Attachment 3 fireline and teepee pile.pdf

PDF 3 MB Posted

Attached to
GAOA Scenic Byway Recreation Site Hazard Tree Removal, Sierra National Forest, California
Solicitation number
127EAS25R0002
Issued by

About this file

The image depicts a post-wildfire landscape showing a conical-shaped wood pile (teepee pile) composed of burned and damaged tree logs, situated in a forest with charred, standing dead trees in the background. The scene appears to be in a mountainous area with brown grasses, rocks, and remaining vegetation, suggesting an aftermath of a forest fire such as the 2020 Creek Fire mentioned in the associated federal contract opportunity details.

The image is an attachment to a pre-solicitation notice for a U.S. Forest Service contract (Solicitation 127EAS25R0002) for hazard tree removal at the Bass Lake Ranger District in Sierra National Forest, California. The project is exclusively for 100% small businesses, with an estimated budget between $500,000 and $1,000,000. The work involves removing hazard trees within campgrounds, boat launches, trails, and vistas, with a focus on the 2020 Creek Fire footprint. The scope includes creating burn piles like the one pictured, protecting environmental resources, and preparing sites for future infrastructure reconstruction. The solicitation is expected to be posted on SAM.gov on February 14, 2025, with NAICS Code 113310 (Forestry Logging).

View the file

Other files

File Type Posted
Attachment 2 OSPR_MammothPool_2025Nest3_041525_JM.JPG JPG image
Attachment 3 2024 GAOA Byway Recreation Sites Vicinity Map DM_CH.pdf PDF
amd 1.pdf PDF
Attachment 4 GAOA Photos of missed work areas.zip ZIP file
Attachment 1 pre-bid tour questions 040825.rtf RTF text file
Attachment 16 Rock Creek Campground With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 2 teepee shaped burnpile.pdf PDF
Attachment 18 Texas Flat Group Camp Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 6 SNFaqSpp_RdMaintPresentation_20200715r (002).pdf PDF
Attachment 13 Kelty Meadow Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 4 cold springs foot trail.pdf PDF
Attachment 17 Soda Springs Campground With 100ft Bufffer Separated 2024 DSM Final.pdf PDF
Attachment 20Wagners Campground Mammoth Pool Campground Mammoth Pool Boat Launch With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 19 Upper Chiquito Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 10 Cold Springs Vista_Rest Stop With 100ft Buffer Separated and Disposal Site 2024 DSM Final (002).pdf PDF
Attachment 14 Little Jackass Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 7 stelprdb5329557 (1).pdf PDF
Attachment 11 Granite Creek Campground 2024 DSM Final.pdf PDF
Attachment 8 WPTBrochure20240305_Final.pdf PDF
Attachment 9 Fish Creek Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
wage determination.txt TXT text file
Attachment 5 BUCAcardsGeneralTimber_20230826.pdf PDF
Attachment 1 2025 GAOA Fire Plan min.doc DOC document
Attachment 15 Placer and Sweetwater Campgrounds With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 12 Jackass Meadows Vista and Disposal Site 2024 DSM Final.pdf PDF
127EAS25Q0021final.pdf PDF
attachment 21 Description of Services.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .