About this file
This document is a Statement of Work (SOW) for the Forestwide Barracks Maintenance project on the Modoc National Forest in California. The purpose of this project is to renovate all barracks on the forest, including work on the roofing, siding, windows, flooring, interiors, bathrooms, HVAC systems, wood stoves, lighting, and HAZMAT mitigation. Detailed specifications are provided for each work item. The project is set aside for small businesses, with an estimated value between $500,000 and $1,000,000. An organized site visit is scheduled for April 2, 2024, and all work must be completed by May 1, 2025. Contractors are required to submit full product specifications and details for approval prior to installation. This SOW is associated with Solicitation Number 127EAW24R0009, issued by the USDA Forest Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Official Responses - 1 - UPDATED.pdf | ||
| RFI Official Responses - 2.pdf | ||
| 2. Schedule - Revision 001.pdf | ||
| A00002 - RFI Resonses SOW Schedule.pdf | ||
| RFI Official Responses - 1.pdf | ||
| A00001 - RFI Responses.pdf | ||
| 7.1 Barracks Photos.zip | ZIP file | |
| 4. Modoc Barracks Locations.pdf | ||
| 7.2 Barracks Photos.zip | ZIP file | |
| 5. Modoc Barracks Map.pdf | ||
| 3. Supplemental Specifications.pdf | ||
| 127EAW24R0009 - Modoc Forest Barrack Maintenance.pdf | ||
| 9. RFI Form.docx | DOCX document | |
| 8. Davis-Bacon Act WD # CA20240007.pdf | ||
| 1. Statement of Work.pdf | ||
| 6. Asbestos Reports.zip | ZIP file | |
| 7. Barracks Photos.zip | ZIP file | |
| 2. Schedule .docx | DOCX document | |
| 7.3 Barracks Photos.zip | ZIP file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORESTWIDE BARRACKS MAINTENANCE
Modoc National Forest
Modoc, Lassen & Siskiyou Counties
STATEMENT OF WORK
The purpose of this project is to renovate all barracks located on the Modoc National Forest due to being outdated. This includes but is not limited to roofing, exterior siding, windows, flooring, interior painting, bathroom renovation, propane refrigerators, cabinets, countertops, HVAC, wood stoves, LED lighting, HAZMAT mitigation.
Furnish all labor, materials, equipment, and other incidentals necessary to complete the following work items as listed in the Schedule of Items:
• Roofing (074113) - Remove and replace all roofing on specified buildings with screwless or hidden fastener high-rib style metal roofing. Complete any structural repairs necessary before installation of new roofing. Installation of roofing shall provide a complete and usable roofing system including but not limited to all surfacing materials, associated venting, penetration sealing, and replacement in-kind of any existing gutters as well as appropriate downspouts and gutter installation over all entrances and walkways regardless of existing gutters. Installation will comply with contract specifications and manufacturer’s installation instructions. All installations must comply with Modoc County Building Codes. Contractor will dispose of all waste, including removed roofing and decking materials. Up to 15% of the roof structural assembly, including sheathing, rafters, fascia, soffit, vent assemblies, and other roof components, if damaged, will be replaced or repaired per the CO with no modification to this contract. Additional needs will be addressed via negotiation and contract modification.
• Siding (074646) - Remove and replace all siding and trim on specified buildings. Complete any needed repairs or replacement of insulation. Paint siding and trim to match other buildings on complex or other colors as approved. All infrastructure mounted or affecting the siding work needs to be removed. Materials must be assessed for suitability, and may be reinstalled if adequate, otherwise unsuitable materials must be replaced. All louvers and access panels should be replaced. For Adin Annex North Barracks only, the egress stairs apparatus shall be temporarily supported, then detached and separated from the building to allow proper room for siding replacement. Once the new siding is installed, re-install the stairs, adjusting the footings and anchors if needed, then attach to the wall using new lag bolts at an appropriate length considering the new siding thickness.
• Windows – Remove and replace all windows in specified buildings. Each window shall be replaced with a similar style window (i.e. fixed, single-hung, double-hung, sliding, etc.)
Replacement windows shall be high-quality vinyl, double-pane, Energy Star rated windows, PlyGem West Pro Vinyl Series 200 or equivalent. For windows that have already been replaced (Canby Middle Residence 1009 only), finish with interior and exterior trim to match other new window work.
