This document contains a schedule of items for a federal construction contract to install a bridge on the Mount Hough Ranger District of the Plumas National Forest. The contract requires mobilization, surveying, erosion control, clearing and grubbing, removal of an existing culvert, excavation and backfill, roadway obliteration, riprap, geotextile, aggregate base and surface courses, asphalt paving, structural concrete, precast concrete slabs, reinforcing steel, bridge railing, bearings, sheet drains, approach rails, backfill, terminal sections, rail connections, object markers, and temporary traffic control. Optional items include additional aggregate surface course and road reconditioning. Bids are due by April 14, 2021. The contract is set aside for small businesses and has an estimated value between $500,000 and $1,000,000. The Department of Agriculture Forest Service Pacific Southwest Region is the contracting agency.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B – SCHEDULE OF ITEMS
(FR 28N30 MP 1.09 BRIDGE INSTALLATION PROJECT)
MOUNT HOUGH RANGER DISTRICT
PLUMAS NATIONAL FOREST
B- 1 - SCHEDULE OF ITEMS (BASE CONSTRUCTION)
ITEM NO.
DESCRIPTION
PAY UNIT
EST.
QTY.
UNIT PRICE
TOTAL PRICE
15101
| Mobilization |
| Lump Sum |
| ALL |
| $________ |
| $____________ |
| Bonding |
| Lump Sum |
| ALL |
| $________ |
| $____________ |
15201 Construction Survey and Staking, Method I, Tolerance A
Lump Sum
ALL
15713
Soil Erosion and Pollution Control
Lump Sum
ALL
20101
Clearing and Grubbing
Lump Sum
ALL
20305
Removal of Existing Culvert, including concrete foundations; disposal at commercial landfill
Lump Sum
ALL
20401
Roadway Excavation, Compaction Placement Method 2, Tolerance Class A
Cubic Yard
20429
Waste Material Disposal
Lump Sum
ALL
20801
Structural Excavation
Cubic Yard 1,096
20803
Structural Backfill
Cubic Yard
21101
Roadway Obliteration, Method 2
Foot
25101
Placed Riprap, Class 5
Cubic Yard
25116
Geotextile, Type IV-C
| Square Yard |
| 455 |
30105
Aggregate Base Course, Grading D
Cubic Yard
30207 Aggregate Surface Course, Compaction Method 2
Cubic Yard
| 40304 |
| Asphalt Concrete, Caltrans Type A |
| Ton |
| 36 |
55201
Structural Concrete, Class A (AE)
Cubic Yard
55301 Precast, Prestressed Concrete Structural Members 1'-9" x 4'-0" x 46'-0" Voided Slabs
Each
| 55401 |
| Reinforcing Steel |
| Pound |
| 6,071 |
| $________ |
55601
Steel Bridge Railing (2 Layers Type II, Class A)
Foot
56401
Elastomeric Bearing Device
Each
60505
Geocomposite Sheet Drain System
Square Yard
61701
Bridge Approach Rail System G4, Type II, Class B
Foot
61401 Lean Concrete Backfill
Cubic Yard
61702 Terminal Section, Type G4-CRT with Concrete Anchor
Each
61706
Connection to Bridge Rail Structure
Each
63307
Object Marker, Type 3
Each
63501
Temporary Traffic Control
Lump Sum
ALL
BASE ITEMS SUB TOTAL:
B- 2 - SCHEDULE OF ITEMS (OPTION ITEMS)
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| 30207 |
| Aggregate Surface Course, Compaction Method 2 |
| Cubic Yard |
| 65 |
| $________ |
| $____________ |
| 30301 |
| Road Reconditioning blading, ditch cleaning and culvert cleaning. |
| Mile |
| 1.78 |
| $________ |
| $____________ |
OPTION ITEMS TOTAL:
BASE ITEMS & OPTION ITEMS TOTAL:
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.