SPECIFICATIONS FOR 030903
HORSETHIEF LOOKOUT REPAIRS
SUMMARY OF WORK
PART 1 - GENERAL
1.1 - Location The project is located at Horsethief Lookout Tower on the Prescott National Forest.
1.2 - Government Furnished Facilities and Materials
1. A staging area will be provided for the Contractor's equipment and supplies.
2. Upon completing the work, the Contractor shall leave the staging area in a clean, neat, and orderly condition.
3. Electricity, water, and phone lines are not available. The Contractor will be responsible for all utility services.
1.3 - Clean up and Disposal
Disposal of waste material will be off National Forest Land and in compliance with local laws regarding disposal of construction waste.
1.4 - Precautionary Measures Protection of Work
The Contractor shall take precautions to protect all work during the construction period and shall provide and maintain adequate protection during severe weather conditions to prevent damage to the work and the materials.
Safety
The Contractor is responsible for safeguarding employees, existing facilities and forest resources from his operations. The Contractor shall barricade or otherwise make unguarded excavations safe. Signs, lights, barricades and other devices, as necessary, shall be maintained at night and on weekends. Precautions such as lowering tractor blades and safely storing materials shall be practiced to prevent injury to others in the area.
Security
No security shall be provided by the government. The contractor shall take all precautions deemed necessary to secure the worksite, improvements and equipment.
The campground area is inside a restricted area closed to the general public. All employees of the Contractor or any subcontractors may be required to prove that they are employees of of the subject companies.
ABBREVIATIONS - 01101
Organizations & Standards Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows.
Reference to a specific standard of specification shall mean the latest edition or amendment in effect on date of invitation to bid.
AASHTO--American Association of State Highway and Transportation Officials ACI--American Concrete Institute AISC--American Institute of Steel Construction AISI--American Iron and Steel Institute AITC--American Institute of Timber Construction ANSI--American National Standards Institute APA--American Plywood Association API--American Petroleum Institute ASME--American Society of Mechanical Engineers ASTM--American Society for Testing and Material ATCC--American Type Culture Collection AWPA--American Wood Preservers Association AWPB--American Wood Preservers Bureau AWS--American Welding Society AWWA--American Water Works Association CFR--Code of Federal Regulations CRSI--Concrete Reinforcing Steel Institute CS--Commercial Standard issued by U.S. Department of Commerce DEMA--Diesel Engine Manufacturers Association FAR--Federal Acquisition Regulation FED SPEC. or FS-- Federal Specifications FSS--Federal Specifications and Standards GSA--General Services Administration MIL--Military Specifications MSHA--Mine Safety and Health Administration MUTCD--Manual on Uniform Traffic Control Devices NBFU--National Board of Fire Underwriters NBS--National Bureau of Standards NEMA--National Electrical Manufacturers Association NESC--National Electrical Safety Code NFPA--(Fire)--National Fire Protection Association NFPA--(Forest)--National Forest Products Association NWMA--National Woodwork Manufacturers Association OSHA--Occupational Safety and Health Administration PCA--Portland Cement Association PCI--Prestressed Concrete Institute PS--Product Standard issued by the U.S. Department of Commerce PTI--Post-Tensioning Institute RIS-Redwood Inspection Service SAE--Society of Automotive Engineers SF--Standard Form SSPC--Steel Structures Painting Council
UL--Underwriter's Laboratories, Inc.
USASI--United States of America Standards Institute WCLIB--West Coast Lumber Inspection Bureau WWPA--Western Wood Products Association
Pay Items & Pay Units
ABBREVIATIONS
Aluminum . . . . . . . . . . . . . . . . . . . . AL.
Asphalt . . . . . . . . . . . . . . . . . . . . ASP.
Barbed Wire . . . . . . . . . . . . . . . . . . B.W.
Bituminous Coated Corrugated Steel Pipe. . . . B.C.C.S.P. OR B.C.C.S.
PIPE
Bituminous Surface Treatment . . . . . BST Cement . . . . . . . . . . . . . . . . . . . . . CEMT.
Cement Treated . . . . . . . . . . . . . . . . . CEMT.-T.
Cement Treated Base . . . . . . . . . . . CTB Clearing & Grubbing . . . . . . . . . . . . . CLEAR & GRUB Compaction . . . . . . . . . . . . . . . . . . . . . CMPCT.
Concrete . . . . . . . . . . . . . . . . . . . . . . . CONC.
Corrugated Metal Pipe . . . . . . . . . . . CMP Corrugated Steel Pipe . . . . . . . . . . . C.S.P.
Corrugated Steel Pipe Arch . . . . . . . . . C.S.P. ARCH Cubic Yard . . . . . . . . . . . . . . . . . . . . . C.Y.
Cubic Yard Mile . . . . . . . . . . . . . . . . C.Y.MI.
Diameter . . . . . . . . . . . . . . . . . . . . . . . DIA.