• Flooring (096516) - Remove and replace all flooring in specified buildings with commercial grade vinyl plank flooring. Complete any structural repairs necessary before installation of new flooring. Approximately 20% of the wood joist or plywood in each building is estimated to need replacement and up to 20% of the total contract amount shall be replaced as a part of this work item without modifications or change orders. Any openings or holes that would allow for the entry of pests, primarily focusing on rodents, should be repaired to prevent entry. No chemical treatment of pests is expected.
• Interior Painting – Paint all interior walls and ceilings in specified buildings with satin finish, Swiss coffee colored paint, Sherwin Williams SuperPaint Interior Latex Satin or equivalent.
One prime and prep coat and one finish coat are required.
• Bathroom Renovation – Gut (remove tub, shower, toilet, vanity, mirror, cabinets, flooring, towel bars, fixtures, etc.) bathroom and renovate in specified buildings, replacing all items and fixtures in kind (unless otherwise noted) with modern, high-quality, products.
o All tubs/showers shall be replaced with standing showers with high-quality mounted curtain bars, Aquatic 13632P or equivalent. Tub/shower fixtures shall be Delta Classic Bath Collection (T13020, T13120, T13220) or equivalent. All fixtures shall be low flow.
o Vanities shall be free standing Master Brand Mantra or equivalent.
o All mirrors and lights shall be replaced with simple 2’ x 3’ mirrors and simple 3-bulb vanity lights.
o Faucets shall be single-handle commercial grade faucets. Peerless P188620LF-BN or equivalent.
o Toilets shall be Grover Western Pottery B872WH/T8HPWH or equivalent.
• Propane Refrigerators – Remove and replace propane refrigerators with new, high-quality, similarly sized (~20 cubic feet), over and under propane fridges, Unique Appliances Off-Grid
34.6 in. 19 Cu. Ft. Propane Top Freezer Refrigerator (Model # UGP-19C SM W) or equivalent.
• Cabinets & Countertops – Remove and replace all cabinets and countertops (including sinks/accessories) with modern, high quality cabinets/countertops matching current layout and design. Counters shall be Corian Solid Surface or equivalent. Cabinets shall be Master
Brand Mantra or equivalent.
• HVAC Installation – Remove old heaters/stoves as specified in the Schedule of Items and replace with a HVAC mini-split with multizone air handler in each room. Mini-splits shall be wall-mounted with programable thermostats mounted on the wall. A 4-ton multizone inverter heat pump system mini-split that is a Mitsubishi MXZ-SM48NAMHZ or equivalent shall be installed in four to five bedroom facilities. A 2.5-ton multizone inverter heat pump system mini-split that is a Mitsubishi MXZ-3C30NAHZ4 or equivalent shall be installed in two to three bedroom facilities. It should be assumed that electrical panels are not sufficient for amperage to support the new HVACs and a licensed electrician will be needed to complete the work. Repair any damage to floors/walls/paint/etc. left from the removal of old heating sources. Install ¼ round or a base shoe to be attached to the existing base to trim the floor edge where new baseboards are needed due to removal of baseboard heaters or other old heating sources. Where specified in Schedule of Items, (Buildings 1012, 1013, 1014, 1015, 1016, 1017), seal cap, patch and paint to match all existing supply and return vents.
• Wood Stoves – Remove old heating apparatuses and wood stoves as noted in Schedule of
Items and replace wood stove (including chimney and all components unless otherwise noted in Schedule of Items) with new, high-quality wood stove (free standing or insert as noted in
Schedule of Items). Free standing stoves shall be replaced with Blaze King Sirocco 20.2 or equivalent. Inserts shall be replaced with Blaze King Princess 29 insert or equivalent. All piping shall be replaced with minimum double-wall, Simpson or Dura-Vent or equivalent.
Repair any damage to floors/walls/paint/etc. left from the removal of old heating sources.
Where specified in Schedule of Items cover interior fireplace hole with finish grade plywood and varnish and seal chimney with foam or insulation and cap with sheet metal. Where specified in Schedule of Items (Canby Middle Residence 1009) remove brick hearth and cover wall with finish grade plywood with varnish (no match to walls required). Remove pipe and seal chimney with foam or insulation and cap with sheet metal cap.
• LED Lighting – Replace all light fixtures in specified buildings (including exterior lighting on building) with high-quality LED light fixtures, SATCO Nuvo S39906 or equivalent.
