This document is a Schedule of Items for a federal construction contract opportunity. The contract involves renovation and HVAC upgrades to several barracks and residential buildings in the Modoc National Forest in California, with a total estimated value between $500,000 and $1,000,000.

The Schedule of Items lists the specific work to be performed at each location, including removing and replacing flooring, cabinets, windows, roofing, and HVAC systems. Payment items are detailed with estimated quantities and unit prices. The contract has a base requirement and one option. The solicitation is a total small business set-aside, with a site visit scheduled for April 2, 2024 and a deadline for requests for information by April 10, 2024. One award will be made from this solicitation, and contractors must submit pricing for all items.

View the file

Other files

File Type Posted
RFI Official Responses - 1 - UPDATED.pdf PDF
1. Statement of Work - Revision 001.pdf PDF
RFI Official Responses - 2.pdf PDF
A00002 - RFI Resonses SOW Schedule.pdf PDF
RFI Official Responses - 1.pdf PDF
A00001 - RFI Responses.pdf PDF
7.1 Barracks Photos.zip ZIP file
4. Modoc Barracks Locations.pdf PDF
7.2 Barracks Photos.zip ZIP file
5. Modoc Barracks Map.pdf PDF
3. Supplemental Specifications.pdf PDF
127EAW24R0009 - Modoc Forest Barrack Maintenance.pdf PDF
9. RFI Form.docx DOCX document
8. Davis-Bacon Act WD # CA20240007.pdf PDF
1. Statement of Work.pdf PDF
6. Asbestos Reports.zip ZIP file
7. Barracks Photos.zip ZIP file
2. Schedule .docx DOCX document
7.3 Barracks Photos.zip ZIP file
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)

Pay Item No. Description Est.

Qty.

Pay Unit

Unit Price Total Price

017320 Mobilization 1 LS

South Fork Compound - Alturas, CA

South Fork East Barracks - 1002 Est. 977 Sq.Ft.

Year Constructed: 1937

096516-1 Remove and replace flooring with commercial grade laminated vinyl plank flooring

950 SF

102800-1 Renovate bathroom (includes replacing all fixtures, shower/tub, toilet, flooring, paint, 3 foot vanity with 1 sink)

1 LS

238126-1 Remove old electric heater and oil monitor and install HVAC Mini-split (3 zone)

Canby Workcenter - Canby, CA Canby Middle Residence - 1009

Est. 1272 Sq. Ft.

Year Constructed: 1935

074113-1 Replace roof with Delta Rib style metal roofing

1700 SF

085313-1 Replace all windows (for already replaced windows, finish with interior & exterior trim to match other windows)

10 EA

096516-2 Remove and replace flooring with

1250 SF

102800-2 Renovate bathroom (shower and 32 inch vanity with sink only)

123530-1 Remove and replace all kitchen cabinets and countertops (includes 10 linear feet of cabinets and 1 sink)

238126-2 Remove old electric wall heaters and baseboard heaters and install HVAC Mini-split (4 zone)

238199-1 Remove ,brick hearth and piping (full system and any needed repairs to flooring, roofing or walls as a result of removal, cover walls & seal chimney)

Canby North Barracks - 1012

Est. 1285 Sq. Ft.

Year Constructed: 1959

074113-2 Replace roof with Delta Rib style

085313-2 Replace all windows 12 EA

096516-3 Remove and replace flooring in kitchen and bathroom with commercial-grade laminate vinyl

250 SF

102800-3 Renovate bathroom (includes toilet, flooring, paint 2 linear feet of cabinets and 1 sink)

123530-2 Remove and replace all kitchen

39 linear feet of cabinets - 14 of which are overhead and 1 sink)

238126-3 Remove old propane heater and window AC unit and install HVAC Mini-split (4 zone)

238199-2 Remove wood stove and piping to flooring, roofing or walls as a result of removal, cover fireplace &

Canby South Barracks - 1013

Est. 1285 Sq. Ft.

074113-3 Replace roof with Delta Rib style

085313-3 Replace all windows 12 EA

096516-4 Remove and replace flooring in kitchen and bathroom with commercial-grade laminate vinyl

102800-4 Renovate bathroom (includes toilet, flooring, paint, 2 linear feet of cabinets and 1 sink)

123530-3 Remove and replace all kitchen

39 linear feet of cabinets - 14 of which are overhead and 1 sink)

238126-4 Remove old propane heater and window AC unit and install HVAC Mini-split (4 zone)

238199-3 Remove wood stove and piping to flooring, roofing or walls as a result of removal, cover fireplace &

Crowder Flat Guard Station

Crowder Flat Barracks - 1313 Est. 2336 Sq. Ft.

Year Constructed: 1991

096516-5 Remove and replace all flooring with commercial-grade laminate vinyl plank flooring

2300 SF

099123-1 Repaint interior 1 LS

113013-1 Remove and replace propane refrigerators (4)

4 EA

238126-5 Remove old propane heater and install HVAC Mini-split (6 zone), existing furnace and ducting shall remain as backup

265119-1 Remove and replace all lighting fixtures (15) with LED fixtures

15 EA

Cedarville Ranger Station - Cedarville, CA

Cedarville East Barracks - 1006 Est. 1286 Sq. Ft.

Year Constructed: 1938

085313-4 Replace all windows 11 EA

096516-6 Remove and replace flooring with

102800-5 Renovate bathroom (includes toilet, flooring, paint 32-inch vanity with sink)

123530-4 Remove and replace all kitchen

14 linear feet, 4 of which are overhead and 1 sink)

238126-6 Remove old electric wall heaters and baseboard heaters and install HVAC Mini-split (4 zone)

238199-4 Remove and replace freestanding wood stove (including all interior and exterior piping)

Buck Creek Guard Station - Davis, CA

Buck Creek East House - 1016 Est. 1596 Sq. Ft.