Each . . . . . . . . . . . . . . . . . . . . . . . . . . EA.
Emulsified . . . . . . . . . . . . . . . . . . . . . EMLSFD.
Erosion and Pollution Control . . . . . E&P CONTROL Fabricated . . . . . . . . . . . . . . . . . . . . . FABR.
Finish Floor Elevation . . . . . . . . . . . . F.F.E.
Foundation . . . . . . . . . . . . . . . . . . . . . FOUND.
Furnished . . . . . . . . . . . . . . . . . . . . . FURN.
Gallon . . . . . . . . . . . . . . . . . . . . . . . . . GAL.
Grade . . . . . . . . . . . . . . . . . . . . . . . . GR.
Height . . . . . . . . . . . . . . . . . . . . . . . . HT.
High Strength . . . . . . . . . . . . . . . . . H. STRENGTH Horizontal . . . . . . . . . . . . . . . . . . . . . HOR.
Hour . . . . . . . . . . . . . . . . . . . . . . . . . HR.
Linear Foot . . . . . . . . . . . . . . . . . . . L.F.
Liquid . . . . . . . . . . . . . . . . . . . . . . . . LIQ.
Loading . . . . . . . . . . . . . . . . . . . . . LD.
Lump Sum . . . . . . . . . . . . . . . . . . . . L.S.
Material . . . . . . . . . . . . . . . . . . . . . . . MAT'L Maximum . . . . . . . . . . . . . . . . . . . . . MAX.
Method . . . . . . . . . . . . . . . . . . . . . . . . M.
Mile . . . . . . . . . . . . . . . . . . . . . . . . . . MI.
Minimum . . . . . . . . . . . . . . . . . . . . . MIN.
One Thousand Feet Board Measure . . . MFBM One Thousand Gallons . . . . . . . . . . . . . M.GALS.
One Thousand Gallons Mile . . . . . . . . M.GALS.MI.
One Thousand Square Feet . . . . . . . . . . M.S.F.
Polyvinylchloride . . . . . . . . . . . . . . . . PVC Pounds . . . . . . . . . . . . . . . . . . . . . . . . . LBS.
Reflectorized . . . . . . . . . . . . . . . . . . . REFLECT.
Section . . . . . . . . . . . . . . . . . . . . . . . . SEC.
Square Foot . . . . . . . . . . . . . . . . . . . . S.F.
Square Yard . . . . . . . . . . . . . . . . . . . S.Y.
Station . . . . . . . . . . . . . . . . . . . . . . . STA.
Station Yard . . . . . . . . . . . . . . . . . . . . STA. YD.
Strand . . . . . . . . . . . . . . . . . . . . . . . . . S.
Structural . . . . . . . . . . . . . . . . . . . . . . STRUCT.
Structural Steel . . . . . . . . . . . . . . . . . S. STEEL Stump . . . . . . . . . . . . . . . . . . . . . . . STMP Target Value . . . . . . . . . . . . . . . . . . . TV Thickness . . . . . . . . . . . . . . . . . . . . TH.
Ton Mile . . . . . . . . . . . . . . . . . . . . . . T.M.
Tops and Limbs . . . . . . . . . . . . . . . . . T&L Utilization of Timber . . . . . . . . . . . . UOT Vertical . . . . . . . . . . . . . . . . . . . . . . . VERT.
Welded Wire Fabric . . . . . . . . . . . . . . W.W.F.
White . . . . . . . . . . . . . . . . . . . . . . . . WH.
Width . . . . . . . . . . . . . . . . . . . . . . . . W.
With . . . . . . . . . . . . . . . . . . . . . . . . . . W/ Without . . . . . . . . . . . . . . . . . . . . . . W/O Woven wire . . . . . . . . . . . . . . . . . . . . W.W.
Yellow . . . . . . . . . . . . . . . . . . . . . . . . YE.
END OF SPECIFICATION 01101
01103 – MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 – Requirements:
Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the
SCHEDULE OF ITEMS.
1.2 – Measurement Terms and Definitions:
Unless otherwise specified, the following terms are defined as follows:
Each. One entire unit. The quantity is the actual number of units completed and accepted.
Linear foot. As applicable, measure the work along its length from end-to-end;
parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps.
Lump sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. The quantity is designated as "1." Estimated quantities of lump sum work shown in the contract are approximate.
Square yard Longitudinal and transverse measurements for area computations will be made horizontally. No deductions from the area computation will be made for individual fixtures having area of 9 square feet or less.
1.3 – Units of Measurement
Payment will be by units defined and determined according to U.S. Standard measure
1.4 – Payment One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item.
A. Designed Quantities (DQ): These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units of the originally contemplated work will not be made unless authorized under one or more of the following conditions:
1. As a result of changes authorized by the Contracting Officer in the originally contemplated work. Minor changes to adjust balance points, etc., will not be considered changes in quantities.
