Attachment_2_A_Statement_of_Work.pdf

PDF 237 KB Posted

Attached to
Construction IDIQ Federal contract opportunity
Solicitation number
12467018R0010
Issued by
Department of Agriculture Forest Service R8-Southern Region

About this file

Attachment 2A Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Construction IDIQ, newest first.
File Type Posted
scan0068.pdf PDF
Attachment_1__A_Statement_of_work.doc DOC document
Attachment_3_Experience_Questionnaire.docx DOCX document
Attachment_2_Schedule_of_Items.xlsx XLSX spreadsheet
Attachment_1_C_DOL_WAGE_RATES.pdf PDF
RFP_12467018R0010.pdf PDF
Attachment_1_B_Drawings.pdf PDF
Attachment_1___Schedule_of_Items.xlsx XLSX spreadsheet
Attachment_2_C_DOL_WAGE_RATES.pdf PDF
Attachment_2_B_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

FOR

THUNDER ROCK BATH HOUSE

ROOF REPLACEMENT

CHEROKEE NATIONAL FOREST

POLK COUNTY, TENNESSEE

MARCH 2018

CHEROKEE NATIONAL FOREST

TECHNICAL SERVICES GROUP

USDA-FOREST SERVICE

2800 NORTH OCOEE STREET

CLEVELAND, TN 37312

SPECIFICATION INDEX

01010 - SUMMARY OF WORK

01300 - ADMINISTRATIVE REQUIREMENTS

01401 - QUALITY CONTROL AND QUANTITY MEASUREMENT

01500 - TEMPORARY FACILITIES

06100 - ROUGH CARPENTRY

06200 - FINISH CARPENTRY

07610 - SHEET METAL ROOFING

07631 - SHEET METAL FLASHING

08625 - TUBULAR DAYLIGHTING DEVICE

09911 - PAINTING

16010 - BASIC ELECTRICAL REQUIREMENTS

SECTION 01010

SUMMARY OF WORK

A. Work to be performed:

1. Replace Standing Seam Metal Roof

a. Remove and dispose existing roof materials legally off government land

b. Recycle metal roof panels

2. Install 14 inch Tubular Daylighting Device

3. Decking, Framing, and Trim Repairs

a. Repair rotten, broken, or otherwise damaged members

b. Includes Carpenter Bee Damage

4. Paint/Stain Ceiling and Repaired Elements

B. Work by Others

N/A

D. Work Sequence

1. The construction activities shall be confined to construction limits as defined by the COR

2. Contractor shall complete all work at one site before starting at another site when awarded multiple projects unless approved by CO

3. Sequence construction activities to minimize ground disturbance and impact on the recreating public

4. The work sequence will be clearly defined by the contractor’s progress schedule

01300-1

SECTION 01300

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Construction progress schedule.

B. Submittals for review, information, and project closeout.

C. Number of copies of submittals.

D. Submittal procedures.

1.2 PROJECT COORDINATION

A. During construction, coordinate use of site and facilities through the COR.

B. Coordinate field engineering and layout work under instructions of the COR.

C. Make the following types of submittals to the COR:

1. Requests for interpretation.

2. Requests for substitution.

3. Shop drawings, product data, and samples.

4. Test and inspection reports.

5. Manufacturer's instructions and field reports.

6. Applications for payment and change order requests.

7. Progress schedules.

8. Coordination drawings.

9. Closeout submittals.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.1 CONSTRUCTION PROGRESS SCHEDULE

A. If preliminary schedule requires revision after review, submit revised schedule within 10 days.

B. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.

1. Include written certification that major contractors have reviewed and accepted proposed schedule.

C. Within 10 days after joint review, submit complete schedule.

D. Submit updated schedule with each Application for Payment.

3.2 SUBMITTALS FOR REVIEW

A. When the following are specified in individual sections, submit them for review:

1. Product data.

2. Shop drawings.

3. Samples for selection.

4. Samples for verification.

B. Submit to COR for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.

C. Samples will be reviewed only for aesthetic, color, or finish selection.

01300-2

D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below.

