This is a Performance Based Work Statement for the White Sage Fire Aerial Seeding project for the Kaibab National Forest in Arizona. The contractor must conduct emergency aerial seeding on approximately 700 acres within the White Sage Fire footprint to prevent invasive species invasion into sensitive Kaibab plains cactus habitat. The project is located on the North Kaibab Ranger District at elevations between 6,500' and 7,500' feet near Jacob Lake, Arizona, within the Trail Canyon and House Rock Canyon watersheds.
The primary deliverable is Item 0001—native seeding processing, handling, and application—requiring certified weed and trash-free seed to be applied at 30 seeds per square foot (7 western wheatgrass, 5 bottlebrush squirreltail, 3 prairie junegrass, and 15 sterile Triticale seeds) with continuous, uniform coverage across all treatment units. Seed must be tested and certified with minimum 80 percent germination and 90 percent purity, submitted on a Pure Live Seed (PLS) basis, and must comply with state and federal noxious weed seed requirements with no appreciable contamination from cheatgrass, Japanese brome, Russian thistle, or other invasive species. The anticipated start date is June 15, 2026, with a 30-day period of performance to allow for processing, handling, application, and weather delays; estimated flying time is 4–5 days for the 700-acre seeding. The contractor must furnish all seed, equipment, personnel, staging area selection and restoration, spill containment plans, Quality Control Plans, Site Safety Plans, Aviation Safety Plans, daily progress reports with GPS tracking data, and final reporting documentation. The Government will provide printed maps and GIS shapefiles of treatment units and identify potential staging areas on National Forest lands. Work restrictions include no operations during excessive rain, wind, or fog; operations must occur between civil sunrise and sunset and comply with FAA Visual Flight Rules. The contract may be cancelled if no suitable weather window occurs by August 1, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
White Sage Fire:
Aerial Seeding for Invasive Species Prevention
I.PERFORMANCE BASED WORK STATEMENT
A. PURPOSE
Long-term drought and high fuel loading in southwest forests have led to prolonged and extreme fire conditions.
Wildfires cause impaired soil conditions and leave open areas free of vegetation where invasive species can take hold. In the White Sage Fire footprint, habitat quality and long-term viability for populations of Kaibab plains cactus (Pediocactus paradinei), a rare plant species protected by a conservation agreement, are at risk from cheatgrass and noxious weed invasion into areas of pinyon-juniper woodland that burned in this area. Cheatgrass is currently absent or minimally present within most of these populations’ watersheds, but in the context of disturbance from wildfire and wildfire suppression activities, it could infest the area and permanently alter the natural fire patterns and native plant ecosystems. Altered plant compositions due to weed infestations and changed fire patterns threaten the viability of Kaibab plains cactus in this portion of its range; in the long-term, it has the potential to convert this habitat unit and adjacent ones into frequent fire annual grassland that does not serve as suitable habitat for the species.
The Purpose of this project is to implement an emergency seeding to prevent invasive species incursion into sensitive habitat of Kaibab plains cactus in areas of the White Sage Fire that were previously largely uninfested by cheatgrass and noxious weeds. Seeding will allow for vegetation recovery to provide coverage to denuded or depleted burn areas and protect the cactus populations from habitat degradation due to cheatgrass invasion. The majority of work is expected to be completed aerially due to the sensitivity of the soils in the area to motorized use and the need for wide areal coverage (approximately 700 acres). This emergency action must be accomplished quickly, as the cover crop species used is a cool season grass that does best when planted in the fall, and to gain a competitive edge before cheatgrass invasion and growth. Areas will be treated with a designated seed mixture.
Suitable areas within the Kaibab plains cactus population’s habitat extent include those that burned at moderate or higher vegetation mortality (above 25% basal area) and are at less than 30% slope, with low to moderate erosion potential.
a) All services procured shall be accomplished in a safe, effective, environmentally aware manner and in accordance with all federal, state, and local laws and regulations.
b) The Contractor shall keep and maintain programs necessary to assure safety of ground and flight operations. The development and maintenance of these programs are a material part of the performance of the contract. When, in the sole judgment of the Contracting Officer, the safety programs do not adequately promote the safety of operations, the Government may terminate the contract for default.
Examples of such programs include but are not limited to 1) Personnel Activities, 2) Maintenance, 3)
Safety and 4) Compliance with Regulations.
c) Contractor personnel shall conduct themselves in a professional and cooperative manner in fulfilling this
Contract.
B. EQUIPMENT REQUIREMENTS
The contractor shall comply with all applicable federal, state, and local regulations and directives pertaining to safety, maintenance, and performance of all aircraft and ground-based equipment proposed for use under this contract. Additionally, aircraft and ground-based equipment shall be maintained in accordance with all manufacturer’s guidelines and bulletins.
Contractor-furnished aircraft and equipment shall be operable, free of damage, and in good repair. Equipment shall be free of weed seed, dirt, and plant parts. Aircraft and other equipment systems and components shall be free of leaks except within limitations specified by the manufacturer.
C. CONTRACTOR’S ENVIRONMENTAL RESPONSIBILITIES
The Contractor is responsible to ensure that all maintenance, fueling, and flight activities do not cause environmental damage to property or facilities.
Contractor shall remove all of his/her own trash and refuse from the contract area. The Contractor shall provide and maintain sanitary facilities. Solid waste shall be disposed of in accordance with applicable Federal, State, and local regulations.
The Contractor shall be responsible for compliance with applicable Federal, State and local regulations with regards to the reporting of response actions required for spills of fuel, and oil on airport ramps, staging areas, parking areas, landing areas, etc., when caused by Contractor aircraft or personnel. When cleaning paved areas, the contractor shall utilize cleaning agents that are biodegradable and non-toxic. Contaminated soils shall be removed to appropriate containers and disposed of as hazardous waste.
The Government may, at its discretion, provide a designated area to be utilized by the Contractor for storage of equipment used in support of contract performance. Oil, solvents, parts, engines, etc. shall be stored and utilized in a manner consistent with acceptable safety, health and environmental concerns.
The Contractor shall ensure compliance with 40 CFR Part 112: Oil Pollution Prevention; Spill Prevention, Control, and Countermeasure Plan Requirements (SPCC). An SPCC plan is required for each mobile fueler used on this contract regardless of bulk storage container (tank) size.
The Contractor shall be responsible for all damage to property and to persons, including third parties that occur as a result of his/her agents or employee's fault or negligence. The term "third parties" is construed to include employees of the government.
D. SITE VISIT
No site visit is planned.
E. LOCATION
The project area consists of 700 acres for aerial seeding on the North Kaibab Ranger District of the Kaibab
National Forest in Arizona. Units covered for seeding are located in the Kaibab plains cactus habitat area
(within the Trail Canyon and House Rock Canyon watersheds) of the White Sage area near Jacob Lake, in
Coconino County, Arizona.
The elevation range is 6,500’ to 7,500’ above mean sea level for the treatment area. It is primarily north of
State Highway 89A on the east side of the Kaibab Plateau, with a small area occurring south of the road; east of the Jacob Lake area and west of House Rock Wash. A general vicinity map with treatments units is contained in the exhibits, and Geographic Information Systems (GIS) shapefiles of project areas will be provided electronically at time of award. All of the treatment units are located within the White Sage Fire perimeter on National Forest system lands.
F. SCOPE OF WORK
Project White Sage Aerial Seeding (North Kaibab Ranger District, Kaibab National Forest):
• White Sage Units, 700 acres
Item 0001 – native seeding processing, handling, and application
Contractor shall apply certified weed and trash free seed on 700 acres on units in Kaibab plains cactus population and habitat areas (within the Trail Canyon and House Rock Canyon watersheds) on
National Forest System lands in the White Sage Fire footprint to achieve an end-product of:
(1) 7 seeds of western wheatgrass (Pascopyrum smithii), 5 seeds of bottlebrush squirreltail (Elymus elymoides ), 3 seeds of prairie junegrass (Koeleria macrantha), and 15 seeds of Sterile Triticale
(QuickGuard) for a total of 30 seeds per square foot.
(2) A continuous cover of uniform thickness across the entire unit.
(3) Provide all documentation of weight of seed delivered, seed tags or transportation paperwork
(e.g., transit certificates) from each lot of seed delivered (including any yellow Source Identified
Seed tags), and any seed lab test results.
G. EXCLUSION/NON-WORK AREAS
There should be no exclusion areas inside the units. All units are mapped.
H. OTHER SPECIFICATIONS
1. Weed-free Seed - Supplied seed must be in compliance with seed laws for the State of origin of the seed and the State where the seed will be applied. The certification process of the State serving as the seed source must be met unless the seed is tested according to the certification process of the State where the wholesaler is located. Seed must be tested and certified to be free of noxious weed seed according to (1) the noxious weed lists of the States of origin and destination and (2) noxious weed listings for all 50 States found in USDA’s State Noxious–Weed Seed Requirements Recognized in the Administration of the
Federal Seed Act. Seed must also be free from prohibited, restricted, and forest-prohibited weed species as determined by seed laws of the States of origin and state of application. In addition, seed lots should not contain seed in any appreciable amount from cheatgrass (Bromus tectorum), Japanese brome
(Bromus japonicus), Russian thistle (any Salsola species), and any weed species prohibited by a national forest unless specifically authorized by a COR (contracting Officer’s Representative). The Forest Service is also concerned about other weed species such as yellow bluestem (Bothriochloa ischaemum) or
Caucasian bluestem (Bo. bladhii) that are adapted to arid conditions but are not addressed in State noxious weed laws but have the potential to be injurious when seeded on National Forest System (NFS)-administered land. The combined total weight of seed from all other weed species (apart from noxious, prohibited, restricted, and forest-prohibited species) should not exceed 0.5% in a seed lot. Also, the seed lot should contain no more than 2% by weight (total) of non-weedy types of seed which includes seed from agronomic crops and native, non-weedy plant species other than those specified in the contracted seed mix.
2. Seed sampling and testing procedures- Representative seed samples of individual lots should be pulled after the seed is received for a seeding project. If Forest Service personnel are unavailable to pull samples, Contractors must use an independent third-party contractor who is responsible for pulling seed samples from seed lots and then transporting or mailing the samples to the seed lab in accordance with standard chain-of-custody procedures. At its discretion and own expense, the Forest Service may test seed lots.
