RFIs and Responses 2.docx
DOCX document 26 KB Posted
- Attached to
- Install High-Game Fencing, Cameron County, TX
- Solicitation number
- 12639525R0007
About this file
This document contains Request for Information (RFI) responses for Solicitation 12639525R0007, a high-game fencing project in Cameron County, Texas for the U.S. Department of Agriculture's Animal and Plant Health Inspection Service (APHIS). The project involves installing approximately 20 miles of 8-foot high-game fencing on private and U.S. Fish and Wildlife Service refuge property to prevent cattle fever tick transmission by controlling wildlife movement. The solicitation is set aside exclusively for service-disabled veteran-owned small business firms, with an estimated project value between $1,000,000 and $5,000,000.
The RFIs address critical project details including gate quantities, security requirements, landowner fence removal, underground utility verification, fencing installation specifications, bonding requirements, and personnel qualifications. Key clarifications include: contractors are responsible for utility location verification, fencing must be installed to the ground, payment and performance bonds are required, and one individual can serve multiple roles including Quality Control Manager, Site Safety and Health Officer, and Superintendent. The project aims to decrease white-tailed deer and nilgai antelope movement in targeted areas and contains cattle within systematic treatment zones outside the Permanent Quarantine Zone.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639525R0007-0003.pdf | ||
| 12639525R0007-0002.pdf | ||
| RFIs and Responses 3.docx | DOCX document | |
| RFIs and Responses.docx | DOCX document | |
| Fence Meeting 3.25.25 Sign In Sheet.pdf | ||
| 12639525R0007-0001.pdf | ||
| 12639525R0007.pdf | ||
| Atch 3_GPS Workbook FY 25.xlsx | XLSX spreadsheet | |
| Atch 2_CCDD 1 Map.jpg | JPG image | |
| Atch 4_Federal Construction Wage Rates_Cameron County.pdf | ||
| Atch 1_Phase 3 Statement of Work_HG Fence Cameron County.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFIs, 12639525R0007, High Game Fence
RFI #1 – Gate Quantities and Variations Can you confirm the total number of gates required for this project?
RFI #2 – Clarification on Security Requirements Can you confirm whether 24/7 security is required for this project, or if the language in the Scope of Work referencing security can be disregarded?
Equipment may be left unsecured at contractor’s/owner’s risk.
RFI #3 – Landowner Fence Removal and Material Staging Will the removal and staging of existing landowner fencing be treated as a change order, and how should unknown quantities be tracked and billed?
All existing landowner fencing should be treated as removal and disposal. If landowner wants to keep, we will address at that point and stage on the landowner’s property.
RFI #4 – Underground Utility Verification Has a utility locate already been performed, or is it the contractor’s responsibility to verify the presence and location of underground utilities before beginning work?
It is the contractor’s responsibility to verify the presence of underground utilities prior to digging.
RFI #5 – Fence Wire Installation Height Can you confirm that fencing wire should be installed all the way to the ground across all areas, even if this contradicts instructions in the Scope of Work?
Fencing shall be installed all the way to the ground across all areas.
RFI#6 - Bonding We noticed there is no bid bond requirement. Will the awarded firm need to provide payment and performance bonds?
Yes RFI #7 – Total Number of Fence Corners Can you provide the total number of corners that will be constructed in this project, or a map showing their locations? This will greatly impact the pricing.
Contractors can use Google Earth to look up coordinates of fence perimeter to get an estimate on total corners and direction changes.
RFI #8 – Subsurface Rock or Soil Conditions Are there known areas along the project route with underground rock or other soil conditions that could affect post installation?
No known areas at this time.
RFI #9 – Project Personnel Can one individual employed by the general contractor serve simultaneously as the Quality Control Manager (QCM), Site Safety and Health Officer (SSHO), and Superintendent?
Yes