3.3 SUBMITTALS FOR INFORMATION

A. When the following are specified in individual sections, submit them for information:

1. Design data.

2. Certificates.

3. Test reports.

4. Inspection reports.

5. Manufacturer's instructions.

6. Manufacturer's field reports.

7. Other types indicated.

3.4 SUBMITTALS FOR PROJECT CLOSEOUT

A. When the following are specified in individual sections, submit them at project closeout:

1. Project record documents.

2. Operation and maintenance data.

3. Warranties.

4. Other types as indicated.

B. Submit for U.S. Forest Service's benefit during and after project completion.

3.5 NUMBER OF COPIES OF SUBMITTALS

A. Documents for Review:

1. Small Size Sheets, Not Larger than 8-1/2 x 11 inches: Submit the number of copies which the

Contractor requires, plus two copies which will be retained by the COR.

2. Larger Sheets, Not Larger than 24 x 36 inches: Submit the number of opaque reproductions which

Contractor requires, plus two copies which will be retained by COR.

B. Documents for Information: Submit two copies.

3.6 SUBMITTAL PROCEDURES

A. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number, and specification section number, as appropriate on each copy.

B. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Work and Contract Documents.

C. Deliver submittals to COR at business address.

D. Schedule submittals to expedite the Project, and coordinate submission of related items.

E. For each submittal for review, allow 15 days excluding delivery time to and from the COR.

F. Identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of the completed Work.

G. Provide space for Contractor and COR review stamps.

H. When revised for resubmission, identify all changes made since previous submission.

I. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.

END OF SECTION

SECTION 01401

QUALITY CONTROL & QUANTITY MEASUREMENT

PART 1 - GENERAL

1.1. Work

1.1.1. This work shall consist of providing quality control in conformance with the Inspection of

Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.

1.2. Method of Measurement

A. Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered as included in the payment of items shown.

B. All pay items listed in the SCHEDULE OF ITEMS for this contract will be determined by the Actual Quantity (AQ). Design Quantities (DQ), and Lump Sum Quantities (LSQ) method of measurements.

C. ACTUAL QUANTITIES (AQ): These quantities are determined from measurements of completed work.

D. DESIGNED QUANTITIES (DQ): These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon original design data available prior to advertising the project. This data includes the preliminary survey information, drawings design assumptions, calculations and the presentation in the contract. Authorization for changes in the number of units SHOWN in the contract may be given under any of the following conditions:

1. As a result of changes in the work authorized by the Contracting Officer.

2. As a result of the Contracting Officer determining that errors exist in the original design that may cause a Pay Item quantity to change by 15% or more.

3. As a result of the Contractor submitting a written request showing evidence of errors in the original design that cause a Pay Item quantity to change by 15% or more. The evidence must be verifiable and consist of calculations, drawings and/or other data that shows how the designed quantity is believed to be in error.

E. LUMP SUM QUANTITIES (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

They will not be measured.

PART 2 - PRODUCTS

None

PART 3 - EXECUTION

3.1. Quality Control & Quantity Measurement System

3.1.1 The contractor shall provide and maintain a quality control system that will ensure that all services, supplies, and construction required under this contract conform to the contract requirements. The contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all supplies, services, and construction conform to the contract requirements.

3.1.2 The contractor shall also perform, or cause to be performed, all measurement of quantities of materials incorporated into the work or work processes that are to be measured under the provisions of the contract.

3.1.2.1(a) Quality Control Plan. The contractor shall submit in writing the following:

3.1.2.1.1 (1) Authorities and responsibilities of inspection and testing personnel, and supervisors over construction work.

3.1.2.1.2 (2) Experience and qualifications of inspection and testing personnel to be assigned and name and location of any (for hire) testing facility to be used.

