Site Visit Notes and Sign-In Sheets.pdf
PDF 455 KB Posted
- Attached to
- National Forests and Grasslands in Texas Facilities Construction Federal contract opportunity
- Solicitation number
- 127DF520R0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Additional Q-A.pdf | ||
| Site Visit Schedule.pdf | ||
| Task Order 3 Package.pdf | ||
| Confined Spaces.pdf | ||
| Performance Relevancy.pdf | ||
| Task Order 1 Package.pdf | ||
| Financial Info.pdf | ||
| Task Order 4 Package.pdf | ||
| Task Order 2 Package.pdf | ||
| Solicitation 127DF520R0007.pdf | ||
| DBWD TX20200116.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ Pre-Bid Site Meeting Questions/Comments
General questions:
1. Are the Task Orders individually awarded or all task orders awarded in one package to the lowest overall proposal?
o Task orders will be individually awarded.
2. Will other facility projects be awarded out of this IDIQ/MATOC contract?
o Yes, future facilities construction projects will be competed among MATOC contractors for award of individual task orders.
3. Are the proposed task orders (1-4) given an individual period of performance? Or are all the task orders seen as one project? If so, how long are the individual task order period of performance(s)? Each has an individual period of performance:
o Task order #1, Caney Creek Amphitheater Demo – 45 days o Task order #2, Sam Houston Communication BLDG – 60 days o Task order #3, Supervisor’s Office Exterior Wood Fence – 30 days o Task order #4, Supervisor’s Office Warehouse Roof – 60 days
Task Order #1 Caney Creek Recreation Area - Amphitheater Decommission
Site Meeting on Wednesday, June 11, 2020 @ 2pm
1. Delete Weather station on Page 9. There is no weather station in the area of the amphitheater.
2. How far are the clearing limits from the amphitheater?
o The clearing limits include removing the water fountain and the asphalt walking path from the water fountain to the amphitheater.
3. Where is the sewer line and pump out location?
o No known sewer in the area of the amphitheater o That notation is in error and can be disregarded
4. Who is the power provider?
o Jasper-Newton Electrical Coop (Kirbyville, PH: 409-423-2241) o Contractor is responsible to coordinate with them for disconnect
5. What seed is to be used?
o See attached seeding schedule.
6. Backfill, dress, and seed all tire ruts and ground disturbance is required
Task Order #3 Supervisor’s Office – Wood Fence Repair and Paint
Site Meeting on Wednesday, June 11, 2020 @ 10am
1. Backfill, dress, and seed all tire ruts and ground disturbance is required
2. What boards must be replaced?
o All warped, rotten, or damaged boards shall be replaced o All boards (new and existing) shall be prepped, primed and painted (2 coats).
o Repair includes replacing broke and missing wood post caps
Task Order #4 Supervisor’s Office - Warehouse Roof Repair
Site Meeting on Wednesday, June 11, 2020 @ 10am
1. Deck board dimensions are 1-5/8” x 5-1/2” Wide T&G board
2. What seed is to be used?
o See attached seeding schedule.
3. Backfill, dress, and seed all tire ruts and ground disturbance is required
4. Add: Remove existing rain gutters and down spouts and replace in kind with new.
Task Order #2 Sam Houston Ranger District - Communication Building Repair
Site Meeting on Thursday, June 12, 2020 @ 10am
1. Add: Replace the existing access door and hardware. Reuse existing functional hardware.
2. Electrical can be shut off during construction through coordinated timing. This must be coordinated and kept to a minimum, preferably no more than 8 hours at a time.
3. Add: Replace missing or damaged wall insulation with R-13 Kraft faced fiberglass batt insulation
4. Backfill, dress, and seed all tire ruts and ground disturbance
5. Dismounting of any equipment must be approved and coordinated through the COR.
6. Reference the specifications (Section 073113, Asphalt Shingles) for roofing information
7. Delete: Vicinity maps on page 15, 16.
JANUARY-MAY and SEPTEMBER-DECEMBER JUNE-AUGUST
WHEAT 50 LBS BROWN MILLET 20 LBS
LITTLE BLUESTEM 2 LBS PEARL MILLET 20 LBS
"OK SELECT", "COASTAL PLAINS", OR "CATAHOULA"
PARTRIDGE PEA 2 LBS (Innoculated)
"COMMANCHE" OR "LARK"
INDIANGRASS 1 LBS
"CHEYENNE" OR "LOMETA"
SAND LOVEGRASS 0.5 LBS
"MASON"
ASHE SUNFLOWER 1 LBS
"CAJUN SUNRISE"
SWITCHGRASS 0.5 LBS
"BLACKWELL"
SPOTTED BEE BALM 1 LBS
LANCELEAF COREOPSIS 1 LBS
INDIAN BLANKET 1 LBS
Spotted bee balm is Monarda punctata. Can also substitute lemon bee balm-Monarda citriodora
Bamert Seed
1897 County Road 1018
Muleshoe, TX 79347
1-800-262-9892
Turner Seed
210 County Road 151
Breckenridge, TX 76424
1-800-722-8616
Roundstone Native Seed Co.
9764 Raider Hollow Rd.
Upton, Ky. 42784
1-888-531-2323
Douglass King Seed Co.
4627 Emil St.
San Antonio, TX 78219
1-210-661-4191
Indian Blanket is Gaillardia pulchella
Lanceleaf Coreopsis is Coreopsis lanceolata
WHEAT is Triticum aestivum
Use bales of pine straw instead of baled hay for use in wing ditches and water bars.
Mulch:1-1/2 to 2-1/2 tons of mulch applied to a depth of 1-3 inches (If bare soil).
Fertilizer: Fertilization rates will be set at 100 LBS/acre of 12-12-12
Project areas containing greater than 3% slope will require site specific analysis.
CERTIFIED VENDORS
For substitutions or technical guidance: Thomas Philipps, Forest Botanist- US Forest Service Phone: 936-639-
8514 Email: thomas.philipps@usda.gov
General notes:
Seeding rates are pure live seed (PLS) per acre
Special Instructions:
Ashe sunflower is Helianthus mollis
Sand Lovegrass is Eragrostis trichodes
| Pre Bid Questions_UPDATED June 17.pdf |
| NFGTX SEED MIX_New 2020.pdf |
| Sign In Sheet_Task 2 Comm BLDG.pdf |
| Sign In_Tasks 1 4 3.pdf |
File details come from the government source that posted it. Updated .