127EAX23Q0036 Guajalote Amend II Site visit and RFI response.pdf
PDF 293 KB Posted
- Solicitation number
- 127EAX23Q0036
About this file
This document contains a federal contract solicitation for the Guajalote Material Source Site development and stockpiling project. The scope of work involves clearing, grubbing, topsoil stripping and stockpiling, rock blasting, excavating, crushing and stockpiling aggregate to produce a surface coarse gradation. The contractor must provide all equipment, labor, and incidentals to complete the work in compliance with FP-14 and FSSS specifications. The project location is in the Patagonia Mountain range on the Coronado National Forest in Arizona. The solicitation is a 100% small business set-aside with Davis Bacon wages applying. Interested vendors must be registered in SAM and submit a business and technical proposal in response to sections B, K, and M of the solicitation by June 13, 2023. Award will be made using best value tradeoff with price and technical factors considered.
The document provides a site visit date and contact, answers pre-bid questions on work timing and safety considerations, and identifies resources for aggregate testing. Payment and performance bonds are required. The contracting officer point of contact is provided for questions by June 1st.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
127EAX23Q0036
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ALBUQUERQUE NM 87102
333 BROADWAY SE
SOUTHWESTERN REGION
109290105/09/2023
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/09/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment II is being put into place to:
1. Provide Site Visit Sign-in Sheet - page 3
2. Provide RFI responses - page 4 & 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
All Other Terms and Conditions Remain the Same
CORONADO NATIONAL FOREST
300 WEST CONGRESS
TUCSON AZ 85701 US
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
127EAX23Q0036
FOB: Destination
0001 Guajalote Material Source Site
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Guajalote Pre-Bid Ques�ons
May 23, 2023
Q: Why does the contract have the route to the project site star�ng in Nogales?
A: There are several ways to get to the project site. The USFS encourages bidders to evaluate the different routes and choose the route that works best for them when calcula�ng costs.
Q: Are there any restric�ons on the �ming of crushing and stockpiling opera�ons (�me of day, day of week, month of year)?
A: Work can only occur during daylight hours; no ar�ficial light may be used. There are no other �ming restric�ons, including for threatened or endangered species.
Q: Will the limits of the quarry be flagged?
A: Yes, the corners will be marked with a stake and flagging.
Q: Will the USFS give NTP right before Monsoon Season?
A: The USFS will consider seasonal weather paterns and their effects on working condi�ons, including the condi�on of the roads that provide access to the site, when deciding when to give NTP.
Q: Are there any safety concerns in the project area?
A: Wildlife concerns include large cats, black bears, ratlesnakes, and bee swarms. The project is located in southern Arizona where illegal border crossing ac�vity is a concern. It is the contractor’s responsibility to provide the level of security deemed necessary by the contractor.
Q: The contract requires the work to be completed in 60 days, is the USFS willing to allow more �me?
A: It is the government’s determina�on that the project will take 60 days. The government will however work with the contractor to complete the job in the alloted �me. Stop work orders and resume orders can be used as needed to accommodate unforeseeable or uncontrollable challenges in the field. An extension would be considered if necessary and submited in a �mely manner.
Q: Will the contractor have to remove the BMPs (silt fence, watles) from prior to demobiliza�on?
A: The contractor shall remove all BMPs that are not biodegradable and all BMPs which are no longer func�onal.
Q: Will the contractor be responsible for maintaining the access road?
A: The road will be constructed to last through the period of performance. In the unlikely event that the road requires maintenance, the FS will make the necessary repairs in a �mely manner.
Q: The federal road specs require the material being produced to be tested every 1,000 cuyd, if the operator shows that they are consistently producing material within specs, can the frequency of tes�ng be reduced?
A: It is possible; however, it will be at the discre�on of the CO following input from the COR and possibly a technical advisor.
Q: Where is the nearest/most convenient aggregate tes�ng business?
A: One poten�al source is:
Turner Laboratories
2445 N. Coyote Drive, Suite 104, Tucson, AZ 85745. 520-882-5880. www.turnerlabs.com sales@turnerlabs.com
Q: Where should the contractor store trash, soil, and vegeta�on?
A: All material stockpiles must be within the iden�fied boundary of the quarry. It is the contractor’s responsibility to es�mate the volume of stockpiles and plan their loca�ons accordingly.
Q: Who will measure the amount of aggregate produced?
A: It is the contractor’s responsibility to quan�fy the aggregate produced and provide documenta�on to the COR. The COR will also make independent measurements intermitently for quality control.
Q: Are there any seeding requirements for this project?
A: Clearing and grubbing is only to occur to the extent required for obtaining enough rock to produce the required aggregate quan�ty. If bare earth is le� exposed due to clearing and grubbing beyond the extent needed, then the USFS may require that the area be seeded.