SOI - SF Water System Upgrades.pdf
PDF 68 KB Posted
- Attached to
- Water System Upgrades Santa Fe National Forest Federal contract opportunity
- Solicitation number
- 127EAX26R0004
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Schedule of Items for the USDA Forest Service Santa Fe National Forest GAOA Santa Fe Water System Upgrades project. The project involves water system infrastructure improvements at three sites: Jacks Creek Campground, Panchuela Admin Site, and Field Tract Campground. Work includes demolition of existing yard hydrants and concrete bases, removal of contaminated soil, installation of pump house buildings, trenching and installation of water lines (1" and 2" HDPE), underground electrical lines, curb shutoff valves, yard hydrants, water system disinfection, and mobilization. Each site has specific quantities for different line items, with the Jacks Creek Campground having the most extensive work, including 9,700 linear feet of 2" water lines and 2,130 linear feet of 1" water lines. The project requires a comprehensive water system upgrade including new water tanks, pumps, electrical systems, and associated infrastructure across these three forest service locations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 127EAX26R0004 0001.pdf | ||
| 127EAX26R0004 QA2.pdf | ||
| 127EAX26R0004 QA3.pdf | ||
| 127EAX26R0004 Santa Fe Water System Upgrades QA1.docx | DOCX document | |
| 127EAX26R0004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Description Unit Qty Meathod of
Measurement Unit Price Amount
02419(01) Demolition of Yard Hydrants & Concrete Bases Each 11 DQ
02419(03) Removal of Contaminated soil under water line road crossings, storage in earthen swales lined with 4 mil HDPE liner, then backfilling into trench after water lines are placed.
Each 11 DQ
10168(01)
Pump House Building (170 sq. ft.) and Related Items. Includes all electrical & plumbing accessories in the building such as 1,700 gallon water tank, piping, valves, spigots, drain line, pressure tank, booster pump, chlorination system, level controls, radio control, electrical panel and wiring, & misc. Also includes Service Road and bollards.
LS 1 DQ
10168(02) Trenching & Underground Electrical Lines LF 50 DQ
02500(01) Trenching & Water Lines, 2" HDPE. Includes fittings, thrust blocks, and other accessories.
LF 9,700 DQ
02500(02) Trenching & Water Lines, 1" HDPE. Includes fittings, thrust blocks, and other accessories.
LF 2,130 DQ
02500(03) Curb Shutoff Valve: 1" Each 19 DQ
02500(04) Curb Shutoff Valve: 2" Each 4 DQ
02500(05) Combination Air Valve Each 4 DQ
02500(06) Check Valve Each 1 DQ
02500(07) Yard Hydrants on Concrete Pads Each 9 DQ
02500(08) Water Systems Disinfection Each 1 DQ
02500(09) Operation & Maintenance Plan Each 1 DQ
01601(01) Mobilization LS 1 DQ
JACKS CREEK SUBTOTAL Subtotal
Item No. Description Unit Qty Meathod of
Measurement Unit Price Amount
02419(01) Demolition of Yard Hydrants & Concrete Bases Each 4 DQ
02500(01) Trenching & Water Lines, 2" HDPE. Includes fittings, thrust blocks, and other accessories.
LF 600 DQ
02500(02) Trenching & Water Lines, 1" HDPE. Includes fittings, thrust blocks, and other accessories.
LF 210 DQ
02500(03) Curb Shutoff Valve: 1" Each 6 DQ
02500(04) Curb Shutoff Valve: 2" Each 1 DQ
02500(07) Yard Hydrants on Concrete Pads Each 2 DQ
02500(08) Water Systems Disinfection Each 1 DQ
02500(09) Operation & Maintenance Plan Each 1 DQ
01601(01) Mobilization LS 1 DQ
PANCHUELA SUBTOTAL Subtotal
Item No. Description Unit Qty Meathod of
Measurement Unit Price Amount
Field Tract Campground
USDA Forest Service - Santa Fe National Forest GAOA - Santa Fe Water System Upgrades
Schedule of Items
Jacks Creek Campground
Panchuela Admin Site
02419(01) Demolition of Yard Hydrants & Concrete Bases Each 1 DQ
02419(02) Demolition of Well House & Foundation (64 sq. ft.), Installation of Pitless Adapter, and Backfill of Pit
LS 1 DQ
10168(01)
Pump House Building (170 sq. ft.) and Related Items. Includes all electrical & plumbing accessories in the building such as 1,700 gallon water tank, piping, valves, spigots, drain line, pressure tank, booster pump, chlorination system, level controls, radio control, electrical panel and wiring, & misc. Also includes Service Road and bollards.
LS 1 DQ
10168(02) Trenching & Underground Electrical Lines LF 200 DQ
02500(01) Trenching & Water Lines, 2" HDPE. Includes fittings, thrust blocks, and other accessories.
LF 20 DQ
02500(02) Trenching & Water Lines, 1" HDPE. Includes fittings, thrust blocks, and other accessories.
LF 20 DQ
02500(03) Curb Shutoff Valve: 1" Each 2 DQ
02500(04) Curb Shutoff Valve: 2" Each 1 DQ
02500(07) Yard Hydrants on Concrete Pads Each 1 DQ
02500(08) Water Systems Disinfection Each 1 DQ
02500(09) Operation & Maintenance Plan Each 1 DQ
01601(01) Mobilization LS 1 DQ
FIELD TRACT SUBTOTAL Subtotal
PROJECT TOTAL