RFIs v.2.pdf

PDF 83 KB Posted

Attached to
Roof Replacement Federal contract opportunity
Solicitation number
12505B23R0003
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

About this file

This document contains a solicitation for roof replacement services and requests for information from potential offerors. The United States Department of Agriculture Agricultural Research Service is seeking to replace the roof of Building 8 at its North Central Soil Conservation Research Laboratory in Morris, Minnesota through solicitation number 12505B23R0003. The requirement is set aside for small businesses with a size standard of $19 million or less. The period of performance is 150 calendar days from notice to proceed, and the magnitude of construction is estimated between $250,000 and $500,000. Bonds are required, and site visits are scheduled for May 3rd and 4th with registration due by May 2nd. Questions about the solicitation are due by May 11th. Interested parties must register in SAM and monitor the website for amendments. Biobased products are required where reasonably available and priced.

View the file

Other files for this federal contract opportunity

Other files attached to Roof Replacement, newest first.
File Type Posted
SF-30 - Amendment 03.pdf PDF
Site Visit Sign In 06012023.pdf PDF
SF-30 - Amendment 02.pdf PDF
Statement of Work - Revised 05232023.pdf PDF
SF-30 - Amendment 01.pdf PDF
Site Visit Sign In 05032023.pdf PDF
RFIs.pdf PDF
SF-1442.pdf PDF
ARS-372.pdf PDF
Statement of Work.pdf PDF
Existing Drawings.pdf PDF
Past Performance Questionnaire.pdf PDF
Wage Determination.pdf PDF
ARS-371.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requests for Information Solicitation 12505B23R0003

Question 1: On the SF1442, the Period of Performance is 150 days and reads 06/26/23 to 11/23/23. If the project can be completed yet this construction season, will the award of this contract be expedited?

Answer 1: The period of performance will be adjusted based on the award date of the contract.

Question 2: There are a number of adhesives that are extremely weather/temperature dependent. If the award takes the full 60 days after the 6/29/23 due date, we may not be able to complete the project this construction season. Will a Period of Performance modification be considered, if deemed necessary?

Answer 2: Yes.

Question 3: Are any roof pavers desired for this project? If so, where would they be wanted, i.e. from roof entrance to HVAC units, etc.?

Answer 3: Please see Section 07 53 23 of Project Specifications (paragraph “2.8 Walkways” and “3.9 Installation of Walkways”) for the requirements on walkways / roof pavers.