This is a Schedule of Items for a fixed-price construction contract containing base construction items and four optional work items. The solicitation was updated on 9/10/26 and requires one award with pricing submitted for all items.

Base construction work includes renovation and repairs to five buildings: Sierraville Barracks (1033), Sierraville Ranger Residence (1029), Foresthill Residence C (1015), Foresthill Residence (1016), Foresthill Barracks (1017), and Engine Barracks (0018). Work scopes vary by building but generally include bathroom renovations with fixture replacement, door and lock replacement, flooring replacement with commercial-grade laminate vinyl plank, kitchen cabinet and countertop replacement, roof replacement with 50-year composition shingles, and exterior siding work. Item 0001 is mobilization. Square footage ranges from 825 to 2,720 square feet across the buildings, with construction dates ranging from 1934 to 1967. Optional items include flooring replacement only at Big Bend Residence (1022), Big Bend Barracks (1028), Bullards Residence (1008), and Bullards Barracks (1049). Pricing is structured with unit prices for individual items and lump sum pricing for specific renovations. Quantities are estimated, and the contractor must field verify to satisfy all requirements of drawings, statement of work, and specifications. Bond premiums per FAR Clause 52.232-5 shall not be added in addition to the contract price. The form includes spaces for contractor company name, point of contact, email, phone number, UEI number, and Tax ID.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)

Updated 9/10/26

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QT

Y.

UNIT

PRICE

TOTAL

PRICE

Mobilization

1 $________ $________

Sierraville Barracks – 1033

Est. 2720 Sq. Ft.

Year built - 1958

Major remodel in 1990

Renovate bathroom (includes replacing all fixtures, shower/tub, toilet, cabinets flooring, paint)

Lump Sum 1 $________ $________

0003 Remove and replace all doors and locks Each 7 $________ $________

Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 2720 $________ $________

Remove and replace all kitchen cabinets and countertops

Lump Sum 1 $________ $________

0006 Replace roof with 50-year composition shingle style materials.

Lump Sum

Total Sierraville Barracks 1033 $

Sierraville Ranger Residence – 1029

Est 1208 Sq. Ft.

Constructed in 1938

Remove and replace all doors and locks Each 3 $________ $________

0008 Refinish all wood floors SF 1208 $________ $________

Remove and replace all kitchen cabinets and countertops

Lump Sum 1 $________ $________

0010 Replace roof with 50-year composition shingle style materials.

Lump Sum

Install all new horizontal wood siding on top of asbestos siding to match existing buildings, make building watertight.

Lump Sum 1 $________ $________

Total Sierraville Barracks 1029 $

Foresthill Residence C – 1015 Est 1,005 Sq. Ft.

Constructed in 1934 fixtures, shower/tub, toilet, cabinets flooring, paint)

Lump Sum 1 $________ $________

0013 Remove and replace all doors and locks Each 10 $________ $________

Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 1005 $________ $________

Remove and replace all kitchen cabinets and countertops

Lump

Total Foresthill Residence C – 1015 $

Foresthill Residence – 1016 Est 825 Sq. Ft.

Constructed in 1947 fixtures, shower/tub, toilet, cabinets flooring, paint)

Lump Sum 1 $________ $________

0017 Remove and replace all doors and locks Each 7 $________ $________

Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 825 $________ $________

Remove and replace all kitchen cabinets and countertops

Lump

Total Foresthill Residence – 1016 $

Foresthill Barracks – 1017 Est 2,535 Sq. Ft.

Constructed 1934 fixtures, shower/tub, toilet, cabinets flooring, paint)

Lump Sum 1 $________ $________

0021 Remove and replace all doors and locks Each 14 $________ $________

Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 2535 $________ $________

Remove and replace all kitchen cabinets and countertops

Lump

Total Foresthill Barracks - 1017

Engine Barracks – 0018 Est. 2,000 Sq. Ft.

Constructed 1967

Renovate bathroom (includes replacing all fixtures, shower/tub, toilet, cabinets flooring, paint)

Lump Sum 1 $________ $________

0025 Remove and replace all doors and locks Each 9 $________ $________

Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 2000 $________ $________

Remove and replace all siding with Horizontal Hardy board type siding material. Make watertight. SF 4200 $________ $________

Remove and replace all kitchen cabinets and countertops

Lump

Total Engine Barracks – 0018 $

OPTION 1

Big Bend Residence - 1022 Est. 1,220 Sq. Ft.

Constructed 1966

Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 1220 $________ $________

OPTION 2

Big Bend Barracks - 1028 Est. 1,633 Sq. Ft.

Constructed 1959

Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 1633 $________ $________

OPTION 3

Bullards Residence - 1008 Est. 1,640 Sq. Ft.

Constructed 1967

Remove and replace all linoleum flooring in building with commercial-grade laminate vinyl plank flooring. SF 750 $________ $________

OPTION 4

Bullards Barracks - 1049 Est. 2,128 Sq. Ft.

Constructed 1967

Renovate bathroom (includes replacing all fixtures, shower/tub, toilet, cabinets flooring, paint)

Lump Sum 1 $________ $________

0033 Remove and replace all doors and locks Each 7 $________ $________

Remove and replace all linoleum flooring in building with commercial-grade laminate vinyl plank flooring. SF 600 $________ $________

Total Option 4 $

Total Base Items $

Total Option 1 $

Total Option 2 $

Total Option 3 $

Total Option 4 $

Total Base + Option Items $

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL

REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* One award will be made from this solicitation, contractors must submit pricing for all items.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Company Name: POC & Title:

Email: Phone Number:

UEI Number: Tax ID:

PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
Updated 9/10/26
B.2 SCHEDULE NOTES

File details come from the government source that posted it. Updated .