Year Constructed: 1961

074646-1 Remove and replace all siding (includes appropriate mitigation for current asbestos siding) with Hardie Board type siding

096516-7 Remove and replace flooring in kitchen, bathrooms (2) and washroom with commercial-grade laminate vinyl plank flooring

1550 SF

099123-2 Repaint interior 1 LS

102800-6 Renovate full bathroom (includes toilet, flooring, paint, 32-inch vanity with 1 sink)

238126-7 Remove old oil monitor heater and install HVAC Mini-split (4 zone)

238199-5 Complete minor repairs to wood stove insert (replacement of baffle boards, replacement of broken brick)

Buck Creek West House - 1017

Est. 1453 Sq. Ft.

Year Constructed: 1961

074646-2 Remove and replace all siding

(includes appropriate mitigation for current asbestos siding) with

096516-8 Remove and replace flooring in bathrooms (2) and washroom (includes appropriate mitigation for current asbestos flooring) with commercial-grade laminate vinyl

200 SF

099123-3 Repaint interior 1 LS

102800-7 Renovate full bathroom (includes toilet, flooring, paint, 32-inch vanity with 1 sink)

238126-8 Remove old propane heater and

238199-6 Remove and replace wood stove insert and install new chimney liner in existing chimney

Adin Annex - Adin, CA

Adin Annex North Barracks - 1449 Est. 1826 Sq. Ft.

Year Constructed: 1958

074113-4 Replace roof with Delta Rib style metal roofing

2400 SF REMOVED REMOVED

074646-3 Remove and replace all siding with

085313-5 Replace all windows 14 EA

096516-9 Remove and replace all flooring

1800 SF

102800-8 Renovate both bathrooms (includes replacing all fixtures, shower/tub, toilet, flooring, paint, includes 4 sinks and 12 linear feet of cabinets)

2 LS

123530-5 Remove and replace all kitchen 1 LS

2 sinks and 33 linear feet of cabinets)

238126-9 Remove old oil monitor heater and swamp coolers and install HVAC Mini-split (5 zone)

Tulelake Compound - Tulelake, CA

Tulelake North Barracks - 1343 Est. 1404 Sq. Ft.

Year Constructed: 1965

074113-5 Replace roof with Delta Rib style

1800 SF

096516-10 Remove and replace all flooring

1400 SF

099123-4 Repaint interior 1 LS

102800-9 Renovate both bathrooms (includes replacing all fixtures, shower/tub, flooring, paint, 2-foot vanities with 1 sink each)

238126-10 Remove old oil monitor heater and install HVAC Mini-split (5 zone)

Tulelake South Barracks - 1014

Est. 1300 Sq. Ft.

074113-6 Replace roof with Delta Rib style

074646-4 Remove and replace all siding for current asbestos siding) with

102800-10 Renovate bathroom (includes toilet, flooring, paint, 2-foot vanity

238126-11 Remove old propane furnace and

238199-7 Remove wood stove and piping to flooring, roofing or walls as a result of removal, cover fireplace &

Tulelake South Residence - 1015

Est. 1300 Sq. Ft.

074113-7 Replace roof with Delta Rib style

074646-5 Remove and replace all siding for current asbestos siding) with

102800-11 Renovate bathroom (includes replacing all fixtures, shower/tub, toilet, flooring, paint, 2-foot vanity

238126-12 Remove old oil monitor heater and

238199-8 Remove wood stove and piping to flooring, roofing or walls as a result of removal, cover fireplace &

BASE TOTAL:

B.1 SCHEDULE OF ITEMS – OPTION 1

South Fork Compound - Alturas, CA

South Fork West Barracks - 1019 Est. 1072 Sq.Ft.

Year Constructed: 1961

238126-13 Install HVAC Mini-split (3 zone) 1 LS

Long Bell Guard Station

Long Bell Modular Barracks - 1314 Est. 2338 Sq. Ft.

Year Constructed: 1991 096516-8 Remove and replace all flooring with commercial-grade laminate vinyl plank flooring

113013-2 Remove and replace propane refrigerators (4)

4 EA

238126-14 Remove old propane furnace and install solar-compatible HVAC Mini-split (6 zone), existing furnace and ducting shall remain as backup

265119-2 Remove and replace all lighting fixtures with LED fixtures (4-ft fluorescent tubes)

Adin Annex - Adin, CA

Adin Annex South House - 1008 Est. 1001 Sq. Ft.

Year Constructed: 1954

238126-15 Remove old propane heater and install HVAC Mini-split (3 zone), existing furnace and ducting shall remain as backup

Dry Lake Guard Station - Dry Lake, CA

Dry Lake Barracks - 1479 Est. 1728 Sq. Ft.

Year Constructed: 1938

085313-6 Replace all windows 11 EA

096516-11 Remove and replace all flooring with commercial-grade laminate vinyl plank flooring

099123-5 Paint interior 1 LS

102800-12 Renovate two bathrooms (includes toilet, flooring, paint, approx. 6 foot vanities with sink)

OPTION 1 TOTAL:

BASE + OPTION 1 + TOTAL:

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF

THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* One award will be made from this solicitation, contractors must submit pricing for all items.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Company Name: POC & Title:

Email: Phone Number:

UEI Number: Tax ID:

File details come from the government source that posted it. Updated .