Attachment 19 Upper Chiquito Campground With 100ft Buffer Separated 2024 DSM Final.pdf

PDF 3 MB Posted

Attached to
GAOA Scenic Byway Recreation Site Hazard Tree Removal, Sierra National Forest, California
Solicitation number
127EAS25R0002
Issued by

About this file

This image is a detailed topographical map for the 2024 Disaster and GAOA Byway Recreation Site Rehabilitation project located in the Bass Lake Ranger District. The map specifically focuses on the Upper Chiquito Campground area, providing geographic coordinates spanning latitude 37°29'40"N to 37°30'23"N and longitude -119°24'55"W to -119°24'20"W. The map includes a legend detailing buffer areas, work zones, road types, stream classifications, and site accessibility, with roads categorized from "Suitable for Passenger Cars" to "High Clearance Vehicles Not Maintained".

The map indicates acceptable operational dates for the project are from July 1 through February 28, with a note that contract map boundaries are estimated and will be definitively defined on-site. The weather station for calculating project parameters is located at Minarets. The map is part of a broader project involving recreation site rehabilitation within the Sierra National Forest, specifically targeting areas impacted by the 2020 Creek Fire, with precise delineation of work areas, stream paths, and topographical features using standard USFS mapping conventions.

View the file

Other files

File Type Posted
Attachment 2 OSPR_MammothPool_2025Nest3_041525_JM.JPG JPG image
Attachment 3 2024 GAOA Byway Recreation Sites Vicinity Map DM_CH.pdf PDF
amd 1.pdf PDF
Attachment 4 GAOA Photos of missed work areas.zip ZIP file
Attachment 1 pre-bid tour questions 040825.rtf RTF text file
Attachment 16 Rock Creek Campground With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 2 teepee shaped burnpile.pdf PDF
Attachment 18 Texas Flat Group Camp Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 6 SNFaqSpp_RdMaintPresentation_20200715r (002).pdf PDF
Attachment 3 fireline and teepee pile.pdf PDF
Attachment 13 Kelty Meadow Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 4 cold springs foot trail.pdf PDF
Attachment 17 Soda Springs Campground With 100ft Bufffer Separated 2024 DSM Final.pdf PDF
Attachment 20Wagners Campground Mammoth Pool Campground Mammoth Pool Boat Launch With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 10 Cold Springs Vista_Rest Stop With 100ft Buffer Separated and Disposal Site 2024 DSM Final (002).pdf PDF
Attachment 14 Little Jackass Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
Attachment 7 stelprdb5329557 (1).pdf PDF
Attachment 11 Granite Creek Campground 2024 DSM Final.pdf PDF
Attachment 8 WPTBrochure20240305_Final.pdf PDF
Attachment 9 Fish Creek Campground With 100ft Buffer Separated 2024 DSM Final.pdf PDF
wage determination.txt TXT text file
Attachment 5 BUCAcardsGeneralTimber_20230826.pdf PDF
Attachment 1 2025 GAOA Fire Plan min.doc DOC document
Attachment 15 Placer and Sweetwater Campgrounds With 100ft Buffers Separated 2024 DSM Final.pdf PDF
Attachment 12 Jackass Meadows Vista and Disposal Site 2024 DSM Final.pdf PDF
127EAS25Q0021final.pdf PDF
attachment 21 Description of Services.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05S004A

05S031A 05S031

S0

05S031

05S004B

S0

A

S0

B

S0

05S007

S0

AT

0.

05S007AT0.22

05S011

BE

AS

O

RE

RD

05S011T0.27

UPPER

CHIQUITO

CAMPGROUND

°3

0'

°3 0'

°2

9'

-119°24'20"-119°24'40"

-119°24'-119°24'20"-119°24'40"119°24'55"W

°2 9'

"N

119°24'W

°3

0'

"N

T.5S. T.5S.

R.23E.

R.23E.

1b Legend- Upper Chiquito CG

Buffer Area

Work Area

Restrooms

Signs

Roads

Suitable for Passanger Cars

Moderate Degree of User Comfort

Basic Custodial Care or Closed

High Clearance Vehicles

Not Maintained

Streams

Ephemeral

Intermittent

Perenneal

Date Saved: 11/26/2024 6:00 PM D.S.M

2024 Disaster and GAOA Byway Recreation Site Rehabilitation Bass Lake Ranger District

Contract maps are estimated shapes.

Unit boundaries will be defined on site.

Weather station to calculate PAL:

Minarets

0 0.15 0.30.07 Miles

Acceptable Operation Dates;

July 1 Through Febuary 28.

dianamartin Stamp

File details come from the government source that posted it. Updated .