Seed used for project seeding must have testing completed by a third party and procedures must follow
Association of Official Seed Analysts (AOSA) protocol, and analysis completed at a lab that is a current member of AOSA.
Pre-mix sampling and testing by a Contractor may specifically be authorized by the CO/COR in the event the mix does not pass visual inspections. In general, seed lots should be tested after a specified seed mix has been blended. However, pre-mix testing by a contractor my specifically be authorized by the COR.
Samples taken from seed bags, totes, or bulk lots must be representative of seed variability. For seed lots consisting of 1 to 5 bags (or tote containers in some cases), each bag should be sampled by using a probe or by thrusting a hand into the seed. For lots consisting of 6 or more bags, 5 bags should be selected at random across the lot and sampled including at least 10% of the total number of bags in the lot. However, no more than 30 randomly selected bags or totes should be sampled from the lot regardless of the total number of bags or totes. Individual samples of equal size taken from the bags or totes should be (1) thoroughly mixed and pooled into a composite sample, (2) divided down to the amount required by the seed lab, and (3) put into a single, securely sealed container (zip-lock bag, cloth bag, heavy-stock envelope, etc.) for shipment to the seed lab.
For bulk lots of loose seed in a bin or truck bed, samples of the same size should be taken across evenly distributed portions of the bulk lot. A long probe or trier that can reach all depths of seed should be used to sample randomly within each same-sized portion of the bulk lot. If a probe or trier is unavailable or impractical, the samples should be taken manually by thrusting a hand into the seed. To derive the number of samples to be taken, the gross amount of seed in the lot should be divided by the average wt. of a seed bag, which typically is 50 lbs. (e.g., 1,000 lbs. seed ÷ 50 lbs. seed = 20 seed samples). However, no more than 30 cores or handfuls should be taken from the bulk lot regardless of the total amount of seed.
Individual samples of equal size taken as cores or handfuls should be (1) thoroughly mixed into a composite sample, (2) divided down to the amount required by the seed lab, and (3) put into a single, securely sealed container (zip-lock bag, cloth bag, heavy-stock envelope, etc.) for shipment to the lab.
Contracted seed must be stored and handled securely after samples have been pulled and until delivery to the project site.
3. Seed Quality – All bids will be submitted on a PLS basis. All seed will have no less than 80% germination
(TZ test acceptable) and 90% purity. Vendor will provide certification that the seed has been tested for germination and purity (with weed seed content, crop seed content, and inert matter provided) within the last 120 days. If weed seed content exceeds 0.5%, the seed may be rejected by the Forest Service. In addition, the seed lot should contain no more than 2% by weight of other types of non-weedy plant species seed other than those specified in the requested seed mix. Seed certification tag without documentation will not be accepted. Preference may be given to seed collected in the western or southwestern parts of the US and are Source Identified Seed.
4. Seed Acceptance – Test results certifying that the seed meets these standards is required to be provided for specific seed lots before acceptance by the Forest Service. Also, at its discretion and own expense, the
Forest Service may test seed lots before using the seed in project seeding. The Forest Service reserves the right to reject seed mixes by lot number that: 1) do not meet contractual requirements for seed mix percentages, PLS, or Source Identified Seed, 2) are not free of noxious or prohibited weed seed in any appreciable amounts, 3) have restricted weed seed content greater than allowed by State standards, 4) contain any seed from annual bromegrasses (cheatgrass, Japanese brome, etc.), yellow bluestem, Caucasian bluestem, Russian thistle, or any forest-prohibited weed species unless specifically authorized by the COR, 5) exceed contents stated above for other types of weed seed or crop seed, and 6) Are improperly cleaned.
If a suitable source of seed cannot be found to meet a particular time frame or limitations on cost, the
Forest Service may alter seed requirements in the task order (except test requirements for invasive or common weeds) or cancel the order
I. STAGING AREAS
Selection of suitable staging/service/landing areas shall be the responsibility of the contractor.
Contractor shall be responsible for all restoration and rehabilitation of staging areas on NFS administered lands.
Contractor clean-up and restoration activities shall be in a manner that the sites will recover to original pre-use conditions. Special precautions shall be in place prior to aerial operations to limit spread of weeds from staging areas. This may include, but is not limited to, fencing and daily clean-up of work site to reduce the spread of project materials.
For staging areas located on lands other than NFS administered lands, the contractor shall be responsible for all use arrangements, rental agreements, liability to property, and transporting of equipment and supplies necessary to execute this contract, including the storage of seed as necessitated by weather conditions. If staging areas on land other than NFS administered lands, the contractor shall take measures to ensure the staging areas are free of noxious weeds. Non-FS administered land staging areas shall be inspected and approved for use by the Forest
Service prior to use. The main concern at these locations are weeds that could be transported to the Forest. The contractor must comply with restoration and rehabilitation requirements of staging areas on all lands. The requirements for staging area restoration and rehabilitation may be different for NFS administered lands than other lands. Access to third-party lands must be made available to the CO/COR.
J. CONTRACTOR-FURNISHED ITEMS/SERVICES
The contractor shall furnish seed to a pre-determined staging area(s). This includes transportation, support equipment such as loaders, application/installation equipment, support personnel, clean-up and restoration of staging areas, and services required to perform the requirements of the contract in accordance with specifications herein. The Contractor is responsible for all costs incidental to equipment move-in and move-out, movement of equipment within the project area, and transportation of all Contractor-furnished property, including government provided seed (if applicable).