2. As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities, that cause a pay item to change by 15 percent.
3. As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
B. Actual Quantities (AQ): These quantities are determined from measurements of completed work.
Final payment will be made for the actual quantities at the unit price shown in the SCHEDULE OF ITEMS, subject to the Variation in Quantities Provision.
C. Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
END OF SPECIFICATION 01103
SUBMITTALS - 01300
PART 1 - GENERAL
1.1 - Requirements It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten days for processing of submittals by the Government.
Submittals may also be referred to as shop drawings.
1.2 - Manufacturer's Literature and Shop Drawings Submit three copies to the COR for approval on the items required herein.
Submittal specifications are to be submitted in the following format:
A. The specifications and salient qualities of the item specified in the contract.
B. The specifications and salient qualities of the submittal item.
C. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.
D. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.
E. Shop drawings of submitted item(s) including wiring or layout diagrams.
If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed.
If the specified item is to be handicapped accessible the submittal item needs to show handicapped access on submitted drawings, not just state it is available as handicapped accessible.
Submittals will be waived if contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.
Submittals are required per the following sections:
1. 07410 Preformed Metal Roofing Shop Drawings Product Data Samples Installation Manual
2. 08521 Vinyl Windows Shop Drawings Product Data
3. 08800 Glass and Glazing Product Data Certificate of Compliance Compatibility and Adhesion Test Report
4. 09900 Painting Samples
END OF SPECIFICATION 01300
QUALITY CONTROL AND QUANTITY MEASUREMENT - 01400
PART 1 - GENERAL
1.1 - Description This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.2 - Submittals
Submittals under this section shall be furnished to the COR. Submittals include but are not limited to the items shown below and as listed in specification 01300:
Contractor's Representative - On-The-Job Superintendent Quality Control Plan As Built Drawings Certificates of Compliance Quantity Measurements Bill of Ladings Operation and Maintenance Manuals
PART 2 - EXECUTION
3.1 - Contractor's Representative Submit a letter to the Contracting Officer stating the name of the on-the-job superintendent or representative for the Contractor and the duties and authorities of the representative during work under this contract.
3.2 - Quality Control Plan
(a) Quality Control Plan. The contractor shall submit in writing the following:
(1) Authorities and responsibilities of inspection and testing personnel.
(2) Experience and qualifications of inspection and testing personnel to be assigned and name and location of any (for hire) testing facility to be used.
(b)Approval of Quality Control Plan. The contractor's proposed quality control plan for all items requiring quality control shall be submitted to the COR for review prior to the contractor commencing work. Within 5 days of receipt of the plan, the COR shall notify the contractor whether the plan adequately covers quality control requirements. Construction work shall not be performed prior to contractor's receipt of written approval of the proposed plan. The contractor shall submit to the COR, in writing, any proposed changes in the approved quality control plan.
Proposed changes shall not be put into effect until approved in writing by the COR.
All work shall comply with local applicable codes and codes referenced in individual sections of the technical specifications.
The contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications shall be made as required by the drawings and specifications. The contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite.
(c)Inspection and Tests. The contractor shall maintain current records of all inspections and tests performed. The following information will be acceptable to the Government:
PROJECT NAME:_____________________CONTRACT No.____________
Pay Item No. Test Date Location Standard Results Test By
(Initials)
The contractor shall engage inspection and testing agencies which are prequalified as complying with the recommendations of "Independent Laboratory Qualification" by the American Council of Independent Laboratories, and which specialize in the types of inspections and tests to be performed.
The contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.
3.4 - As Built Drawings
The contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as built drawings shall be submitted to the COR.
Offsite Produced Materials
The contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Incidental purchases needed to remedy minor shortages of material shall be certified by the contractor. Earth, aggregate, and concrete material shall be certified and accurately completed indicating weights, volumes, and batch times where appropriate.
When the material sources are not designated as Government provided or the contractor elects not to use designated sources, the contractor shall be responsible for furnishing materials that produce an end product equivalent in performance to that originally designated and that meets contract specifications.
Quantity Measurements.
The contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ). The contractor shall compute the quantities for periodic progress payments; the COR will compute the quantities for the final payment based on measurements taken by the contractor. All contractor measurements are subject to verification. The contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
The following format or one containing the following information will be acceptable to the Government:
PROJECT NAME:_____________________CONTRACT No.____________
Quantity or
Pay Item No. Date Measurement Test By (Initials)
The contractor shall protect construction exposed by or for quality control service activities and protect repaired construction. Upon completion of inspection and testing repair damaged construction and restore substrates and finishes to eliminate deficiencies. The contractor is responsible for repair and protection of inspected work, whether inspection is performed by the contractor or by the Government.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement
There will be no separate measurement for this section.
4.2 - Payment
The accepted quantities will be paid for at the contract unit price for each pay item shown in the SCHEDULE OF ITEMS. Otherwise, quality control and quantity measurement shall be incidental to other specified work.
