This document is an amendment to Solicitation 12505B24Q0186 for the Update of the East Elevator in the DFRU Building located at USDA-ARS-DFRC in Madison, WI. The amendment changes the offer submission date from June 28, 2024 to July 5, 2024, and extends the period of performance from 200 days to 300 days after the notice to proceed. The amendment also includes Questions and Answers received as of June 19, 2024, which provide clarification on the contractor's responsibilities for electrical and fire alarm work, as well as the replacement of door hangers and tracks. The solicitation is a 100% Small Business Set-Aside with an estimated magnitude of construction between $100,000 and $250,000. Site visits are scheduled for June 11 and 12, 2024, and all questions must be submitted by June 18, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12505B24Q0186 - 0002 with Q-A.pdf | ||
| 01. SF 1442 12505B24Q0186.pdf | ||
| 03. WD WI20240005 04-12-2024.pdf | ||
| 05. ARS-371.pdf | ||
| 02. East Elevator Replacement DFRU -SOW.pdf | ||
| 04. Material Submittal Form.pdf | ||
| 07. Past Performance Questionnaire.pdf | ||
| 06. ARS-372.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12505B24Q0186 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12505B
PEORIA IL 61604
1815 N UNIVERSITY STREET
USDA ARS MWA AAO ACQ/PER PROP
06/03/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/03/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Offer submission date changed from: 1400 CT, 06/28/2024; changed to: 1400 CT, 07/05/2024.
Period of Performance changed from: 200 days after NTP; changed to: 300 days after NTP.
Add Questions and Answers received as of 19 June 2024.
Period of Performance: 07/15/2024 to 05/14/2025
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ZACHARY E. SCHULER
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Questions and Answers – 125B24Q0186 Update East DFRU Elevator
Q1:
A1:
Q2:
Will unrelated elevator work, such as electrical or fire signal control be the responsibility of the GC or will the USDA complete this work?
Contractor is required to perform all necessary electrical work to the extent of connecting the new controller and power unit, emergency light and any other electrical parts up to the power switch. Fire alarm work is proprietary and will be serviced by a different vendor.
In the ‘Scope of Work’ section of the solicitation under Door Equipment on page 7, the scope calls for car and hoistway door hangers and tracks to be replaced. Given the door track is integral to the header (non-detachable) the complete door header on each landing would need to be replaced. Can you confirm if the contractor awarded would be expected to replace the complete header on each floor, or can the hoistway door hangars and tracks be retained?
A2: The contractor is not expected to replace the hoistway door hangers and tracks. The hoistway door hangars and door tracks shall be retained.
Q3: Is there consideration in extending the duration of the project further than 200 days from the notice of award to substantial completion? The provided window is very tight for survey, submittals, procurement, and installation.
A3:
Q4:
A4:
The period of performance can be extended from 200 to 300 days from Notice to Proceed NTP.
Is it possible to extend the offer due date for one week? (currently due 6/28/2024)
Yes, the due date has been extended to 7/5/2024.