3.1.2.2(b) Approval of Quality Control Plan. The contractor's proposed quality control plan for all items requiring quality control shall be submitted to the COR for review prior to the contractor commencing work. Within 5 days of receipt of plan, the COR shall notify the contractor whether the plan adequately covers quality control requirements. Construction work shall not be performed prior to contractor's receipt of written approval of the proposed plan. The contractor shall submit to the COR, in writing, any proposed changes in the approved quality control plan. Proposed changes shall not be put into effect until approved in writing by the COR.

3.2. Sampling, Testing, Inspection, & Measurement of Quantities

3.2.1 The contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications shall be made as required by the drawings and specifications. The contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite. Sampling and testing frequency for specific items shall be shown in the specifications.

3.3. Records of Inspection, Tests, & Measurement

3.3.1(a) Inspection and Tests. The contractor shall maintain current records of all inspections and tests performed. The following format or one containing the following information will be acceptable to the Government:

(Take concrete placement as an example)

Placement Description ___________ Contract No. _____________

Test By:

Bid Item No. Test Date Exact Location Standard Results (Initials)

3.3.1.1 The contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.

3.3.2(b) As-built Drawings. The contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the COR.

3.4. Certifications & Measurements

3.4.1(a) Offsite Produced Materials. The contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements shown on the drawings or stated in the specifications. Incidental purchases needed to remedy minor shortages of material shall be certified by the contractor.

SECTION 01500

TEMPORARY FACILITIES

A. General

This work includes temporary facilities, utilities and other related items necessary to complete the project indicated by the contract documents.

1. Electricity is available at the site in limited locations.

2. Potable water is available at the site during recreation season.

3. Contractor may use Forest Service toilet facilities at no charge.

B. Maintenance for Traffic

The Contractor shall safely maintain traffic control at the site as necessary to protect the public and the contractor’s workers.

C. Erosion Control

N/A

D. Hazard Markers

The contractor shall provide, install, and maintain the necessary hazard markers, barricades, signs, or lights that will adequately delineate the construction area and keep traffic out of the construction area.

E. Clean Up

1. Remove all temporary work when the need for its use has ceased.

2. Clean spaces that were occupied by temporary work and restore to conditions equal to or better than existed prior to construction.

06100-1

SECTION 06100

ROUGH CARPENTRY

A. Section includes:

1. Wall sheathing

2. Roof sheathing or decking

3. Framing members

4. Blocking and supports

1.2 REFERENCES

A. AFPA T10 - Wood Frame Construction Manual; American Forest and Paper Association; 2001.

B. ASTM A 153/A 153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware;

2003.

C. AWPA U1 - Use Category System: User Specification for Treated Wood; American Wood-Preservers' Association; 2004.

D. PS 20 - American Softwood Lumber Standard; National Institute of Standards and Technology (Department of Commerce); 1999.

E. International Building Code, ICC IBC 2009 or later

1.3 QUALITY ASSURANCE

A. Lumber: Comply with PS 20 and approved grading rules and inspection agencies.

PART 2 PRODUCTS

2.1 DIMENSION LUMBER

A. Sizes: Nominal sizes as indicated on drawings, S4S.

B. Moisture Content: S-dry or MC19.

2.2 CONSTRUCTION PANELS

A. APA Rated Wall Sheathing: Exposure 1, and as follows:

1. Structural I.

2. Span Rating: 24/0 (610/0).

3. Thickness: ½ inch (13 mm), unless otherwise noted on drawings.

B. Roof Sheathing: APA PRP-108/APA PRPR-108, Form B455, Exterior Exposure Class, and as follows:

1. Structural I.

2. Span Rating: 24/0 (610/0).

3. Thickness: ½ inch (13 mm), unless otherwise noted on drawings.

C. Roof Decking: Tongue and Groove (T&G) 3x6 southern yellow pine:

1. Width: 6 inch (150 mm)

2. Thickness: 3 inch (75 mm)

2.3 ACCESSORIES

A. Fasteners and Anchors:

1. Metal and Finish: Hot-dipped galvanized steel per ASTM A 153/A 153M for high humidity and preservative-treated wood locations, unfinished steel elsewhere.

06100-2

2.4 FACTORY WOOD TREATMENT

A. Treated Lumber and Plywood: Comply with requirements of AWPA U1 - Use Category System for wood treatments determined by use categories, expected service conditions, and specific applications.

PART 3 EXECUTION

3.1 FRAMING INSTALLATION

A. Set structural members level, plumb, and true to line. Discard pieces with defects that would lower required strength or result in unacceptable appearance of exposed members.

B. Make provisions for temporary construction loads, and provide temporary bracing sufficient to maintain structure in true alignment and safe condition until completion of erection and installation of permanent bracing.

C. Install structural members full length without splices unless otherwise specifically detailed.

D. Comply with member sizes, spacing, and configurations indicated, and fastener size and spacing indicated, but not less than required by applicable codes and AFPA Wood Frame Construction Manual.

E. Frame openings with two or more studs at each jamb; support headers on cripple studs.

F. Provide miscellaneous members as indicated or as required to support finishes, fixtures, specialty items, and trim.

3.2 INSTALLATION OF CONSTRUCTION PANELS

A. Wall Sheathing: Secure with long dimension parallel to wall studs, with ends over firm bearing, using nails.

B. Roof Sheathing: Secure panels with long dimension perpendicular to framing members, with ends staggered and over firm bearing.

3.3 REPAIR

A. Remove rotten, broken, or otherwise damaged members

B. Provide temporary support as needed

C. Cut members or material on a neat line beyond damaged areas

D. Lap members 36” minimum when splicing

E. Use fasteners and fastener spacing required by IBC

F. For Carpenter Bee Damage:

a. Fill bore holes with backer rod within ½” or less of surface. Fill remaining ¼” to ½” with dark brown caulk, putty, or sealant approved for wood or,

b. Replace damaged member

06200-1

SECTION 06200

FINISH CARPENTRY

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Interior wood casings.

2. Exterior standing and running trim.

1.2 SUBMITTALS

A. Product Data: For each type of process and factory-fabricated product.

B. Samples: For each type of siding indicated.

1.3 DELIVERY, STORAGE, AND HANDLING

A. Protect work from moisture damage.

PART 2 - PRODUCTS

2.1 MATERIALS, GENERAL

A. Unless otherwise indicated, provide products of quality specified by AWI Architectural Woodwork Quality Standards Illustrated for Custom grade.

B. Lumber: DOC PS 20 and applicable grading rules of inspection agencies certified by ALSC's Board of Review.

2.2 WOOD-PRESERVATIVE-TREATED MATERIALS

A. Preservative Treatment by Pressure Process:

1. Lumber: AWPA C2. Kiln dry after treatment to a maximum moisture content of 19 percent.

2. Plywood: AWPA C9. Kiln dry after treatment to a maximum moisture content of 18 percent.

3. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no arsenic or chromium.

4. Application: Where indicated.

2.3 INTERIOR STANDING AND RUNNING TRIM

A. Softwood Lumber: Pine or poplar species, plain sawn, maximum moisture content of 6 percent; for opaque paint finish.

B. Dimensions: As indicated on drawings.

2.4 EXTERIOR STANDING AND RUNNING TRIM

A. Non-asbestos fiber-cement trim complying with ASTM Std. Spec C1186, Grade II - Type A.

B. Texture: Smooth.

C. Dimensions: Thickness ¾” Length and width: see drawings

2.5 MISCELLANEOUS MATERIALS

A. Fasteners for Finish Carpentry: Provide nails or screws, in sufficient length to penetrate not less than 1- 1/2 inches into wood substrate.

06200-2

B. Sealants: Latex, complying with ASTM C 834, Type P, Grade NF and with applicable requirements in Section 07920 "Joint Sealants"; recommended by sealant manufacturer and manufacturer of substrates for intended application.

PART 3 - EXECUTION

3.1 PREPARATION

A. Prime lumber to be painted, including both faces and edges. Cut to required lengths and prime ends.

Comply with requirements in Section 09911 " Painting."

3.2 INSTALLATION, GENERAL

A. Set and secure materials and components in place, plumb and level.

B. Carefully scribe work abutting other components, with maximum gaps of 1/32 inch (1 mm). Do not use additional overlay trim to conceal larger gaps.

C. Install finish carpentry level and aligned with adjacent materials. Use concealed shims where necessary for alignment.

1. Scribe and cut exterior finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer.

3.3 INTERIOR STANDING AND RUNNING TRIM INSTALLATION

A. Install flat grain lumber with bark side exposed to weather.

B. Install trim with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Do not use pieces less than 24 inches long except where necessary.

1. Use scarf joints for end-to-end joints.

3.4 EXTERIOR STANDING AND RUNNING TRIM INSTALLATION

A. Install flat grain lumber with bark side exposed to weather.

B. Install trim with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Do not use pieces less than 24 inches long except where necessary.

1. Use scarf joints for end-to-end joints.

2. Stagger end joints in adjacent and related members.

C. Fit exterior joints to exclude water. Cope at returns and miter at corners.

3.5 TOLERANCES

A. Maximum Variation from True Position: 1/16 inch (1.5 mm).

B. Maximum Offset from True Alignment with Abutting Materials: 1/32 inch (0.7 mm).

07610-1

SECTION 07610

SHEET METAL ROOFING

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Prefinished standing-seam metal roofing

1.2 RELATED SECTIONS

1. Section 07631 “Sheet Metal Flashing and Trim.”

1.3 PERFORMANCE REQUIREMENTS

A. Wind-Uplift Resistance: Capable of producing sheet metal roofing assemblies that comply with UL 580 for Class 90 wind-uplift resistance.

1. Maintain UL certification of portable roll-forming equipment for duration of sheet metal roofing work.

1.4 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: Show layouts of sheet metal roofing, including plans, elevations, and keyed references to termination points.

1. Include details for forming, joining, and securing sheet metal roofing, including pattern of seams, termination points, expansion joints, roof penetrations, edge conditions, special conditions, connections to adjoining work, and accessory items.

C. In Lieu of Shop Drawings: Provide material list detailing metal roofing assembly complete with all accessories and manufacture’s standard installation drawings.

D. Samples: For each exposed finish.

E. Roll-Forming Equipment Certificate: Issued by UL.

F. Product test reports.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: Fabricator of sheet metal roofing.

B. Custom-Fabricated Sheet Metal Roofing Fabricator Qualifications: Shop that employs skilled workers who custom-fabricate sheet metal roofing.

C. Roll-Formed Sheet Metal Roofing Fabricator Qualifications: An authorized representative of roll-formed sheet metal roofing manufacturer for fabrication and installation of units.

D. Sheet Metal Roofing Standard: Comply with SMACNA's "Architectural Sheet Metal Manual."

E. Preinstallation Conference: Conduct conference at Project site.

1.6 WARRANTY

A. Special Warranty on Finishes: Manufacturer's standard form in which manufacturer agrees to repair finish or replace sheet metal roofing that shows evidence of deterioration of factory-applied finishes within specified warranty period.

1. Fluoropolymer Finish Warranty Period: 20 years from date of Substantial Completion.

B. Special Installer's Warranty: Specified form in which Roofing Installer agrees to repair or replace components of custom-fabricated sheet metal roofing that fail in materials or workmanship within two years from date of Substantial Completion.

07610-2

PART 2 - PRODUCTS

2.1 ROOFING SHEET METALS

A. Prefinished Metal shall be Hot-Dipped Galvanized ASTM A792-10

1. Finish: 70% Kynar 500 / Hylar 5000

2. Profile: 1.75” Seam Height, 18” wide coverage with two stiffening ribs

3. Color: Mansard Brown

4. Steel: 24 gage Galvalume

5. Exposed Finishes:

a. Finish shall be Kynar 500 Fluoropolymer coating, applied by the manufacturer on a continuous coil coating line, with a top side dry film thickness of 0.70 to 0.90 mil over 0.20 to 0.30 mil prime coat, to provide a total dry film thickness of 0.90 to 1.10 mil. Bottom side shall be coated with primer and off white backer to produce dry film thickness of 0.50 mil.

Finish shall conform to all tests for adhesion, flexibility, and longevity as specified by the Kynar 500 finish supplier.

1) SRI = 30

2.2 UNDERLAYMENT MATERIALS

A. As recommended by metal panel manufacturer and conforming with the following:

1. Felts: ASTM D 226, Type II (No. 30), asphalt-saturated organic felts.

2. Tamko TW Metal and Tile Underlayment.

3. Grace Ice and Water Shield Underlayment.

2.3 FOAM-PLASTIC BOARD INSULATION

A. Polyisocyanurate Board Insulation: Rigid cellular foam, complying with ASTM C 1289; Type I, aluminum foil both faces; Class 1, non-reinforced foam core.

1. Flame Spread Index: 75 or less, when tested in accordance with ASTM E 84.

2. Smoke Developed Index: 450 or less, when tested in accordance with ASTM E 84.

3. Compressive Strength: 16 psi (110 kPa).

4. Thickness: 1-1/2 inch (38 mm).

2.4 MISCELLANEOUS MATERIALS

A. Fasteners: Self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads.

1. Fasteners for Flashing and Trim: Blind fasteners or self-drilling screws with hex washer head.

2. Blind Fasteners: High-strength aluminum or stainless-steel rivets.

B. Sealing Tape: Pressure-sensitive, 100 percent solids, polyisobutylene compound sealing tape with release-paper backing. Provide permanently elastic, nonsag, nontoxic, nonstaining tape.

C. Elastomeric Joint Sealant: ASTM C 920, of base polymer, type, grade, class, and use classifications required to produce joints in sheet metal roofing that will remain weathertight.

D. Expansion-Joint Sealant: For hooked-type expansion joints, which must be free to move, provide nonsetting, nonhardening, nonmigrating, heavy-bodied polyisobutylene sealant.

E. Bituminous Coating: Cold-applied asphalt mastic, SSPC-Paint 12, compounded for 15-mil (0.4-mm) dry film thickness per coat.

2.5 ACCESSORIES

A. Sheet Metal Roofing Accessories: Provide components required for a complete sheet metal roofing assembly including trim, copings, fasciae, corner units, ridge closures, clips, flashings, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of sheet metal roofing, unless otherwise indicated.

1. Clips: Minimum 0.0625-inch- (1.6-mm-) thick, stainless-steel panel clips designed to withstand negative-load requirements.

2. Cleats: Mechanically seamed cleats formed from the following material:

07610-3

a. Metallic-Coated Steel Roofing: 0.0250-inch- (0.65-mm-) thick, stainless-steel or nylon-coated aluminum sheet.

3. Closures: Closed-cell, expanded, cellular, rubber or crosslinked, polyolefin-foam or closed-cell laminated polyethylene; minimum 1-inch- (25-mm-) thick, flexible closure strips; cut or premolded to match sheet metal roofing profile. Provide closure strips where indicated or necessary to ensure weathertight construction.

B. Flashing and Trim: Formed from 0.0179-inch- (0.45-mm-) thick, metallic-coated steel sheet. Provide flashing and trim as required to seal against weather and to provide finished appearance. Locations include, but are not limited to, eaves, rakes, corners, bases, framed openings, ridges, fasciae, and fillers.

Finish flashing and trim with same finish system as adjacent sheet metal roofing.

2.6 FABRICATION

A. General: Custom fabricate sheet metal roofing to comply with details shown and recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to the design, dimensions (pan width and seam height), geometry, metal thickness, and other characteristics of installation indicated. Fabricate sheet metal roofing and accessories at the shop to greatest extent possible.

1. Standing-Seam Roofing: 1.75" high vertical legs shall be spaced at 18" on-center.

2. Continuous Z-profile Rib

3. Butyl Sealant Weatherstripping

B. General: Fabricate roll-formed sheet metal roofing panels to comply with details shown and roll-formed sheet metal roofing manufacturer's written instructions.