Payment will be prorated on the percentage of work accomplished and accepted on teh related pay item.
END OF SPECIFICATION 01410
MOBILIZATION - 01601
PART 1 - GENERAL
1.1 - Description
This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
PART 2 - PRODUCTS
NONE
PART 3 - EXECUTION
NONE
PART 4 MEASUREMENT AND PAYMENT
Progress payments will be made as follows:
The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon reciept of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.
(a) When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
(b) When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
(c) Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting Officer. In no circumstance will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.
The total of all payments shall not exceed the original contract amount for this item.
Payment will be made under:
PAY ITEM DESCRIPTION PAY UNIT
01601(01) Mobilization (Including Bonding Cost) . . . . . . . L.S.
END OF SPECIFICATION 01601
THERMAL AND MOISTURE PROTECTION
PREFORMED METAL ROOFING 07410
PART 1 - GENERAL
1.1 Scope
The extent of preformed metal panels are indicated on the drawings and by provisions of this section. The scope of work includes, but is not limited to preformed panels, related accessories, valleys, hips, ridges, eaves, corners, rakes, miscellaneous flashings and attaching devices.
1.2 - Related Work Specified Elsewhere
None
1.3 - Submittals Submit the manufacturer's current specifications and installation recommendations.
Provide samples at the request of the COR.
Submit shop drawings showing roof plans, profiles, details of forming, joining trim flashing and accessories. Show details of weatherproofing at edges, terminations and penetrations of metal roofing work.
2.1 - Metal Roofing System Use AEP-SPAN SNAP SEAM panels and accessories or approved equal.
Acceptable roofing systems shall conform to the following:
(1) A standing seam system with a UL 90 rating.
(2) System shall be engineered to withstand 50 psf wind uplift.
(3) Panels shall be 24 gauge.
(4) Panels and accessories shall be prefabricated and seams rolled in the manufacturer's plant.
(5) Color shall be approved by the COR.
2.2 - Substrate
Substrate shall be 3/4" ACX plywood with 30# roofing felt.
2.3 - Delivery Delivery of material shall be made only after suitable facilities for its storage and protection are available on the site.
Upon receipt of preformed metal panels, flat sheets, flashings and panel accessories;
installer shall examine each shipment for damage and for completeness of the consignment.
2.4 - Storage
Store materials out of the weather in a clean, dry place. One end of each container should be slightly elevated to allow any moisture to run off.
Panels and/or flashing with strippable film must not be stored in areas exposed to sunlight.
Care should be taken to prevent contact with any substance which may cause a discoloration in the finish during storage.
Store materials to provide ventilation and prevent bending, abrasion, or twisting.
2.5 - Handling
Care should be taken to avoid gouging, scratching or denting.
Do not allow traffic on completed roof. If required, provide cushioned walk boards.
Protect installed products from damage caused by foreign objects and adjacent construction until completion of project.
3.1 - Installation Workmanship shall conform to standards set forth in the architectural sheet metal manual as published by SMACNA.
Panels should be installed in such a manner that horizontal lines are true and level and vertical lines are plumb.
All starter and edge flashings shall be installed prior to panels.
Do not allow panels or trim to come into contact with dissimilar materials.
Exposed edges are permissible. However, efforts should be made to reduce the amount of exposed edges.
Screws and nails used in areas where the underlayment will be exposed shall not penetrate the plywood facing.
3.2 - Touch Ups
Only minor scratches and abrasions will be allowed to be touched up. any other damaged material shall be replaced.
3.3 - Clean Up Remove scrap and debris from surrounding area.
The work specified herein will not be measured for payment.
This work is incidental to other items in this contract and direct separate item payment will not be made.
END OF SPECIFICATION 07410
SECTION 08521 VINYL WINDOWS & DOORS
1.1 DESCRIPTION OF WORK
Replacement of Windows:
Work includes furnishing and installing seven (8) split pane – type windows. Frame openings for all the windows are approximately 66” x 51” per opening (opening is defined as a split pane wind with a stationary lower pane and a sliding open upper pane).
Contactor shall verify measurements for windows.
Work includes removal and disposal of old windows. Disposal shall be off Forest Service lands.
The new windows shall be similar in design with the existing windows on the top able to slide open on both sides or the sliding window be able to be removed for cleaning purposes. Windows shall be vinyl, double-pane, UV protected, windows. Contractor shall provide submittals of the windows to the Engineer for review. Installation shall be according to manufacturer’s recommendations. Windows shall be plumb and level.
Windows and frame shall be weathertight against wind and rain.
2.1 MEASUREMENT AND PAYMENT
Measurement will be made for each complete work item as specified herein, fully installed.
Payment will be made at the contract unit price for the Replacement of Exterior Siding and Replacement of Windows. Payment will be made under:
PAY ITEM DESCRIPTION PAY UNIT
08521 Furnish and install eight (8) vinyl, double -pane UV protected, outward opening split L.S.
pane windows pane, UV protected. Includes removal and disposal of old windows.