• HAZMAT Mitigation – Properly remove and dispose of any asbestos containing materials
(noted in Schedule of Items).
Note that removal of any items listed for removal includes appropriate disposal off-forest.
SUBMITTALS
Full submittals including product specifications and details shall be required by the successful bidder for the following. Brands, materials, colors, designs, sizes, and other details as applicable must be approved by a Forest Service representative prior to purchase and installation:
• Roofing systems
• Siding
• Flooring
• HVAC systems
• Windows
• Toilets
• Showers and shower fixtures
• Curtain/towel bars
• Sinks/faucets/vanities/mirrors
• Cabinets/countertops
• Paint
• Lighting fixtures
• Wood stoves
• Propane Refrigerators
PROPOSALS
Contractor’s quotes shall provide for the purchase and installation of the items and types specified in the Schedule of Items and Specifications. Contractors may also provide quotes and technical plans for optional alternative systems or items but must demonstrate cost savings or superior performance of the alternative options. The contractor’s technical proposal should clearly identify the use of either a metal roofing system structurally rated for the existing purlin span, or the addition of sheathing to support the type of metal roofing specified in this contract, which requires a continuous, rigid substrate. If proposing an alternative structural metal system, provide manufacturer’s specifications.
SITE VISITS
An organized site visit has been scheduled for-
Date / Time: Tuesday, April 2nd, 2024 @ 0830
Participants will meet at-
Address / bldg. #: Canby Work Center, 22529 Hwy 299. Canby, CA 96015 (next to the Canby Post Office). We will visit a representative facility in Canby and then another in Adin, CA.
FS personnel leading Site Visit Contact Info
Title: Forest Engineer/COR
Name: Chris Bielecki
Phone #: 530-801-1637
All bidders are strongly urged to conduct site visits prior to entering bids in order to best assess the nature and condition of the existing buildings. The building exteriors are accessible without prior approval. A tour of several representative facilities will be held on April 2nd, 2024 at 0830 AM PST at which time the interior of the buildings in concern will be open for viewing. Please contact Forest
Engineer, Christopher Bielecki at (530) 233-8850 christopher.s.bielecki@usda.gov for further questions or to schedule site visits you would like to conduct to barracks not shown on the tour.
SCHEDULE
354 Calander days: June 3rd, 2024 through May 25th, 2025
All work shall be completed by May 1, 2025. Barracks are generally occupied between May and
October. Unless circumstances allow, only one barracks will be made available for work at a time and all work must be completed within an agreed upon time frame to allow for occupants to return. All buildings shall be entirely functional while occupied. Bidders shall submit a proposed schedule along with their bid so that the US Forest Service can manage tenants accordingly. Due to weather conditions, more remote barracks will not be available during the winter. USFS staff will work with the contractor to maximize flexibility and both allow for the needed amount of time at each barracks and meet the existing constraints.
USFS does not have a preferred order or windows of time for each barracks beyond stated requirements, and proposed schedules may be developed based on what works best for the given site locations and work items. USFS suggests that work on Crowder Flat and Long Bell is scheduled safely during summer months, as these remote sites are shut down and often inaccessible during the winter.
Buck Creek work will likely be more convenient in summer months as well as the site is higher elevation and likely to have significant snow present during winter which may make work and staging difficult.
mailto:christopher.s.bielecki@usda.gov
PERSONNEL QUALIFICATIONS
All work shall be performed by a contractor, or subcontractor, qualified in the appropriate field(s) for the work being performed.
PROJECT LOCATION
A map of complex locations has been provided in the contracting documents and sites are generally locatable through online mapping applications. Approximate GPS coordinates of each complex along with aerial images inticating building locations within each compound have also been provided in the Building Locations document. Some sites require travel on National Forest roads which can be infeasible in the winter depending on conditions. Some NF routes may also be in use for log haul and as such, logging truck traffic should be anticipated. For further information, or directions, contact Forest Engineer, Christopher Bielecki at (530) 233-8850 christopher.s.bielecki@usda.gov.
OTHER INFORMATION
Contractor will be responsible for moving furniture and equipment from each barracks prior to work in order to maximize schedule flexibility. An alternative covered storage will be provided by USFS at each site.
Power and water will be available on site for contractor use. During the time which a building has been scheduled for work, contractor may use the bathroom(s) in that building as work allows.
Adin Annex South House (where the only listed work item is HVAC) can be seen as a representative facility of expected end results at each building in this contract.