Attachment 4 cold springs foot trail.pdf

PDF 3 MB Posted

Attached to
GAOA Scenic Byway Recreation Site Hazard Tree Removal, Sierra National Forest, California
Solicitation number
127EAS25R0002
Issued by

About this file

The image depicts a narrow dirt trail winding through a forest of tall pine trees. The forest floor is covered with fallen branches and debris, likely a result of fire damage or forest clearing. Sunlight filters through the trees, creating a dappled light effect on the forest floor. The trail appears to be in a wooded area with significant undergrowth and fallen timber, suggesting a natural, somewhat rugged forest environment.

View the file

Other files

File Type Posted
Attachment 2 OSPR_MammothPool_2025Nest3_041525_JM.JPG JPG image
Attachment 3 2024 GAOA Byway Recreation Sites Vicinity Map DM_CH.pdf PDF
amd 1.pdf PDF
Attachment 4 GAOA Photos of missed work areas.zip ZIP file
Attachment 1 pre-bid tour questions 040825.rtf RTF text file
Attachment 16 Rock Creek Campground With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 2 teepee shaped burnpile.pdf PDF
Attachment 18 Texas Flat Group Camp Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 6 SNFaqSpp_RdMaintPresentation_20200715r (002).pdf PDF
Attachment 3 fireline and teepee pile.pdf PDF
Attachment 13 Kelty Meadow Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 17 Soda Springs Campground With 100ft Bufffer Separated 2024 DSM Final.pdf PDF
Attachment 20Wagners Campground Mammoth Pool Campground Mammoth Pool Boat Launch With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 19 Upper Chiquito Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 10 Cold Springs Vista_Rest Stop With 100ft Buffer Separated and Disposal Site 2024 DSM Final (002).pdf PDF
Attachment 14 Little Jackass Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 7 stelprdb5329557 (1).pdf PDF
Attachment 11 Granite Creek Campground 2024 DSM Final.pdf PDF
Attachment 8 WPTBrochure20240305_Final.pdf PDF
Attachment 9 Fish Creek Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
wage determination.txt TXT text file
Attachment 5 BUCAcardsGeneralTimber_20230826.pdf PDF
Attachment 1 2025 GAOA Fire Plan min.doc DOC document
Attachment 15 Placer and Sweetwater Campgrounds With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 12 Jackass Meadows Vista and Disposal Site 2024 DSM Final.pdf PDF
127EAS25Q0021final.pdf PDF
attachment 21 Description of Services.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .