1256A119Q0013_Additional_QA.docx
DOCX document 13 KB Posted
- Attached to
- Pre-Demolition Abatement on the Midewin NTP
- Solicitation number
- 1256A119Q0013
About this file
Q&A. this posting is for your information and does not need to be acknowledged with your offer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_NotesDemo_Groups_8_9_64_ACM.docx | DOCX document | |
| site_visit_attendees_Midewin_Abatement.pdf | ||
| Amendment_1.rtf | RTF text file | |
| Att_D_Scope_of_Work_Groups_8-9-64_Abatement.doc | DOC document | |
| Att_A_Midewin_2019_Abatement_Locations.jpg | JPG image | |
| Att_B_Group_Layout_Maps.pdf | ||
| Att_E_Wage_Determination.pdf | ||
| Photo_typical_interior_Groups_8-9_floor_tile_and_lights.JPG | JPG image | |
| Photo_typical_Group_64_WH.JPG | JPG image | |
| Photo_Building_ID_number_8-11.JPG | JPG image | |
| Att_C_asbestos-form-combined.pdf | ||
| Photo_typical_cross_section_of_Walkway.jpg | JPG image | |
| 1256A119Q0013_CombinedSynopsisSolicitation_abatement.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1256A119Q0013 8/21/2019 Pre-demo abatement Midewin NTP Additional QA:
Is the contractor required to perform an asbestos survey of each structure? Or test for acm any suspicious materials that may be revealed during the abatement process? This is addressed in the scope of work (Att D). Group 8 & 9 buildings need the inspection. Group 64 buildings do not. This will be prior to any abatement work taking place Is an independent monitoring contractor to be utilized? And, who pays for this service? If your removal process is such that State of Illinois EPA requires monitoring for air quality then the contractor shall provide and include monitoring in their costs. Monitoring may be accomplished with either an independent consultant or the contractors own forces as long as it meet state requirements. Midewin will not be performing any monitoring.
What is the anticipated construction schedule? See Section 3.4.B in ATT D Scope of Work document.
Is a bid bond required with the bid? NO Are only the unit bid prices as shown on pages on 14, 15,16 in the bid document to be included in the returned bid package? Yes these pricing pages need filled out. The detail schedules for lines 2-4 will have their totals placed into the summary schedule of items. The prices on the detailed schedules will be lump sum prices representing the total cost for the item. For example for building 8-1 you need to price out how much it will cost in total to remove the misc debris, how much in total is will cost to remove the transite. Those two items will be totaled in the last column of the schedule for building 8-1.
Are pages 17 through 34 to be included in the bid too along with the unit price schedule? Yes but if you’ve completed your online reps and certs in SAM, you only need to include pages 17-21. Amendment 1 also needs to be acknowledged with your offer by submitting a signed copy of the SF-30.
Is it possible to obtain copies of the previous asbestos survey reports in order to eliminate those items that have been sampled and found to be non-asbestos containing? Reports are not available at this time.
These questions are provided for your information and don’t constitute and do not need to be acknowledged with your offer.