Addendum IV-Prescott Basin Road Maintenance.pdf

PDF 613 KB Posted

Attached to
Prescott Basin Road Maintenance Federal contract opportunity
Solicitation number
127EAX21Q0014
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.01 ADDENDUM

The Prescott National Forest is seeking bids from qualified contractors to perform road maintenance and/or construction of the following Roads: FSR-261, 70, 81, 82 & 52. This will consist of repairing soil erosion damaged roads and eliminating surface protruding rocks. Drainage control of surface water with proper drain features. This will include:

cleaning bar ditches, lead-outs and rolling dips. Install new bar ditches, lead-outs and rolling dips where needed. Clearing brush, clean out two cattle guards of debris and clean out any culverts if any. Contractor and COR will determine best locations for installing new bar ditches, lead-outs and rolling dips.

This project consists of but not limited to, providing all materials, equipment, labor, supervision and any assistance necessary for the construction and maintenance services at the following site locations:

Prescott National Forest Service Roads:

FSR-261 (Approx. 0.7 Mi. - See Location Map) FSR-81 (Approx. 0.45 Mi. - See Location Map) FSR-70 (Approx. 0.6 Mi. - See Location Map) FSR-82 (Approx. 0.75 Mi. - See Location Map) FSR-52 (Approx. 3.8 Mi. - See Location Map)

Phase One - FSR-52 (Approx. 3.8 Mi.) Involves Heavy road maintenance and repair.

Heavy UTV & 4x4 traffic along with drainage issues have caused soil erosion and damage to the road. This has caused ruts and potholes throughout the road and have exposed protruding rocks that require to be eliminated from the road surface. The road bar diches are completely filled and require cleaning. There are two culverts (contractor to field verify) and two cattle guards that require cleaning as well. You will need to install new lead-outs and rolling dips. Contractor and COR will determine best locations for installing new lead-outs and rolling dips.

Phase Two - FSR-261 (Approx. 0.7 Mi.) Involves Heavy road maintenance and repair.

Requires road to be a minimum of 12’ in width (where needed), clear brush, repairing soil erosion road damage, eliminate surface protruding rocks, install bar ditches, clean one cattleguard, install new lead-outs and rolling dips. Contractor and COR will determine best locations for installing new bar ditches, lead-outs and rolling dips. (See Location Map)

Phase Three - FSR-82 (Approx. 0.75 Mi.) Involves Heavy road maintenance and repair.

Requires the road to be a 12’ minimum width, clear brush and install new bar ditches, lead-outs and rolling dips. Contractor and COR will determine best locations for installing new bar ditches, lead-outs and rolling dips.

Phase Four - FSR-81 (Approx. 0.45 Mi.) Requires repairing soil erosion road damage, road with to be 12’ minimum width, install new bar ditches, clear brush and install new lead-outs and rolling dips. Contractor and COR will determine best locations for installing new lead-outs and rolling dips.

Phase Five - FSR-70 (Approx. 0.6 Mi.) requires the construction of a new road with a 12’ minimum width, clear brush and install new lead-outs and rolling dips. Contractor and COR will determine best locations for installing new lead-outs and rolling dips.

It is the intention of the Government to award all Phases at the same time; however, if the entire bid exceeds available funding, then the Government, at its discretion, may award only phase one or award phases one and two, awarding phases three thru five at a later time. It is advantageous to the Contractor to offer a discount if phase one thru five are awarded and performed at the same time.

SCHEDULE OF ITEMS – Base Items

Base Item No. Item Description Est.

Qty

Method of Measuremen t

Unit Price

Cost-Total

Phase One - FSR-52 Bid Items:

B1.1 Mobilization 1 LSQ LS $

B1.2

Heavy Road Maintenance – Reshape and Repair soil erosion road damage, eliminate surface protruding rocks. Install Drain features to control surface water.

This will include: cleaning existing bar ditches and installing new lead-outs and rolling dips where needed.

3.8 MILE LS $

B1.3 Culvert cleanout 2 EA LS $

B1.4 Cattleguard cleanout 2 EA LS $

Phase 1 Bid Price $

Option Phase Two - FSR-261 Bid Items:

O2.1 Mobilization 1 LSQ LS $

O2.2 Heavy Road Maintenance – Road to be a minimum of 0.7 MILE LS $

12’ in width where needed.

Reshape and Repair soil erosion road damage, eliminate surface protruding rocks. Install Drain features to control surface water.

This will include: install new bar ditches and installing new lead-outs and rolling dips where needed.

O2.3 Cattleguard cleaning 1 EA LS $ O2.4 Roadside brushing 16 HR LS $

Phase 2 Bid Price $

Qty

Method of Measuremen t

Unit Price

Cost-Total

Option Phase Three - FSR-82 Bid Items:

O3.2

Road Construction – Road to be a minimum of 12’ in width. Eliminate surface protruding rocks. Install Drain features to control surface water. This will include: installing new bar ditches, lead-outs and rolling dips where needed.

0.75 MILE LS $

O3.3 Roadside brushing 16 HR LS $

Phase 3 Bid Price $

Base Item No. Item Description Est.

Qty Method of

Measurement Unit Price

Cost-Total

Option Phase Four - FSR-81 Bid Items:

O4.2

Road Construction – Road to be a minimum of 12’ in width. Eliminate surface protruding rocks. Install Drain features to control surface water. This will

0.45 MILE LS $

include: installing new bar ditches, lead-outs and rolling dips where needed.

O4.3 Roadside brushing 10 HR LS $

Phase 4 Bid Price $

Qty

Method of Measurement

Unit Price

Cost-Total

Option Phase Five - FSR-70 Bid Items:

O5.2

Road Construction – Road to be a minimum of 12’ in width. Eliminate surface protruding rocks. Install Drain features to control surface water. This will include:

installing new lead-outs and rolling dips where needed.

0.6 MILE LS $

O5.3 Roadside brushing 16 HR LS $

Phase 5 Bid Price $

* LS = Lump Sum, LSQ = Lump Sum Quantity Total Bid: $

PROJECT LOCATIONS – Base Map for FSR-52 & 82

Project Location for Base Map for FSR-261

Project Location for Base Map for FSR-70 & 81

1.01 ADDENDUM
SCHEDULE OF ITEMS – Base Items
PROJECT LOCATIONS – Base Map for FSR-52 & 82