This document is a Schedule of Items pricing template for the Skidmore Day Use Improvements project located in the Verde Ranger District of the Prescott National Forest in Southwest Region 3.

The project comprises two bid components: a Base Bid and an Option Bid. The Base Bid includes 33 line items covering site preparation, earthwork, surfacing, accessibility improvements, and amenity installation. Base bid items include mobilization and bonding (1 LS), clearing and grubbing (8,000 SY), excavation (923 CY), embankment (867 CY), earthwork compaction for roads and parking areas (5,807 SY), surface course materials including M.A.G. base and crushed concrete/asphalt blend (631 CY total), accessible parking stalls in concrete (651 SF), accessible paths (180 SF), and various site amenities such as grills (2 EA), picnic tables (2 EA), parking bumpers (14 EA), trash cans (1 EA), a culvert (1 EA), and 2-rail steel barriers (891 LF). The Option Bid consists of five additional line items including subgrade and aggregate compaction testing (1 LS), ramada installations (2 EA), a double vault toilet (1 LS), and additional 2-rail steel barrier sections totaling 1,400 LF. Contractors must provide unit prices for each line item, with total costs calculated by multiplying unit price by quantity for all items in both bid categories.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Skidmore Day Use Improvements Region: Southwest Region 3 Forest: Prescott National Forest District: Verde Ranger District

Base Bid Line Items

151 (01) Mobilization / Bonding LSQ 1 LS $

152 (01) Construction Survey and Staking LSQ 1 LS $

154 (01) Sampling and Testing, Concrete LSQ 1 LS $

157 (01) SWPPP / Erosion Control Implementation LSQ 1 LS $

158 (01) Watering for Dust Control LSQ 1 LS $

201 (01) Clearing and Grubbing EQ 8000 SY $

203 (01) Demolition, Veg., Tree-Limbing LSQ 1 LS $

204 (01) Excavation EQ 923 CY $

204 (02) Embankment EQ 867 CY $

204 (03) Earthwork Compaction, Road / Parking Areas EQ 5807 SY $

204 (04) Earthwork Compaction, Day Use and Path Areas EQ 883 SY $

211 (01) Roadway Obliteration LSQ 1 LS $

251 (01) Riprap, 6"-8", 8" Depth EQ 304 CY $

251 (02) Landscape Boulders, 24" - 36" AQ 40 EA $

301 (01) Surface Course, M.A.G. Base, Lower Parking Area EQ 198 CY $

301 (02) Surface Course, Crushed Concrete / Asphalt Blend, Upper Roads and Parking EQ 422 CY $

301 (03) Surface Course, Crushed Concrete / Asphalt Blend, Upper Paths EQ 11 CY $

311 (01) Surface Course, 1/2" DG w/ Stabilizer, Lower Paths EQ 32 CY $

311 (02) Surface Course, 1/2" DG w/ Stabilizer, Day Use Pads EQ 10 CY $

501 (01) Accessible Parking Stall, Concrete, 6" EQ 651 SF $

501 (02) Accessible Parking Stall, Van Horn Roll, 18" EQ 43 LF $

501 (03) Accessible Parking Stall, Pavement Markings LSQ 1 LS $

501 (04) Accessible Paths, Concrete EQ 180 SF $

600 (01) Grill, Pedestal, w/ Footing, Install Only AQ 2 EA $

600 (02) Picnic Table, Install Only AQ 2 EA $

600 (03) Parking Bumper, Rubber, 72"L X 6"W X 4"H AQ 14 EA $

600 (04) Trash Can, Bear-Saver, Install Only, w/ Conc. Pad AQ 1 EA $

602 (01) Culvert, Galv. Steel, 20', 18" Dia., w/ Bedding AQ 1 EA $

619 (01) Barrier, 2-Rail, w/ Posts, Steel EQ 891 LF $

633 (01) Traffic Signs and Posts, By Location AQ 9 EA $

Option Bid Line Items

154 (02) Sampling and Testing, Subgrade & Aggregate Compaction LSQ 1 LS $

600 (05) Install Ramada, w/ Footings AQ 2 EA $

600 (06) Install Vault Toilet, Double, Clovermist LSQ 1 LS $

619 (02) Barrier, 2-Rail, w/ Posts, Steel, East Boundary to Mesa Drive EQ 765 LF $

619 (03) Barrier, 2-Rail, w/ Posts, Steel, West Boundary from Toilet to Mesa Drive EQ 635 LF $ $

SCHEDULE OF ITEMS

Schedule of Item DesciptionItem Number

Total Cost

OPTION BID TOTAL

Unit Price

Method of Measure

CLIN Description

Method of Measure

Quanti ty

Quanti ty

Pay Unit

Unit Price

Pay Unit

Total Cost

BASE BID TOTAL

Item Number