Selection of staging and service landings. Any arrangements for use of lands that are not administered by the
Forest Service shall be made by the Contractor. The Contractor assumes all liability for operation, and rehabilitation of sites.
Warning signs on roads and trails leading to operations at the staging area, and application sites shall be installed.
The Contractor shall be responsible for signing, barricades, and traffic control on roads, and trails to maintain a safe environment to the public, contractor, and Government Employees. It shall be the responsibility of the
Contractor to contact local municipalities and governments for applicable signage permits. All traffic control shall be in accordance with the most recent edition of the Manual of Uniform Traffic Control Devices (MUTCD). The
Forest Service may issue closure orders in conjunction with contractor’s efforts.
Road Guards for all aviation operations that require flying over roads or near homes.
Trail Guards on the access points to trails that are within the flight paths of aerial operations.
Disposal of spilled seed, packing materials, pallets and/or other waste material is the responsibility of the
Contractor. Contractor shall be responsible for all restoration, and rehabilitation in staging areas. Clean-up and restoration shall require that the restoration of sites will allow recovery to original pre-use conditions or conditions as agreed with landowner. To limit spread weed materials, special precautions shall need to be in place prior to aerial or ground operations. This may include but is not limited to adding fencing and daily clean-up of work site to reduce spread of project materials. Contractor shall submit a plan outlining what precautions and mitigation will be in place to limit spread of material prior to project initiation. This shall include daily clean-up plans, mitigation strategies, and equipment that will be used to meet above mentioned specifications. A written plan shall be provided to the Contracting Officer for evaluation.
Contractor is responsible for providing spill containment kits for all petroleum products used to complete contract. All fueling shall be at a distance greater than 100’ from intermittent streams. A written plan shall be provided to the Contracting Officer for technical evaluation regarding spill containment strategies.
Contractor is responsible for compliance with applicable Federal, State, or local regulations with regards to the reporting of and response actions required for any spills of diesel fuel, aviation fuel or gasoline, all considered hazardous materials. If a spill occurs, the Contractor shall assume all liability and responsibility for clean-up to meet EPA and applicable state water quality standards. A written plan for dealing with such spills shall be provided to the Contracting Officer for evaluation prior to starting operations.
Contractor is responsible for rehabilitation of the staging area following clean-up. On lands administered by the
FS, this shall include but not limited to de-compaction of soil, seeding, road maintenance, rehabilitation of roads that receive damage from excessive wear and tear, examples include but are not limited to stuck vehicles, damage to trees, fences, gates, and trails. This project may require grading roads prior to and/or upon completion of the project.
Contractor is responsible for cleaning of all vehicles to ensure they are free of soil, seeds, vegetative matter, or other debris that could contain or hold non-native noxious weed seed prior to entering Forest Service land.
Contractor shall certify in writing, compliance of terms prior to moving equipment onto job site.
Contractor is responsible for providing a personal computer to complete daily progress report for CO or their designee.
Contractor shall provide a communication system so that contractor personnel, aircraft, and Government project inspectors can communicate at all times with each other to discuss performance matters, or safety issues. VHF-
FM radios must have high band capabilities and must be capable of reaching narrow band frequencies.
Contractor furnished Quality Control personnel must have electronic equipment capable of capturing coordinates using a Global Positioning System (GPS). The Government will provide polygons for each treatment unit as GIS shapefiles or .kmz files to be downloaded in aircraft GPS units. A completed map of coverage areas shall be provided by the contractor during and at the end of the project denoting where all aerial and/or ground operations have occurred. Contractor must also supply SATLOC or similar GPS tracking information on a daily basis for aerial seed applications.
K. PROJECT SAFETY AND RESOURCE PROTECTION OBJECTIVES
All plans referenced below shall be submitted with the written proposal for review. Contractor shall comply with all Government Safety and Health regulations and the Department of Labor Occupational Safety and Health
(OSHA) standards, and Department of Transportation (DOT) regulations.
1.1 Site Safety Plan: At time of award, the Contractor shall submit a written site-specific safety plan for each project site, staging area(s), and Forest Service or private roads leading to staging area(s). This includes procedure for traffic control (air traffic if applicable), communication (air-to-ground and ground-to-ground), equipment use, signing, and protection of personnel and public. This plan will be used during the pre-work and subsequent meetings to ensure safe operations. This document will also be used for quality assurance standards during the project. Special permits, if required for operation within the applicable state, county, and/or city will be required at the pre-work meeting.
1.1 Aviation Safety Plan: Within 24 hours after award, the Contractor shall submit a detailed Aviation Safety
Plan where aerial operations are conducted. The plan shall include flight routes to avoid homes, or areas in use by the public. The plan shall indicate, where applicable, the use of security personnel to stop traffic over roads, limit travel on trails in project areas, etc. Coordination with commercial and private aviation traffic shall be submitted as part of the plan. The plan shall include communication procedures to monitor location of aircraft assigned to the project, a crash rescue, and missing aircraft plan.
1.2 Site Specific Rehabilitation Plan – Within 72 hours after award, the Contractor shall submit a detailed site-specific rehabilitation plan that outlines specific practices and activities the Contractor will perform after completion of the aerial operations at all sites Contractor-created disturbance (staging areas, stackyards, processing landings, helibases, helispots, and/or camps).
L. REQUIRED DOCUMENTATION
1) Seeding (item 0001)
a) Written documentation of the total amount (in pounds) of seed delivered.
b) Seed tags or transportation paperwork from each lot of seed delivered (including any yellow Source Identified Seed tags) that must be attached to a separate sheet.
c) Applicable Seed lab test results.
d) Written certification of compliance with terms for cleaning vehicles and equipment prior to moving onto job site
1.1 Daily Operational Report (all items). Daily progress reports are to be provided to the Government representative at the end of each operational period or the next day during the morning briefing. No additional work that day shall commence until documentation is provided.
(a) Updated map indicating the area within the unit that has been treated.
(b) The approximate number of acres treated within each unit by treatment type.
(c) Total flight time (hours) for each aircraft and treatment.
(d) Estimate of total product (tons) applied to unit(s).
1.2 Final Report (all items). A final report (2 hard copies) shall be provided which includes at a minimum:
2. written report shall contain daily field conditions, application rates and areas covered, site conditions, and any other pertinent data that records the application of the product. The report shall contain a summary of the results of the application.
M. ACCIDENT PREVENTION AND SAFETY
The Contractor shall keep and maintain programs necessary to assure safety of ground and flight operations. The development and maintenance of these programs are a material part of the performance of the contract. When, in the sole judgment of the Contracting Officer, the safety programs do not adequately promote the safety of operations, the Government may terminate the contract for cause as provided in the “Contract Terms and
Conditions”. Examples of such programs are but not limited to: 1) Personnel Activities, 2) Maintenance, 3) Safety and 4) Compliance with Regulations.
The Contractor shall fully cooperate with the Contracting Officer in the fulfillment of this clause. The Contracting
Officer may suspend performance of this contract work, during the evaluation period used to determine cause as stated above.
N. GOVERNMENT-FURNISHED PROPERTY
Printed maps of treatment areas shall be provided for the award. The Government will also provide electronic or digital data that represent the treatment areas.
Where applicable, the Government will identify potential staging areas on NFS administered lands.
The Government will identify usable roads and access points for transportation of material.
O. ANTICIPATED START DATE AND CONTRACT TIME
Start: In June 15, 2026, after receipt of the award from the Contracting Officer and when weather conditions allows.
Period of Performance is 30 days to allow for processing, handling and application of seeding and mulching to include weather delays, and invoicing Flying time for seeding is estimated as 700 acres seeding per necessary aircraft for a total of 4-5 days. Application rate assumes full 12-hour day without delays due to weather or equipment.
The Contractor, in conjunction with the Forest Service, will monitor the weather and either party can contact each other to see if the window is conducive for operations to start. Time for set-up, seed deliveries and other logistical operations will be evaluated during contract proposal ratings and negotiated at time of award.
P. CAMPING
The Contractor must request permission to camp in this area from the District Ranger. Camping will only be permitted with District Ranger approval.
Q. KEY PERSONNEL
Key personnel are those personnel (pilots, supervisors, ground crew, etc.) considered essential for successful completion of this contract. All key personnel shall be identified in the Contractor’s Technical Proposal.
The Contractor agrees that assigned key personnel shall not be removed, substituted, or reassigned to another task without the written concurrence of the Contracting Officer. The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed personnel change and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. If the Contracting Officer determines that suitable replacement of key personnel is not feasible or that the reduction of effort would be so substantial as to impair the successful performance of the work, the Contractor may be subject to default action under the affected award(s) or the contract. Ultimate approval/disapproval to replace key personnel is the responsibility of the Contracting Officer.
Key personnel shall be available to the FS for communications during the entire contract. If Contractors key personnel become unavailable, the FS will be notified immediately with the reason and new contact information given to the CO and COR.
R. APPROVAL OF SUBCONTRACTORS
The Contractor shall request approval from the Contracting Officer prior to entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:
a. The name, address, and telephone number of the subcontractor.
b. The date upon which the subcontract was entered into and its duration
c. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
d. Documentation of the subcontractor's representative authority.
Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
S. RESTRICTIONS ON WORK
Work may be performed at any time during the period of the contract after award except as outlined here.
Nothing in this part shall be construed to take away any of the Government’s rights under the Suspension of
Work Clause (52.242-14). Restrictions are as follows:
1) The CO will make a final determination to continue the project when weather increases the risk of poor distribution of mulch and seed. If the determination is made to stop work, then the contractor will store and protect all materials during extended durations of adverse weather. The contract may be cancelled if no window of opportunity has happened by August 1, 2026. It will be re-evaluated at that time.
2) No seed will be applied during excessive rain, wind or fog. Application will be made only when weather conditions meet FAA visual flight rules (VFR). Flight operation will comply with all
Federal Aviation Regulations.
3) Operations shall be conducted between civil sunrise and civil sunset.
T. FINAL CLEAN-UP
The Contractor shall be responsible for any unused seed material once contract specifications have been attained.
In order to utilize any unused seed material, the FS has the discretion to allow the contractor to apply the unused seed materials to treatment units that have met contract specifications thereby increasing number of seeds per square foot and/or percent ground cover above minimum requirements. The FS may also allow the contractor to apply any unused seed materials to adjacent burned areas. The FS is under no obligation to pay the contractor for any application or removal of unused seed material after contract specifications have been met. The contractor is under no obligation to apply or use any unused seed material beyond contract specifications but is responsible for removal of unused seed materials.
Before final acceptance, all areas occupied by the Contractor in connection with the work shall be cleaned of all
Contractor's garbage, excess materials, temporary structures, and equipment, and all parts of the work area shall be left in a neat and presentable condition.
II. QUALITY ASSURANCE AND QUALITY CONTROL
A. CONTRACTOR’S QUALITY CONTROL (QC)
The Contractor, not the Government, is responsible for management and quality control actions to meet the terms of this contract. QUALITY CONTROL is performed by the Contractor to ensure that all activities performed under this contract by Prime or approved Subcontractors are in compliance with the contract objectives and specifications. The Contractor’s process for performing Quality Control shall be clearly described in the Quality Control Plan (QCP). The Contractor shall conduct inspections on all units in accordance with his/her QCP.
A description of the quality control plan (QCP) shall be provided within 72 hours of award and accepted by the government. Whereas it will become part of the contract. The plan shall include; (1) control procedures for security of Government-provided items such as keys, and lock combinations; (2) location of the inspection documents; (3) how quality control inspections will be performed and what designates passage and failure of treatment units; (4) corrective or preventive actions that shall be taken to meet quality standards; and (5) a customer comments feedback system.
Records of quality inspections shall be kept and made available to the Government throughout the performance period and for the period after contract completion until final settlement of any claims under this contract.
B. GOVERNMENT’ S QUALITY ASSURANCE (QA)
The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work of the Contractor.
QUALITY ASSURANCE is performed by the Government to determine that the services provided by the
Contractor meet the objectives and specifications of the contract. This process of Quality Assurance does not relieve the Contractor of their responsibility for inspections.
Quality assurance will be performed by the Government during the contract at regular intervals. Methods may include visual survey and/or review of Contractor quality control documents. Deduction for work may include rework at no cost to the Government or Government acceptance with price reduction.
Compliance Inspections
Visual compliance inspections will be conducted during all activities performed by the Contractor. Such inspections are part of the Government inspection and documented with photos and GPS points. However, this inspection shall not determine Acceptance of a Treatment Unit. The Contractor may be required to apply additional seed to areas 1 acre or larger with insufficient cover as determined by the COR. This request from the
COR is not considered “re-work”.
Field inspectors will stage at vantage points as close to the treatment areas as possible. Communication with
Contractor’s Pilots, Field Inspectors and COR will be of utmost importance during field operations to monitor contract compliance. Comments, pictures, and other documentation from inspectors will be provided as feedback to the COR on each treatment area.
Inspection for Acceptance and Payment
Upon completion of Contractor’s Inspection (Quality Control) and clearance of a Treatment Unit, the
Contractor is required to submit a written request to the Government to perform an Inspection for Acceptance and Payment. The method of written request submission should be discussed and agreed upon during any Pre-
Work meeting. This request certifies that the Contractor believes they have met contract specifications within the Treatment Unit(s). The Government shall complete the Inspection for Acceptance within 2 working days for Item 0001 (seeding).
The COR shall have authority on the acceptance or non-acceptance of a completed Treatment Unit based on the best interest to the Government and make the final recommendation to the Contracting Officer. If any of the services do not conform to contract requirements after inspections, the Government will request the Contractor to re-work the areas in non-compliance to meet contract specifications, with no increase in contract amount.
For more information regarding this circumstance, refer to “Re-inspection after Rework”.
If there is a difference in inspection results between the Contractor’s Inspection and the Inspection for
Acceptance; AND the Contractor believes a re-work to be unnecessary or refuses the re-work request, the
Contractor may dispute the results of the Inspection for Acceptance. In this circumstance, the provisions described in “Disputed Inspection” apply.
Disputed Inspection
The Contractor may request re-inspection without rework if the Inspection for Acceptance results are unacceptable. Re-inspection must be requested in writing within 48 hours after receiving written notice of the inspection results. Re-inspection will be accomplished within four working days after receipt of the contractor's written request. The same sampling and inspection procedures will be used, but new sample points will be recorded. The inspection pattern will be shifted so that new samples will not overlap previously inspected samples.
Results will be rounded to the nearest whole percent.
Re-inspection after Rework
Where rework after a failed inspection may improve the inspection results, the Contractor will have one opportunity to rework the area and request a second inspection in writing. The Government may charge the cost of this additional inspection to the Contractor. Re-inspection will be accomplished within 2 working days for Item 0001 (seeding) after the notice is received in writing. The results of the second inspection will be final and no further rework will be permitted. Areas not ready for re-inspection at the time specified by the
Contractor will not be re- inspected and the results of the first inspection will be final.
When defects in services cannot be corrected by rework, the Government may: (1) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and/or (2) reduce the contract price to reflect the reduced value of the services performed. The Government would do this by calculating the amount of unacceptable acres and reducing it by the bid price per acre associated with the Item.
If the Contractor fails to promptly perform the services again or does not take the necessary action to ensure that future performance conforms with contract requirements, the Government may: (1) by contract or otherwise procure the services of another entity and charge the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate for Default.
Final Inspection
The final inspection will be performed by the COR after the Contractor has certified that all Items, activities, close-out, documentation and reporting, site rehabilitation (processing, staging, helispots, landings, campground), and clean-up are completed and in compliance with contract specifications. All work must be accepted by the COR before Final Acceptance is recommended to the Contracting Officer and Final Payment is approved. The Final Inspection will also serve as the COR’s recommendation for contract closure to the
Contracting Officer.
A. Quality Assurance Plan (Qap)
The contract specifications for Quality Assurance are designed for performance-based end-product results. It is the Contractor’s responsibility to determine the adequate application rate (lbs or tons per acre) to apply to each Treatment Unit to meet the end-product specifications described in the table below. It is also the intent of this contract to treat all acres within each Treatment Unit.
(1) 7 seeds of western wheatgrass (Pascopyrum smithii), 5 seeds of bottlebrush squirreltail (Elymus elymoides ), 3 seeds o prairie junegrass (Koeleria macrantha), and 15 seeds of Sterile Triticale
(QuickGuard) for a total of 30 seeds per square foot.
(2) a continuous cover of uniform thickness across the entire unit, and
(3) provide all documentation of weight of seed delivered, seed tags or transportation paperwork
(e.g., transit certificates) from each lot of seed delivered (including any yellow Source Identified
Seed tags), and any seed lab test results.
B. Plot Or Point Sampling (Government Inspection Methods)
Each treatment area will be sampled by a random series of plots distributed over the entire area.
[X] Transects, when accessible
[X] Other visual inspections
Item 0001 Seeding:
Work will be accepted for payment on the basis of a final inspection and passage of the technical specifications. In accessible areas, a one foot by one foot quadrat (frame) will be randomly placed at ~10% of the total treatment acres on the accessible hill slopes after the product has been applied. Within the quadrat
/frame the # of seeds will be counted. A photo encompassing the general area will also be taken in a random direction at the inspection point to show that the quadrat /frame is representative of the area. A GPS point will be taken, and the general area photo direction will be recorded with a compass bearing.
At each inspection point the Contracting Officer’s Representative (COR) or designated inspector will record the # of seeds, the unit number, location of the inspection point, and the direction of the compass bearing of the general representative area photo.
Data will be collected on each inspection plot on specifications "1" through "4" listed below. To be considered satisfactory the plot must meet the following criteria:
1. Compliance consists of number (#) of seeds per square foot, (2) a continuous cover of uniform thickness across the entire unit, and (3) provide all documentation of weight of seed delivered, seed tags or transportation paperwork (e.g., transit certificates) from each lot of seed delivered (including any yellow
Source Identified Seed tags), and any seed lab test results.
2. Compliance with avoiding all non-Forest land ownership other than stated within the contract.
3. Compliance with avoiding roads, trails, water tanks, cell phone towers, high voltage power lines, Forest
Service radio towers, and all other types of utilities which are located within the National Forest System boundary and all other ownership.
Acceptance
Work on this contract will be deemed acceptable when the quality of work is equal to or greater than the number of seeds per square foot (%) is applied evenly across the units as calculated under Inspection for
Acceptance and Payment. If the overall percentage is greater than or equal to the minimum specifications, payment will be made in full. Additionally, statistical measures of dispersion and variation (e.g. Standard
Deviation and Coefficient of Variation) may also be used to determine uniformity of treatment.
If the percentage calculated from the specifications under Inspection Procedures is below minimum specifications, then one rework will be allowed to remedy the non-compliance. Visual inspections will be documented and included in acceptance/non-acceptance determinations, when deemed necessary by the CO or
COR.
If any noxious weed propagative parts or seeds are observed in the applied seeding and mulch products or treatment units, the COR or designated inspector will document and collect a sample of the material. The COR will notify the contractor that the product or application of the contaminated seed or mulch type will cease immediately.
Inspection and Acceptance Requirements
TASK/ SUBTASK
PERFORMANCE
STANDARD
METHOD OF
SURVEILLANCE
DISINCENTIVES FOR NOT
MEETING STANDARDS
Period of
Performance.
Begin work in a timely manner and complete all aspects of the contract within prescribed time.
Observation if work can be completed within contract timelines.
Notice of non-compliance, cure letter, termination.
Preventative measures made to minimize noxious weed spread at both staging area and within treatment units.
As per Section B in equipment requirements.
Visual inspection by contractor. Contractor shall notify CO of when these inspections occur so
FS may also be present to spot check the inspections.
Curtailment of performance until compliance is obtained.
Upon inspection if vehicles do not meet requirements a receipt from truck wash with license plate number and date is required prior to entering Government Land.
Supply seed for the treatment units
As per Section F in scope of work (SOW).
Contractor meets criteria for daily documentation as outlined in Section 6 of the
SOW
Notice of non-compliance, cure letter, withhold payment, termination.
Accomplish seeding treatment objectives.
As per Section F in scope of work (SOW).
(1) Review ground application quality control reports.
(2) Visual observation after application.
(3) Final approval by contractor inspector using contract method indicated.
(4) FS may conduct random sampling tests of application rates and
Contractor shall be required to rework any area in a unit that fails to meet the cover standards.
Non-acceptance of work until treated to the acceptable quality levels.
Withhold payment.
TASK/ SUBTASK
PERFORMANCE
STANDARD
METHOD OF
SURVEILLANCE
DISINCENTIVES FOR NOT
MEETING STANDARDS
coverage
Contractor to manage quality control.
Provide Quality
Control Plan (QCP) as per proposal information.
Visual inspection by FS inspectors.
Curtailment of performance until compliance is obtained.
Non-acceptance of work until quality control work is accomplished.
Provide daily progress reports
As per Section L in the required documentation.
Review report.
Curtailment of performance until adequate report is submitted.
Provide Final
Report.
As per Section L in the required documentation.
Review report. Withhold payment.
Clean-up and restoration of staging areas.
As per Section T in final clean-up.
Acceptance by Forest
Service or private landowner.
EXHIBIT A:
Seed Testing Labs: Seed labs can be found at these websites:
1. AOSA contact list for seed labs (https://analyzeseeds.com/scst-member-directory/)
2. Arizona Agricultural Laboratory (https://agriculture.az.gov/about-us/divisions/agricultural-laboratory)
3. Colorado Seed Laboratory (http://seedlab.colostate.edu/testing_info.html )
4. New Mexico State Seed Laboratory (http://www.nmda.nmsu.edu/seed-lab/ )
EXHIBIT B:
North American Invasive Species Management Association (NAISMA- WFF):
https://www.naisma.org/images/NAISMA_WFF_Standards.pdf http://www.naisma.org/images/Updated_NAISMA_WFF_Standards_DRAFT.pdf
EXHIBIT C:
Attachments:
• WhiteSage_PostFire_EmergencySeeding_ExhibitC_StateNoxiousWeedsSeedListUSDAFederalSeedAct.p df
• WhiteSage_PostFire_EmergencySeeding_ExhibitC_StateNoxiousWeedsSeedListUSDAFederalSeedActF
EDERAL_2025.pdf
• WhiteSage_PostFire_EmergencySeeding_ExhibitC_StateNoxiousWeedsSeedListUSDAFederalSeedActA
RIZONA.pdf
• WhiteSage_PostFire_EmergencySeeding_ExhibitC_StateNoxiousWeedsSeedListUSDAFederalSeedActU
TAH.pdf
EXHBIT D:
Intentionally Left Blank https://analyzeseeds.com/scst-member-directory/ https://agriculture.az.gov/about-us/divisions/agricultural-laboratory http://seedlab.colostate.edu/testing_info.html http://www.nmda.nmsu.edu/seed-lab/ https://www.naisma.org/images/NAISMA_WFF_Standards.pdf http://www.naisma.org/images/Updated_NAISMA_WFF_Standards_DRAFT.pdf
EXHIBIT E:
Intentionally Left Blank
| I. PERFORMANCE BASED WORK STATEMENT |
| A. PURPOSE |
| B. EQUIPMENT REQUIREMENTS |
| C. CONTRACTOR’S ENVIRONMENTAL RESPONSIBILITIES |
| D. SITE VISIT |
| E. LOCATION |
| F. SCOPE OF WORK |
| Item 0001 – native seeding processing, handling, and application |
| G. EXCLUSION/NON-WORK AREAS |
| H. OTHER SPECIFICATIONS |
| I. STAGING AREAS |
| J. CONTRACTOR-FURNISHED ITEMS/SERVICES |
| K. PROJECT SAFETY AND RESOURCE PROTECTION OBJECTIVES |
| L. REQUIRED DOCUMENTATION |
| M. ACCIDENT PREVENTION AND SAFETY |
| N. GOVERNMENT-FURNISHED PROPERTY |
| O. ANTICIPATED START DATE AND CONTRACT TIME |
| P. CAMPING |
| Q. KEY PERSONNEL |
| R. APPROVAL OF SUBCONTRACTORS |
| S. RESTRICTIONS ON WORK |
| T. FINAL CLEAN-UP |
| II. QUALITY ASSURANCE AND QUALITY CONTROL |
| A. CONTRACTOR’S QUALITY CONTROL (QC) |
| B. GOVERNMENT’ S QUALITY ASSURANCE (QA) |
| Compliance Inspections |
| Inspection for Acceptance and Payment |
| Disputed Inspection |
| Re-inspection after Rework |
| Final Inspection |
| A. Quality Assurance Plan (Qap) |
| B. Plot Or Point Sampling (Government Inspection Methods) |
| Acceptance |
| Inspection and Acceptance Requirements |
| EXHIBIT A: |
| Seed Testing Labs: Seed labs can be found at these websites: |
| 1. AOSA contact list for seed labs (https://analyzeseeds.com/scst-member-directory/) |
| 2. Arizona Agricultural Laboratory (https://agriculture.az.gov/about-us/divisions/agricultural-laboratory) |
| 3. Colorado Seed Laboratory (http://seedlab.colostate.edu/testing_info.html ) |
| 4. New Mexico State Seed Laboratory (http://www.nmda.nmsu.edu/seed-lab/ ) |
| EXHIBIT B: |
| EXHIBIT C: |
| EXHBIT D: |
| EXHIBIT E: |
File details come from the government source that posted it. Updated .