FMS Fuel/Oil Tanks Demolition Project Photos Descriptions below are only summary and are not the Statement of Work. Refer to contract.

1. Edgefield Work Center:

a. Remove Two aboveground storage tanks connected to a now defunct fueling island in addition to a free-standing tank. (3 fuel tanks (1-2000 gal., 1-550 gal., 1-525 gal.), fuel island)

b. Remove UST vent pipe behind gashouse.

c. Solid waste/recyclable materials to remove: up to 2000 lbs of metal/bulky waste materials.

d. Pole barn floor hoist: 1) Remove the suspected 50-gallons of hydraulic oil in the underground tank by pumping. 2) Dispose of the oil (for concentration greater than 50 ppm, dispose by approved incineration); and 3) Dispose of hydraulic oil-containing components (filters, etc.).

3 tanks

UST vent pipe fuel island

2. Enoree Ranger District:

a. Remove three aboveground storage tanks the connected fueling island

i. Blow out all underground fuel lines and permanently cap lines below ground.

ii. For fuel island, remove the pump and associated structure.