Attachment 2 Updated Schedule of Items.pdf
PDF 154 KB Posted
- Attached to
- GAOA Barracks Renovation Phase 2 Tahoe NF
- Solicitation number
- 127EAX26Q0088
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items for a fixed-price construction contract containing base construction items and four optional work items. The solicitation was updated on 9/10/26 and requires one award with pricing submitted for all items.
Base construction work includes renovation and repairs to five buildings: Sierraville Barracks (1033), Sierraville Ranger Residence (1029), Foresthill Residence C (1015), Foresthill Residence (1016), Foresthill Barracks (1017), and Engine Barracks (0018). Work scopes vary by building but generally include bathroom renovations with fixture replacement, door and lock replacement, flooring replacement with commercial-grade laminate vinyl plank, kitchen cabinet and countertop replacement, roof replacement with 50-year composition shingles, and exterior siding work. Item 0001 is mobilization. Square footage ranges from 825 to 2,720 square feet across the buildings, with construction dates ranging from 1934 to 1967. Optional items include flooring replacement only at Big Bend Residence (1022), Big Bend Barracks (1028), Bullards Residence (1008), and Bullards Barracks (1049). Pricing is structured with unit prices for individual items and lump sum pricing for specific renovations. Quantities are estimated, and the contractor must field verify to satisfy all requirements of drawings, statement of work, and specifications. Bond premiums per FAR Clause 52.232-5 shall not be added in addition to the contract price. The form includes spaces for contractor company name, point of contact, email, phone number, UEI number, and Tax ID.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 2 -9 Sep 26.pdf | ||
| 127EAX26Q0100 Amendment 1.pdf | ||
| Questions and Answers 2 Sep 26.pdf | ||
| Attachment 6 Foresthill Map.jpg | JPG image | |
| Attachment 8 Wage Determination.pdf | ||
| 127EAX26Q0088 GAOA Barracks Renovation Phase 2.pdf | ||
| Attachment 7 Sierraville Map.jpg | JPG image | |
| Attachment 2 Schedule of Items.docx | DOCX document | |
| Attachment 3 Statement of Work.pdf | ||
| Attachment 4 Big Bend Map.jpg | JPG image | |
| Attachment 5 Bullards Map.jpg | JPG image |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
Updated 9/10/26
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QT
Y.
UNIT
PRICE
TOTAL
PRICE
Mobilization
1 $________ $________
Sierraville Barracks – 1033
Est. 2720 Sq. Ft.
Year built - 1958
Major remodel in 1990
Renovate bathroom (includes replacing all fixtures, shower/tub, toilet, cabinets flooring, paint)
Lump Sum 1 $________ $________
0003 Remove and replace all doors and locks Each 7 $________ $________
Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 2720 $________ $________
Remove and replace all kitchen cabinets and countertops
Lump Sum 1 $________ $________
0006 Replace roof with 50-year composition shingle style materials.
Lump Sum
Total Sierraville Barracks 1033 $
Sierraville Ranger Residence – 1029
Est 1208 Sq. Ft.
Constructed in 1938
Remove and replace all doors and locks Each 3 $________ $________
0008 Refinish all wood floors SF 1208 $________ $________
Remove and replace all kitchen cabinets and countertops
Lump Sum 1 $________ $________
0010 Replace roof with 50-year composition shingle style materials.
Lump Sum
Install all new horizontal wood siding on top of asbestos siding to match existing buildings, make building watertight.
Lump Sum 1 $________ $________
Total Sierraville Barracks 1029 $
Foresthill Residence C – 1015 Est 1,005 Sq. Ft.
Constructed in 1934 fixtures, shower/tub, toilet, cabinets flooring, paint)
Lump Sum 1 $________ $________
0013 Remove and replace all doors and locks Each 10 $________ $________
Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 1005 $________ $________
Remove and replace all kitchen cabinets and countertops
Lump
Total Foresthill Residence C – 1015 $
Foresthill Residence – 1016 Est 825 Sq. Ft.
Constructed in 1947 fixtures, shower/tub, toilet, cabinets flooring, paint)
Lump Sum 1 $________ $________
0017 Remove and replace all doors and locks Each 7 $________ $________
Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 825 $________ $________
Remove and replace all kitchen cabinets and countertops
Lump
Total Foresthill Residence – 1016 $
Foresthill Barracks – 1017 Est 2,535 Sq. Ft.
Constructed 1934 fixtures, shower/tub, toilet, cabinets flooring, paint)
Lump Sum 1 $________ $________
0021 Remove and replace all doors and locks Each 14 $________ $________
Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 2535 $________ $________
Remove and replace all kitchen cabinets and countertops
Lump
Total Foresthill Barracks - 1017
Engine Barracks – 0018 Est. 2,000 Sq. Ft.
Constructed 1967
Renovate bathroom (includes replacing all fixtures, shower/tub, toilet, cabinets flooring, paint)
Lump Sum 1 $________ $________
0025 Remove and replace all doors and locks Each 9 $________ $________
Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 2000 $________ $________
Remove and replace all siding with Horizontal Hardy board type siding material. Make watertight. SF 4200 $________ $________
Remove and replace all kitchen cabinets and countertops
Lump
Total Engine Barracks – 0018 $
OPTION 1
Big Bend Residence - 1022 Est. 1,220 Sq. Ft.
Constructed 1966
Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 1220 $________ $________
OPTION 2
Big Bend Barracks - 1028 Est. 1,633 Sq. Ft.
Constructed 1959
Remove and replace all carpet and flooring in building with commercial-grade laminate vinyl plank flooring where there is linoleum. SF 1633 $________ $________
OPTION 3
Bullards Residence - 1008 Est. 1,640 Sq. Ft.
Constructed 1967
Remove and replace all linoleum flooring in building with commercial-grade laminate vinyl plank flooring. SF 750 $________ $________
OPTION 4
Bullards Barracks - 1049 Est. 2,128 Sq. Ft.
Constructed 1967
Renovate bathroom (includes replacing all fixtures, shower/tub, toilet, cabinets flooring, paint)
Lump Sum 1 $________ $________
0033 Remove and replace all doors and locks Each 7 $________ $________
Remove and replace all linoleum flooring in building with commercial-grade laminate vinyl plank flooring. SF 600 $________ $________
Total Option 4 $
Total Base Items $
Total Option 1 $
Total Option 2 $
Total Option 3 $
Total Option 4 $
Total Base + Option Items $
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL
REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* One award will be made from this solicitation, contractors must submit pricing for all items.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
Company Name: POC & Title:
Email: Phone Number:
UEI Number: Tax ID:
| PART I—THE SCHEDULE |
| SECTION B-- SCHEDULE OF ITEMS |
| B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION) |
| Updated 9/10/26 |
| B.2 SCHEDULE NOTES |
File details come from the government source that posted it. Updated .