END OF SPECIFICATION 08521
SECTION 08800 - GLASS AND GLAZING
PART 1 - GENERAL
1.1 - Description This section specifies glass and glazing of window units.
1.2 - System Description:
Provide glass and glazing that has been produced, fabricated and installed to withstand normal thermal movement, wind loading and impact loading (where applicable), without failure including loss or breakage of glass, failure of sealants or gaskets to remain watertight and airtight, deterioration of glass and glazing materials and other defects in the work.
Normal thermal movement is defined as that resulting from an ambient temperature range of 120 deg. F (67 deg. C) and from a consequent temperature range within glass and glass framing members of 180 deg. F (100 deg. C).
Deterioration of insulating glass is defined as failure of hermetic seal due to other causes than breakage which results in intrusion of dirt or moisture, internal condensation or fogging, deterioration of protected internal glass coating, if any, resulting from seal failure, and any other visual evidence of seal failure or performance.
Deterioration of laminated glass is defined as the development of manufacturing defects including edge separation or delamination which materially obstructs vision through glass.
Deterioration of coated glass is defined as the development of manufacturing defects including peeling, cracking or other indications of deterioration in metallic coating due to normal conditions of use.
1.3 - Submittals:
Product Data: Submit manufacturer's technical data for each glazing material and fabricated glass product required, including installation and maintenance instructions.
Certificate: Submit certificates from respective manufacturers attesting that glass and glazing materials furnished for project comply with requirements.
Separate certification will not be required for glazing materials bearing manufacturer's permanent labels designating type and thickness of glass, provided labels represent a quality control program involving a recognized certification agency or independent testing laboratory acceptable to authorities having jurisdiction.
Compatibility and Adhesion Test Report: Submit statement from sealant manufacturer indicating that glass and glazing materials have been tested for compatibility and adhesion with glazing sealants and interpreting test results relative to material performance, including recommendations for primers and substrate preparation needed to obtain adhesion.
1.4 - Quality Assurance:
Glazing Standards: Comply with recommendations of Flat Glass Marketing Association (FGMA) "Glazing Manual" and "Sealant Manual" except where more stringent requirements are indicated. Refer to those publications for definitions of glass and glazing terms not otherwise defined in this section or other referenced standards.
Insulating Glass Certification Program: Provide insulating glass units permanently marked either on spacers or at least one component pane of units with appropriate certification label of inspecting and testing organization indicated below:
Insulating Glass Certification Council (IGCC).
Associated Laboratories, Inc. (ALI).
Single Source Responsibility for Glass: To ensure consistent quality of appearance and performance, provide materials produced by a single manufacturer or fabricator for each kind and condition of glass indicated and composed of primary glass obtained from a single source for each type and class required.
1.5 - Delivery, Storage, and Handling:
Protect glass and glazing materials during delivery, storage and handling to comply with manufacturer's directions and as required to prevent edge damage to glass, and damage to glass and glazing materials from effects of moisture including condensation, of temperature changes, of direct exposure to sun, and from other causes.
Where insulating glass units will be exposed to substantial altitude changes, avoid hermetic seal ruptures by complying with insulating glass fabricator's recommendations for venting and sealing.
1.6 - Warranty:
Manufacturer's Special Project Warranty on Insulating Glass: Provide written warranty signed by manufacturer of insulating glass agreeing to furnish f.o.b. point of manufacture, freight allowed project site, within specified warranty period indicated below, replacements for those insulating glass units developing manufacturing defects.
Manufacturing defects are defined as failure of hermetic seal of air space (beyond that due to glass breakage) as evidenced by intrusion of dirt or moisture, internal condensation or fogging, deterioration of protected internal glass coatings, if any, and other visual indications of seal failure or performance; provided the manufacturer's instructions for handling, installing, protecting and maintaining units have been complied with during the warranty period.
Warranty Period: Manufacturer's standard but not less than 10 years after date of substantial completion.
2.1 - Manufacturers:
Available Manufacturers: Subject to compliance with requirements, manufacturers offering products which may be incorporated in the work include; but are not limited to, the following:
Manufacturers: Subject to compliance with requirements, provide products of one of the following:
Manufacturers of Clear and Tinted Float Glass:
AFG Industries, Inc.
Ford Glass Division.
Guardian Industries Corp.
LOF Glass, Inc.
PPG Industries, Inc.
Saint-Gobain/Euroglass.
Manufacturers of Patterned Glass:
AFG Industries, Inc.
Guardian Industries Corp.
Hordis Brothers, Inc.
Saint-Gobain/Euroglass
Manufacturers of Heat-Treated Glass:
Cardinal IG.
Environmental Glass Products.
Falconer Glass Industries.
Ford Glass Division.
Guardian Industries Corp.
Hordis Brothers, Inc.
LOF Glass, Inc.
PPG Industries, Inc.
Saint-Gobain/Euroglass.
Spectrum Glass Prod. Div., H. H. Robertson Co.
Viracon, Inc.
Manufacturers of Coated Glass:
Advanced Coating Technology.
Cardinal IG.
Environmental Glass Products.
Falconer Glass Industries.
Ford Glass Division.
Guardian Industries Corp.
Hordis Brothers, Inc.
Independent Insulating Glass.
Interpane Coatings, Inc.
LOF Glass, Inc.
PPG Industries, Inc.
Saint-Gobain/Euroglass
Manufacturers of Insulating Glass:
Advanced Coating Technology.
Cardinal IG.
Environmental Glass Products.
Falconer Glass Industries.
Ford Glass Division.
Guardian Industries Corp.
Hordis Brothers, Inc.
Independent Insulating Glass.
PPG Industries, Inc.
2.2 - Glass Products, General:
Primary Glass Standard: Provide primary glass which complies with ASTM C 1036 requirements, including those indicated by reference to type, class, quality, and, if applicable, form, finish, mesh and pattern.
Heat-Treated Glass Standard: Provide heat-treated glass which complies with ASTM C 1048 requirements, including those indicated by reference to kind, condition, type, quality, class, and, if applicable, form, finish, and pattern.
Sizes: Fabricate glass to sizes required for glazing openings indicated, with edge clearances and tolerances complying with recommendations of glass manufacturer.
Provide thicknesses indicated or, if not otherwise indicated, as recommended by glass manufacturer for application indicated.
2.3 - Primary Glass Products:
Uncoated Clear Heat Treated Float Glass: Type I (transparent glass, flat), Class 1 (clear), Quality q3 (glazing select), 1/4" thick glass, and as follows:
Kind: Fully tempered and free of tong marks unless manufacturer recommends otherwise.
Coated Tinted Heat Treated Float Glass: Type I (transparent glass, flat), Class 2 (tinted heat absorbing and light reducing), Quality q3 (glazing select), 1/4" thick glass and as follows:
Bronze: Manufacturer's standard tint, with visible light transmittance of 50-52 percent and shading coefficient of 0.69- 0.71 for 1/4" thick glass.
Coating: Pyrolytic deposited; low emissivity, neutral colored, metallic coating on interior surface of glass.
Uncoated Clear Heat Treated Wired Glass: Type II (patterned and wired glass, flat), Class 1 (translucent), Quality q8 (glazing); complying with ANSI Z97.1; 1/4" thick; of form and mesh pattern indicated below:
Patterned Wire Glass: Form 2 (patterned and wired), Mesh m1 (diamond).
2.4 - Sealed Insulating Glass Units:
General: Provide preassembled units consisting of organically sealed panes of glass enclosing a hermetically sealed dehydrated air space and complying with ASTM E 774 for performance classification indicated as well as with other requirements specified for glass characteristics, air space, sealing system, sealant, spacer material, corner design and dessicant.
For properties of individual glass panes making up units, refer to product requirements specified elsewhere in this section applicable to types, classes, kinds and conditions of glass products indicated.
Provide heat-treated panes of kind and at locations indicated or, if not indicated, provide heat-strengthened panes where recommended by manufacturer for application indicated and tempered where indicated or where safety glass is designated or required.
Performance characteristics designated for coated insulating glass are nominal values based on manufacturer's published test data for units with 1/4" thick panes of glass and 1/2" thick air space.
U-values indicated are expressed in the amount of Btu's per hour per sq. ft. per degree F difference.
Performance Classification per ASTM E 774: Class A.
Thickness of Each Pane: 1/4".
Air Space Thickness: 1/2".
Sealing System: Manufacturer's standard.
Spacer Material: Manufacturer's standard.
Dessicant: Manufacturer's standard; either molecular sieve or silica gel or blend of both.
Corner Construction: Manufacturer's standard corner construction.
Low Emissivity-Coated Insulating Glass Units: Manufacturer's standard units with one pane of glass coated with a durable, neutral-colored, low-emissivity metallic coating, of type and on surface indicated, and complying with the following requirements.
Exterior Pane: Coated Tinted Heat Treated float glass, coated on second surface.
Interior Pane: Clear float glass, uncoated.
Kind FT (fully tempered).
Performance Characteristics: Visible light transmittance of 63 percent, summer daytime U-value of 0.34, winter nighttime U- value of 0.31, shading coefficient of 0.47 and outdoor reflectance of 11 percent.
2.5 - Elastomeric Glazing Sealants and Preformed Glazing Tapes:
General: Provide products of type indicated and complying with the following requirements:
Compatibility: Select glazing sealants and tapes of proven compatibility with other materials with which they will come into contact, including glass products, seals of insulating glass units, and glazing channel substrates, under conditions of installation and service, as demonstrated by testing and field experience.
