(x)

127EAX21R0038

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

SPRINGERVILLE AZ 85938

30 S CHIRICAHUA DR

PO BOX 640

APACHE SITGREAVES NATIONAL FOREST

USDA FOREST SERVICE

ALBUQUERQUE NM 87102

333 BROADWAY SE

SOUTHWESTERN REGION

10376589/2/2021

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/07/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment I: This solicitation is being amended to:

1. Provide RFI responses (see page 3)

2. Provide a site map (see page 4)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

ALL OTHER TERMS AND CONDITIONS OF THIS SOLICITATION REMAIN THE SAME

Delivery Location

PSW FOREST FIRE LABORATORY - RIVER

Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

127EAX21R0038

4955 CANYON CREST DRIVE

RIVERSIDE CA 92507 US

FOB: Destination

PSW Riverside Photovoltaic Solar System Design;

POC: Sylvia Qi sylvia.qi@usda.gov; Per FAR 4.201

(c) email a copy of the award to

SM.FS.PSW_procure@usda.gov

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

RFI Responses

• Are asbuilt drawings for the facility available? I'm interested in the structural and electrical for the building and civils for the site. For the size you are looking at we may need to design rooftop AND carports.

o The Agency has the original structural & electrical asbuilt prints which will be provided after award.

• Is it possible to get a site map location indicating where are the electric meters that will distribute power to the buildings. Your electric bill will indicate the quantity and meter numbers.

There is a large open field it looks like adjacent to green houses and a parking lot. Is the open field available for ground mount solar panels? Ground mount is the most cost effective method of solar power generation. The roofs will not be able to fully accommodate the power requirements for 425,000 kWh. Its either carports/canopies or ground mount. Carports and canopies are the most expensive of solar power generation.

o I’ve attached a site map and marked where the two meters are located. I’ve crossed out Mod B and greenhouses as they have been removed. The most conducive area for panels in the Back field is where the greenhouses had been located. The contractor would need to verify how much of the rest of the field could be used as there is an electrical sub panel vent pipes and posts where an experiment is going on. (map attached separately)

• Will the government require any type of bonding for this contract (bid bond, payment bond, performance bond)?

o If the award is 35k or more the following applies:

The Contractor shall submit one of the following payment protections:

• Irrevocable Letter of Credit

• Payment and Performance Bonds

• Escrow account equal to contract total

• We would like to know if the solar plans need to have the engineering stamp because we would like to submit multiple designs.

o The Final Construction plans (end product of contract) have to be engineer stamped, but that is not required for the initial proposals. As part of the contract, PSW will be working with the contractor to finalize the design that will be engineer stamped

• Regarding Factor C - Past Performances, are consultants allowed to submit overseas projects as reference projects/clients?

o Past Performances – Overseas projects can be submitted, the client must be accessible and verifiable.