This document contains a summary of a site visit for the Luna Fire Recovery Road Work federal contract opportunity. The key details are:

The solicitation number is 127EAX24R0012 and the contract is for repairing four National Forest Service System Roads (NFSRs) on the Camino Real District of the Carson National Forest in Taos County, New Mexico. The roads include NFSR 76 (29.7 miles total), NFSR 17 (4 miles total), NFSR 440 (10.55 miles total), and NFSR 440M (1.94 miles total). The work required includes road reconditioning, ditch and drainage maintenance, cattle guard removal/replacement, culvert installation, and drain dip construction. The bid due date is May 28, 2024 at 8:00 am CDT. The document also provides details on maintenance levels, equipment usage, water rights, and compaction requirements. Additional information is requested regarding culvert locations, cattleguard details, and drainage dip construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Luna Fire Recovery Road Work Site Visit 05/15/2024 Attendees:

Name(s)
Company
Email(s)
Jose Lopez
MeniDian
J.Lopez@MeniDiancon.net
Jason Mortimer
B & B Crane
Jason@BBCRANE.net
Freddie Lopez
SBS Solutions
construction@SBSolutionsnm.com

Matthew Vigil Adrian Vigil

Valle Bonito Const.
adrian.vigil64@gmail.com
Arturo Crespin
Crespin’s Site Services
ajcrespin2s@gmail.com
Peter Romero
Sierra Blanca Landscaping
SierraBlancaLandscaping.com
Fidel Duarte
Duarte Excavations
DUARTEEXCAVATING@gmail.com
Ben Loftin
Crowley Holdings LLC
Benjamin@crowleyHoldingsllc.com
Gilbert Almager + 3 others
Stonebridge Construction
gilbert@stonebridgeNM.com

505-977-2016

Sites visited:

1. 440 / 440M

a. Had to turn around at around 439A intersect due to snow

b. All attendees were present for these roads

2. 76

a. Had to turn around about 1/3 of the way from hwy 518 due to snow

b. Not all attendees were present for these roads Due to current access limitations, additional images of the sites were located and included at end of this document. All the contract roads are considered at an open status, so contractors are permitted to visit the sites we saw without government personnel present if interested.

Topics Discussed:

· Deadlines

· 27th for Questions.

· My email is lindsay.numair@usda.gov but all questions and contact prior to award need to need to go through Troy ( troy.mccullough@usda.gov )

· 28th for bids.

· Maintenance Levels (MLs)

· Typically, ML2s are passable in a high clearance vehicle.

· In this instance, the intent of the road work is for restoration related equipment to access roads.

· Typically, ML2 roads do not have culverts installed but it is possible for them to have been installed under previous administration.

· ML3s are required to be passable in a low clearance vehicles.

· Aggregate option item

· Is funding dependent .

· For ML-2 roads only spot surfacing is incorporated into maintenance.

· Forest Service personnel will flag these section if option items are funded.

· Equipment

· No exclusions for what equipment can be used.

· It’s important to note water rights are complicated in this area and coordination would need to occur if contractor is interested in using a water tank and filling up using nearby streams. Please see section 204.11 of ‘Luna Fire Task Order FSSS’ for compaction expectations.

· No official staging area.

· NFSR 440M

· Contract includes drain dips.

· Picture included in ‘additional images’ section at end of document for those who were not able to walk the road.

· It has been reported that a washout has occurred following this picture being taken and the road now has increased rutting.

· NFSR 76

· Popular recreation destination so expect increased public traffic in this area.

· Road closure is allowed with proper coordination.

· This would involve the COR coordinating with the District Ranger.

· Request of road closure must occur at least 14 days prior to anticipated need.

· Other

· All contract documents can be found on SAM.gov

· Copies of the Schedule of Items, Statement of Work, and drawings were present and referenced at the site visit.

· Engineers estimates are for internal government use only and are not able to be shared with the public.

Follow Up Work / Requested Information:

· Coordinates of culverts and cattleguard

· NFSR 440 culvert removal and replacement

· 35 ft long culvert at 36.25275041, -105.5526053

· NFSR 17 fish barrier crossing installation

· 36 ft long culvert at 36.222094, -105.352724

· NFSR 76 culvert installation

· 35 ft long culvert at 36.14598699, -105.4554595

· 35 ft long culvert at 36.29644335, -105.3181484

· NFSR 76 culvert removal and replacement

· 35 ft long at 36.24039471, -105.3973356

· NFSR 76 cattleguard maintenance and replace wingwalls

· CG maintenance and 2 wingwall replacements at 36.29919748, -105.3176432

· CG maintenance and 2 wingwall replacement at 36.27158778, -105.32211

· NFSR 76 cattleguard remove and replace

· 18 ft CG at 36.15082929, -105.4567202

· Drainage dip drawing features 2 different sizes

· Measurements from table in drawing differ based off grade of dip location. Unfortunately, we do not currently have the grade data for each dip needing maintenance or construction.

· Compaction specs

· See section 204.11 of ‘Luna Fire Task Order FSSS’ for compaction options.

· FSSS = Forest Service Specific Specifications

1. Is the bid date, May 27, 2024, 08:00 am Central Daylight Time (MEMORIAL DAY) correct?

0. Bid due date was updated to May 28, 2024, 0800 am CDT.

1. Drainage Dip Construction – The Bid Schedule Item 0001 – Drainage Dip Construction has 10 EA but Drawing Sheet No. 04 has two separate sizes.

1. Please clarify how many of each size are requested.

0. Unfortunately, we do not currently have the grade data for each dip needing maintenance or construction.

1. Drawing Sheet No. 06 – Details two separate gate details.

2. Please clarify if Optional Item 2 (Gate 2, Single Swing System) coincides with the Bid Schedule Item 0001 – Install New Gate – Single Arm

0. The gate was a part of the base contract Schedule of Items. Please see the SOI and the 1442.

1. Drawing Sheet No 03 does not show where the following items are to be installed.

3. Item 0001 Culvert, Remove & Replace – 24”

3. Item 0001 Culvert, Install – 24”

3. Item 0001 Culvert, Install – 48”

2. Answered in site visit summary above.

1. Please provide details for the Cattleguards

4. There are no standard details for cattleguards. In general, though I recommend they are familiar with the Forest Service Specific Specs (FSSS) and FP-14 specs as those are what the contract follows and goes more in depth of expectations than the SOW. The FP14 does include more than what is included in this contract but the first 3 numbers of the work items in the SOI should help guide them on what sections are relevant.

1. Please provide a material specification on the Untreated Aggregate Course (Items 0002 & 0003).

5. Will these bid items also include the Placement, Compaction, Finishing required as well OR are these Material Only bid Items?

0. The aggregate option items will include the furnishing, hauling, and placing of aggregate.

1. Solicitation Cover Page, NSFR 17, the second bullet mentions a Culvert/Fish Barrier Construction. Please provide the details for this construction.

6. There is no standard FS detail for the fish crossing. It’s essentially just an elevated culvert. This was called out differently in the contract than the other culverts to better illustrate the environment in which it will be installed.

Additional Images:

NFSR 440M:

^NFSR 440M taken summer of 2023.

NFSR 76:

All NSFR 76 photos are of the road section not viewed during the site visit.

^NFSR 76 taken summer of 2023.

^NFSR 76 taken summer of 2023.

^NFSR 76 taken summer of 2023.

^NFSR 76 taken summer of 2023.

^NFSR 76 taken summer of 2023.

NFSR 17:

^NFSR 17 fish crossing photo taken summer of 2023. Location: (Lat: 36.22207 Lon: -105.35268)

^NFSR 17 taken summer of 2023.

^NFSR 17 taken summer of 2023.

image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png

File details come from the government source that posted it. Updated .