This is a technical installation and detail drawing document for telecommunications and utility infrastructure. The document, dated 1/26/2026 and prepared by ADI & PIAB for the U.S. Forest Service, provides comprehensive specifications for electrical and physical installations required for forest service operations.

The drawings detail multiple equipment installations and configurations, including: a 24 or 48-port CAT 6 19-inch rack-mount patch panel; a typical telecom data outlet box with specifications for conduit entrances, lockable doors, and plexiglas locking enclosures; grounding rod and bonding details with specific cable specifications and copper conductor requirements; a trench detail for conduit installation with concrete cover and bedding specifications; a ground bar detail for bonding jumpers and stranded bare copper conductors; and a telecom rack elevation showing component layout and positioning. The document includes critical notes specifying that all electrical work must be installed per NEC by licensed electricians, that the graphics represent typical small AG internet equipment installations, and that specific equipment placement and quantities must be verified with the IT project manager. Additional requirements include installation of 24-inch minimum cabinet height, provision of plexiglas locking doors, double-hinged swing-out access, 1.9KVA UPS mounting in rack, and various copper bonding and grounding specifications per industry standards. The drawing is marked as Version 2.00 and includes a scale in inches for reference.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .