Attachment 18 Texas Flat Group Camp Campground With 100ft Buffer Separated 2024 DSM Final.pdf

PDF 4 MB Posted

Attached to
GAOA Scenic Byway Recreation Site Hazard Tree Removal, Sierra National Forest, California
Solicitation number
127EAS25R0002
Issued by

About this file

This document is a detailed map for the 2024 Disaster and GAOA Byway Recreation Site Rehabilitation project located in the Bass Lake Ranger District of the Sierra National Forest, California. The map focuses on the Texas Flat Group Camp area, depicting geographic coordinates, work zones, road types, and stream classifications. The map includes a legend with color-coded designations for work areas, buffer zones, private property, and road accessibility, ranging from passenger car-suitable routes to high clearance vehicle paths.

The map specifies an acceptable operational period from July 1 through October 15, with a scale of 0.1 to 0.4 miles and geographic coordinates between 37°25'15"N to 37°25'48"N and 119°31'54"W to 119°33'4"W. The document notes that contract maps are estimated shapes and that unit boundaries will be defined on-site, with the Minarets weather station used to calculate the Potential Available Landscape (PAL). The map is dated 12/9/2024 and includes the U.S. Forest Service logo, indicating this is a planning document for a specific forest management and rehabilitation project.

View the file

Other files

File Type Posted
Attachment 2 OSPR_MammothPool_2025Nest3_041525_JM.JPG JPG image
Attachment 3 2024 GAOA Byway Recreation Sites Vicinity Map DM_CH.pdf PDF
amd 1.pdf PDF
Attachment 4 GAOA Photos of missed work areas.zip ZIP file
Attachment 1 pre-bid tour questions 040825.rtf RTF text file
Attachment 16 Rock Creek Campground With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 2 teepee shaped burnpile.pdf PDF
Attachment 6 SNFaqSpp_RdMaintPresentation_20200715r (002).pdf PDF
Attachment 3 fireline and teepee pile.pdf PDF
Attachment 13 Kelty Meadow Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 4 cold springs foot trail.pdf PDF
Attachment 17 Soda Springs Campground With 100ft Bufffer Separated 2024 DSM Final.pdf PDF
Attachment 20Wagners Campground Mammoth Pool Campground Mammoth Pool Boat Launch With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 19 Upper Chiquito Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 10 Cold Springs Vista_Rest Stop With 100ft Buffer Separated and Disposal Site 2024 DSM Final (002).pdf PDF
Attachment 14 Little Jackass Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 7 stelprdb5329557 (1).pdf PDF
Attachment 11 Granite Creek Campground 2024 DSM Final.pdf PDF
Attachment 8 WPTBrochure20240305_Final.pdf PDF
Attachment 9 Fish Creek Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
wage determination.txt TXT text file
Attachment 5 BUCAcardsGeneralTimber_20230826.pdf PDF
Attachment 1 2025 GAOA Fire Plan min.doc DOC document
Attachment 15 Placer and Sweetwater Campgrounds With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 12 Jackass Meadows Vista and Disposal Site 2024 DSM Final.pdf PDF
127EAS25Q0021final.pdf PDF
attachment 21 Description of Services.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10 11

06S038T1.46

06S038K

06S010A

06S036A

06S038T2.65

06S038J

06S038H

06S038T1.46

06S038T2.03

S0

G

S0

G T0

.0

06S036B

06S

S0

06S072A

S0

A

06S002XB

S0

F

06S010

S0

B

06S036

TEXAS FLAT

GROUP CAMP

°2

5'

°2 5'

°2

5'

°2 5'

-119°32'-119°32'20"-119°32'40"-119°33'

-119°32'-119°32'20"-119°32'40"-119°33'119°33'4"W

°2

5'

"N

119°31'54"W

°2 5'

"N

T.6S. T.6S.

R.22E.

R.22E.

1b Legend- Texas Flat Group Camp

Work Area

Buffer Area

Private Property

Roads

Suitable for Passanger Cars

Moderate Degree of User Comfort

Basic Custodial Care or Closed

High Clearance Vehicles

Not Maintained

Streams

Ephemeral

Intermittent

Perenneal Date Saved: 12/9/2024 12:48 PM D.S.M

2024 Disaster and GAOA Byway Recreation Site Rehabilitation Bass Lake Ranger District

Contract maps are estimated shapes. Unit boundaries will be defined on site. Weather station to calculate PAL: Minarets

0 0.2 0.40.1 Miles

Acceptable Operation Dates;

July 1 Through October 15.

dianamartin Stamp

File details come from the government source that posted it. Updated .