract. The question itself is phrased in a way that gives the false indication that electric line installation is required and therefore the answer speaks to that particular question. The Vault Toilet project does not have installation of new electric lines. The drawings clearly define what needs to happen for the vault toilets regarding electric work and coordination with Mora San Miguel.

2. Upon release of the new solicitation, the specifications were not provided, and the reference to the related solicitation (127EAX25R0022) is no longer available. Please provide the specifications so we can ensure our pricing for the vault toilets is compliant. Otherwise please advise on the model number and preferred manufacturer.

A: Specifications uploaded image1.png image2.png image3.png