C. Fabricate sheet metal roofing to allow for expansion in running work sufficient to prevent leakage, damage, and deterioration of the Work. Form exposed sheet metal work to fit substrates without excessive oil canning, buckling, and tool marks, true to line and levels indicated, and with exposed edges folded back to form hems.

1. Lay out sheet metal roofing so cross seams, when required, are made in direction of flow with higher pans overlapping lower pans. Stagger cross seams.

2. Fold and cleat eaves and transverse seams in the shop.

3. Form and fabricate sheets, seams, strips, cleats, valleys, ridges, edge treatments, integral flashings, and other components of metal roofing to profiles, patterns, and drainage arrangements shown and as required for leak-proof construction.

D. Metal Protection: Where dissimilar metals will contact each other, protect against galvanic action by painting contact surfaces with bituminous coating, by applying rubberized-asphalt underlayment to each contact surface, or by other permanent separation as recommended by manufacturers of dissimilar metals or by fabricator.

E. Sheet Metal Accessories: Custom fabricate flashings and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item indicated. Obtain field measurements for accurate fit before shop fabrication.

PART 3 - EXECUTION

3.1 PREPARATION

A. Space fasteners as required to resist design uplift, but not more than 18 inches (457 mm) o.c.

3.2 UNDERLAYMENT INSTALLATION

A. Felt Underlayment: Install felt underlayment on roof sheathing under sheet metal roofing. Use fasteners recommended by metal roofing manufacturer for anchorage. Apply first layer with horizontal lap joints of not less than 6 inches (150 mm) and vertical end lap joints not less than 36 inches. Install second layer running vertically as roof panels are installed with 6-10 inch vertical lap joint. Cover fasteners from first layer and fasteners of second layer w/ successive runs.

B. Install metal roofing immediately after decking is felted.

07610-4

3.3 INSTALLATION, GENERAL

A. General: Install sheet metal roofing perpendicular to purlins or supports. Anchor sheet metal roofing and other components of the Work securely in place, with provisions for thermal and structural movement.

Install fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required for a complete roofing system and as recommended by fabricator for sheet metal roofing.

1. Field cutting of sheet metal roofing by torch is not permitted.

2. Rigidly fasten eave end of sheet metal roofing and allow ridge end free movement due to thermal expansion and contraction. Predrill roofing.

3. Provide metal closures at peaks, rake edges, rake walls, and each side of ridge caps.

4. Flash and seal sheet metal roofing with weather closures at eaves, rakes, and at perimeter of all openings. Fasten with self-tapping screws.

5. Locate roofing splices over, but not attached to, structural supports. Stagger roofing splices and end laps to avoid a four-panel lap splice condition.

6. Lap metal flashing over sheet metal roofing to allow moisture to run over and off the material.

B. Fasteners: Use fasteners of sizes that will not penetrate completely through substrate.

C. Metal Protection: Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with bituminous coating, by applying rubberized-asphalt underlayment to each contact surface, or by other permanent separation as recommended by fabricator of sheet metal roofing or manufacturers of dissimilar metals.

D. Conceal fasteners and expansion provisions where possible in exposed work and locate to minimize possibility of leakage. Cover and seal fasteners and anchors as required for a tight installation.

3.4 ON-SITE, ROLL-FORMED SHEET METAL ROOFING INSTALLATION

A. General: Install on-site, roll-formed sheet metal roofing to comply with sheet metal roofing manufacturer's written instructions for UL wind-uplift class indicated. Provide sheet metal roofing of full length from eave to ridge unless otherwise restricted by shipping limitations.

B. Standing-Seam Sheet Metal Roofing: Fasten sheet metal roofing to supports with concealed clips at each standing-seam joint at location, spacing, and with fasteners recommended by manufacturer.

1. Install clips to supports with self-tapping fasteners.

2. Before panels are joined, apply continuous bead of sealant to top flange of lower panel.

3. Seamed Joint: Crimp standing seams with manufacturer-approved seamer tool so cleat, sheet metal roofing, and field-applied sealant are completely engaged.