Suitability: Comply with recommendations of sealant and glass manufacturers for selection of glazing sealants and tapes which have performance characteristics suitable for applications indicated and conditions at time of installation.
Elastomeric Sealant Standard: Provide manufacturer's standard chemically curing, elastomeric sealant of base polymer indicated which complies with ASTM C 920 requirements, including those for Type, Grade, Class and Uses.
Colors: Provide color of exposed sealants indicated or, if not otherwise indicated, as selected by COR from manufacturer's standard colors.
Preformed Butyl-Polyisobutylene Glazing Tape: Provide manufacturer's standard solvent-free butyl-polyisobutylene formulation with a solids content of 100 percent;
complying with AAMA A 804.1; in extruded tape form; non-staining and non-migrating in contact with nonporous surfaces; packaged on rolls with a release paper on one side;
with or without continuous spacer rod as recommended by manufacturers of tape and glass for application indicated.
Available Products: Subject to compliance with requirements, glazing sealants which may be incorporated in the work include, but are not limited to, the following:
Products: Subject to compliance with requirements, provide one of the following or an approved equal:
Preformed Butyl-Polyisobutylene Glazing Tape With Spacer Rod:
"Chem-Tape 60"; Bostik Construction Products Div.
"Shim-Seal"; Pecora Corp.
"PTI 303" Shim Tape; Protective Treatments, Inc.
"Pre-shimmed Tremco 440 Tape"; Tremco Inc.
2.6 - Glazing Gaskets:
Dense Elastomeric Compression Seal Gaskets: Molded or extruded gaskets of material indicated below, complying with ASTM C 864, of profile and hardness required to maintain watertight seal:
Neoprene.
EPDM.
Thermoplastic polyolefin rubber.
Any material indicated above.
Cellular Elastomeric Preformed Gaskets: Extruded or molded closed cell, integral-skinned neoprene of profile and hardness required to maintain watertight seal; complying with ASTM C 509, Type II; black.
Available Manufacturers: Subject to compliance with requirements, manufacturers offering products which may be incorporated in the work include, but are not limited to, the following:
Manufacturers: Subject to compliance with requirements, provide products of one of the following or an approved equal:
Manufacturers of Preformed Gaskets:
D. S. Brown Co.
Maloney Precision Products Co.
Tremco.
2.7 - Miscellaneous Glazing Materials:
Compatibility: Provide materials with proven record of compatibility with surfaces contacted in installation.
Cleaners, Primers and Sealers: Type recommended by sealant or gasket manufacturer.
Setting Blocks: Neoprene, EPDM or silicone blocks as required for compatibility with glazing sealants, 80 to 90 Shore A durometer hardness.
Spacers: Neoprene, EPDM or silicone blocks, or continuous extrusions, as required for compatibility with glazing sealant, of size, shape and hardness recommended by glass and sealant manufacturers for application indicated.
Edge Blocks: Neoprene, EPDM or silicone blocks as required for compatibility with glazing sealant, of size and hardness required to limit lateral movement (side-walking) of glass.
Compressible Filler Rods: Closed-cell or waterproof-jacketed rod stock of synthetic rubber or plastic foam, flexible and resilient, with 5-10 psi compression strength for 25 percent deflection.
3.1 - Examination:
Require Glazier to inspect work of glass framing erector for compliance with manufacturing and installation tolerances, including those for size, squareness, offsets at corners; for presence and functioning of weep system; for existence of minimum required face or edge clearances; and for effective sealing of joinery. Obtain Glazier's written report listing conditions detrimental to performance of glazing work. Do not allow glazing work to proceed until unsatisfactory conditions have been corrected.
3.2 - Preparation:
Clean glazing channels and other framing members to receive glass, immediately before glazing. Remove coatings which are not firmly bonded to substrates. Remove lacquer from metal surfaces where elastomeric sealants are indicated for use.
3.3 - Glazing:
Comply with combined printed recommendations of glass manufacturers, of manufacturers of sealants, gaskets and other glazing materials, except where more stringent requirements are indicated, including those of referenced glazing standards.
Protect glass from edge damage during handling and installation; use a rolling block in rotating glass units to prevent damage to glass corners. Do not impact glass with metal framing. Use suction cups to shift glass units within openings; do not raise or drift glass with a pry bar. Rotate glass with flares or bevels along one horizontal edge which would occur in vicinity of setting blocks so that these are located at top of opening. Remove from project and dispose of glass units with edge damage or other imperfections of kind that, when installed, weakens glass and impairs performance and appearance.
Apply primers to joint surfaces where required for adhesion of sealants, as determined by proconstruction sealant-substrate testing.
Install setting blocks of proper size in sill rabbet, located one quarter of glass width from each corner, but with edge nearest corner not closer than 6" from corner, unless otherwise required. Set blocks in thin course of sealant which is acceptable for heel bead use.
