127EAW21R0006 - RFI Official Responses - 2.pdf
PDF 114 KB Posted
- Solicitation number
- 127EAW21R0006
About this file
This document contains responses to requests for information (RFIs) related to Solicitation 127EAW21R0006 for the West Lights Creek Bridge Installation Project with the Mount Hough Ranger District of the Plumas National Forest. The RFI responses clarify that concrete additives extending setting time are allowed; the closest metered water source is approximately 16 miles away; onsite camping and travel trailers are permitted with proper waste facilities; and the contractor is responsible for sourcing their own precast manufacturer. The solicitation is set aside totally for small businesses with an estimated value between $500,000 and $1,000,000. All RFIs must be submitted to the Contracting Officer by April 7, 2021.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES
127EAW21R0006 - West Lights Creek Bridge Installation Project
RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov
Telephone requests for information will not be accepted or returned.
RFI #1 – Will concrete additives be allowed to Increase Setting Time?
USFS Response – In accordance with FP-14 Section 552 “Structural Concrete”, Hydration
Stabilizing Admixtures may be used to extend the allowable delivery time for concrete. Refer to
Section 552 for details.
RFI #2 – How far is the closest metered water source? Miles?
USFS Response – For metered water sources, contact the Indian Valley Community Services
District (located in Indian Valley, 16 miles south of the project) to determine if they will make available their water sources.
All water sources on forest lands are non-potable and do not require metering.
RFI #3 – Will travel trailers be allowed on jobsite?
USFS Response – Onsite camping may be requested in accordance with the Statement of Work document, Section C, Part C.6 ( l ). Travel trailers are an acceptable means, as long as toilets are provided in accordance with Section C, Part C.6 ( k ), or trailer trailers have self-containment system for waste.
RFI #4 – Can I request the Pre-cast manufacture, designer, consultants contact information?
USFS Response – Unless otherwise indicated on the plans, the contractor shall be responsible for sourcing their own manufacturer for the precast, prestressed members, to be constructed in accordance with the specifications and drawings.
RFI #5 – If bids substantially exceeds engineers estimate will funding be made available?
USFS Response – All information regarding available funding for this project is proprietary information to the Forest Service and will not be disclosed beyond what is mentioned in the
Statement of Work document, Section C.5.