This document contains responses to requests for information (RFIs) regarding solicitation number 127EAW21R0006 for the West Lights Creek Bridge Installation Project. The Forest Service provided a geotechnical report investigating subsurface conditions at four locations near proposed abutment sites, noting soil conditions may vary across abutment areas. No separate hydraulic report was available, as all relevant data is shown on drawing sheet R-1683-01 in the plan set and anticipated water surface elevations at the 100-year flow. The project has an estimated value between $500,000 and $1,000,000, is set aside 100% for total small businesses, and RFIs must be submitted to the Contracting Officer no later than April 7, 2021. The Department of Agriculture Forest Service R5-Pacific Southwest Region is the agency responsible for this solicitation.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES
127EAW21R0006 - West Lights Creek Bridge Installation Project
RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov
Telephone requests for information will not be accepted or returned.
RFI #1 – Is there geotechnical information available?
USFS Response – Provided is the Forest Service Geotechnical Report for the site. The Forest
Service investigated subsurface condition at four locations, approximate to the locations of the abutment. Soil information is only accurate at the four locations holes were dug by excvator, as soil condition may vary over the full length and width of both new abutments.
RFI #2 – Is there hydraulic information available?
USFS Response – There is no hydraulic report available for viewing. All hydraulic data is shown on bridge drawing sheet R-1683-01 (or sheet 15 of 22). Anticipated water surface elevation at the
100-year flow is also shown on the various profile views in the plan set.