Provide spacers inside and out, of correct size and spacing to preserve required face clearances, for glass sizes larger than 50 united inches (length plus height), except where gaskets or glazing tapes with continuous spacer rods are used for glazing. Provide 1/8" minimum bite of spacers on glass and use thickness equal to sealant width, except with sealant tape use thickness slightly less than final compressed thickness of tape.
Provide edge blocking to comply with requirements of referenced glazing standard, except where otherwise required by glass unit manufacturer.
Set units of glass in each series with uniformity of pattern, draw, bow and similar characteristics.
Provide compressible filler rods or equivalent back-up material, as recommended by sealant and glass manufacturers, to prevent sealant from extruding into glass channel weep systems and from adhering to joints back surface as well as to control depth of sealant for optimum performance, unless otherwise indicated.
Force sealants into glazing channels to eliminate voids and to ensure complete "wetting" or bond of sealant to glass and channel surfaces.
Tool exposed surfaces of sealants to provide a substantial "wash" away from glass.
Install pressurized tapes and gaskets to protrude slightly out of channel, so as to eliminate dirt and moisture pockets.
Where wedge-shaped gaskets are driven into one side of channel to pressurize sealant or gasket on opposite side, provide adequate anchorage to ensure that gasket will not "walk" out when installation is subjected to movement.
Miter cut wedge-shaped gaskets at corners and install gaskets in manner recommended by gasket manufacturer to prevent pull away at corners; seal corner joints and butt joints with sealant recommended by gasket manufacturer.
3.4 - Protection and Cleaning:
Protect exterior glass from breakage immediately upon installation by use of crossed streamers attached to framing and held away from glass. Do not apply markers to surfaces of glass. Remove nonpermanent labels and clean surfaces.
Protect glass from contact with contaminating substances resulting from construction operations. If, despite such protection, contaminating substances do come into contact with glass, remove immediately by method recommended by glass manufacturer.
Examine glass surfaces adjacent to or below exterior concrete and other masonry surfaces at frequent intervals during construction, but not less often than once a month, for build-up of dirt, scum, alkali deposits or staining. When examination reveals presence of these forms of residue, remove by method recommended by glass manufacturer.
Remove and replace glass which is broken, chipped, cracked, abraded or damaged in other ways during construction period, including natural causes, accidents and vandalism.
Wash glass on both faces not more than 4 days prior to date scheduled for inspections intended to establish date of substantial completion in each area of project. Wash glass by method recommended by glass manufacturer.
4.1 Method of Measurement
4.2 Payment
END OF SECTION 08800
PAINTING 09900
PART 1 - GENERAL
1.1 - Scope This section covers furnishing all labor, materials and equipment necessary to apply specified paints. The term "paint" shall include linings, enamels, paints, sealers, catalysts, thinners, and other organic or inorganic paint products.
1.2 - Related Work Specified Elsewhere
08521 – Vinyl Windows and Doors
PART 2 - PRODUCTS
2.1 - Product Delivery, Storage and Handling Deliver material to the site in the original containers with labels intact and seals unbroken.
Storage location and method shall be approved by the Contracting Officer. Remove cloths and waste material which may constitute a fire hazard from the project site daily.
2.2 - Paint Schedule
Doors and Frames: One coat primer and two coats semi-gloss latex paint. Color shall be approved by COR.
2.3 - Submittals
Prepare 8" x 8" samples of top coat finish when requested by the CO. When possible apply finishes on identical materials to which they will be applied on project.
Identify each sample as to finish, formula, color name and number and sheen name and gloss units.
3.1 - Preparation of Surfaces Surfaces to be painted shall be free of dirt, dust, scale, or any other substance which may interfere with the adhesion of the specified coating.
3.2 - Application
Samples: Contractor shall submit samples as requested. Colored finishes shall not be applied until colors are approved by the COR.
Apply materials in strict accordance with manufacturer's recommendations.
Finished surfaces shall be free from runs, drops, ridges, waves, laps, brush marks and other blemishes. Welds shall receive special attention to assure their receiving a coating of the required thickness. Apply additional coatings when undercoats, primers and other conditions show through final coat of paint, until paint film is of uniform finish, color and appearance. Special care shall be taken not to injure or spatter adjacent work. Should adjacent work be injured or spattered, it shall be cleaned and the original finish restored.
Furnish and lay dropcloths in all areas where painting is being done over concrete slabs.
Caulk interior and exterior joint between block and steel frames for doors. Smooth all caulk joints into a concave surface with finger etc.
Cloth, cotton wastes, or other materials which constitute a fire hazard shall be placed in closed metal containers or be destroyed at the end of each day's work.
Environmental Conditions: Surfaces shall be painted only when they are free from moisture. No painting on exterior surfaces shall be done with less than 72 hours of actual drying weather after a rain, nor during periods of dew or fog. Receiving surfaces shall be properly dried out before proceeding with the work. No painting shall be done when temperature is below 45 degrees F., except when specifically directed otherwise in writing by the Contracting Officer.
END OF SPECIFICATION 09900