A-7 QnA Version 1 - 04.20.21.pdf

PDF 179 KB Posted

Attached to
Longbell Barracks and Fire Office Repairs Federal contract opportunity
Solicitation number
127EAW21Q0007
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Longbell Barracks and Fire Office Repairs, newest first.
File Type Posted
A-6.2 Project Plans.pdf PDF
A-6.0 127EAW21Q0007.pdf PDF
A-6.3 WD CA20210030, Mod 0, dated 01.01.2021.pdf PDF
A-6.4 WD CA20210007, Mod 7, dated 04.02.2021.pdf PDF
A-6.1 Specifications.pdf PDF
A-6 Questionaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Document

Long Bell Barracks and Fire Office Repair (127EAW21Q0007)

Version 1: 04/20//2021

General Q1: Will there be access to power/generator or will we need to provide our own power source?

A1: A portable source(s) is recommended. The Forest Service can make power available; the contractor will be responsible to manage and turn off and on the station generator each day if needed.

Q2: Can the contractor stay on site during construction?

A2: Yes, outside. A trailer pad w/sewer connection can be made available if the station is unoccupied with firefighters.

Q3: Staging area?

A3: There is ample space to stage supplies around the station during the work window outside the main firefighting season.

Q4: Restroom facilities?

A4: See A2 above for staying on site. If unoccupied with firefighters, on-site restrooms can be used. Otherwise the contractor shall provide a portable unit for their employees to avoid sharing restrooms.

Barracks Deck Q5: Do you want boot cleaning grates in front of the barracks doors as there are now?

A5: Yes

Q6: Do you want a bench on the large deck like now?

A6: Yes

Q7: Do you want to stay with a 36” rail height or would you like to increase it to 42” (as per code requirements)?

A7: 42 inches

Q8: Can we reuse the deck piers?

A8: Yes – if suitable the piers can be re-used. If not, pour-in-place are required.

Q9: Free-standing or attached structure?

A9: Attached to building preferred.

Q10: Hand railings down to ground, or end with deck as is now?

A10: End with deck.

Office Roof Q11: Do you want fascia added to the sides of the fire office or left as is?

A11: Left as is would be fine.

Q12: Do you want gutters?

A12: No.

Q13: Does the chimney need to be removed under the roofline?

A13: No, just adequately sealed off.

Q14: High-ribbed roofing, or standing seam?

A14: Screwless or hidden-fastener high-rib style metal, to match the existing barracks roof.

Barracks Siding Q15: Is HardiePlank type siding what you want?

A15: Yes, HardiePlank type siding is what we want. The Forest Service is open to other brand options equal to or better than.

Q16: Does the siding need to be painted?

A16: Yes, the final product must match the surrounding buildings.

Q17: Should the shutter brackets be retained? Should they be repaired if needed?

A17: Yes.

Q18: Do the concrete landings need repair?

A18: This is not part of the original scope of work. An optional bid for these kinds of non-required improvements may be considered for award.

Q19: Do the windows need to be replaced?

A19: No. An optional bid for these kinds of non-required improvements may be considered for award.

Office Flooring Q20: Is there heat/heaters available in the office for flooring installation?

A20: Yes.

Q21: What is included in the scope of work for rodent proofing and crawl space work?

A21: Any work necessary to prevent entry of rodents. This includes improving the security and sealing off the exterior crawl space entry/foundation as well as interior. Problem areas include near the shower and behind the toilet.

Q22: The specifications are for glued down laminate flooring; would you prefer floating?

A22: Yes, floating plank flooring is preferred.

Q23: Structural work involved with the flooring?

A23: Yes, any needed structural repairs shall be included prior to re-flooring.