3.5 ACCESSORY INSTALLATION

A. General: Install accessories with positive anchorage to building and weathertight mounting and provide for thermal expansion. Coordinate installation with flashings and other components.

1. Install components required for a complete sheet metal roofing assembly including trim, copings, ridge closures, seam covers, flashings, sealants, gaskets, fillers, closure strips, and similar items.

2. Comply with performance requirements, manufacturer's written installation instructions, and

SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where possible, and set units true to line and level as indicated. Install work with laps, joints, and seams that will be permanently watertight and weather resistant.

3.6 CLEANING AND PROTECTION

Remove temporary protective coverings and strippable films, if any, as sheet metal roofing is installed.

On completion of sheet metal roofing installation, clean finished surfaces, including removing unused fasteners, metal filings, pop rivet stems, and pieces of flashing. Maintain in a clean condition during construction.

07631 -1

SECTION 07631

SHEET METAL FLASHING AND TRIM

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Fabricated sheet metal items, including gutters and downspouts.

1.2 RELATED SECTIONS

A. Section 07610 "Sheet Metal Roofing."

1.3 REFERENCE STANDARDS

A. AAMA 2604 - Voluntary Specification, Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels; 2005.

B. ASTM B 209 - Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate; 2007.

C. ASTM B 209M - Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate [Metric];

2007.

D. ASTM D 4586 - Standard Specification for Asphalt Roof Cement, Asbestos-Free; 2007.

E. SMACNA (ASMM) - Architectural Sheet Metal Manual; Sheet Metal and Air Conditioning Contractors' National Association; 2003.

1.4 SUBMITTALS

A. Shop Drawings: Indicate material profile, jointing pattern, jointing details, fastening methods, flashings, terminations, and installation details.

B. Samples: Submit two samples 6 x 6 inch (152 x 152 mm) in size illustrating metal finish color.

1.5 QUALITY ASSURANCE

A. Perform work in accordance with SMACNA Architectural Sheet Metal Manual requirements and standard details, except as otherwise indicated.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Stack material to prevent twisting, bending, and abrasion, and to provide ventilation. Slope metal sheets to ensure drainage.

B. Prevent contact with materials that could cause discoloration or staining.

PART 2 PRODUCTS

2.1 SHEET MATERIALS

A. Pre-Finished Aluminum: ASTM B 209 (ASTM B 209M); 0.032 inch (0.8 mm) thick; plain finish shop pre coated with fluoropolymer coating of color as selected.

B. Hot-Dipped Galvanized ASTM A-792, 24 Gauge core steel.

1. Fluoropolymer Coating: High Performance Organic Finish, AAMA 2604; multiple coat, thermally cured fluoropolymer finish system; color as scheduled to match sheet metal roofing.

2.2 ACCESSORIES

A. Fasteners: Aluminum, with soft neoprene washers.

B. Primer: Zinc chromate type.

C. Sealant: Type as recommended by manufacturer

07631 -2

D. Sealant (for skylights): NovaFlex Metal Roof Sealant

E. Plastic Cement: ASTM D 4586, Type I.

2.3 FABRICATION

A. Form sections true to shape, accurate in size, square, and free from distortion or defects.

B. Form pieces in longest possible lengths.

C. Hem exposed edges on underside 1/2 inch (13 mm); miter and seam corners.

D. Form material with flat lock seams, except where otherwise indicated. At moving joints, use sealed lapped, bayonet-type or interlocking hooked seams.

E. Fabricate corners from one piece with minimum 18 inch (450 mm) long legs; seam for rigidity, seal with sealant.

F. Fabricate vertical faces with bottom edge formed outward 1/4 inch (6 mm) and hemmed to form drip.

G. Fabricate flashings to allow toe to extend 2 inches (50 mm) over roofing gravel. Return and brake edges.

2.4 GUTTER AND DOWNSPOUT FABRICATION

A. Gutters: SMACNA Architectural Sheet Metal Manual, Rectangular profile.

B. Downspouts: Rectangular profile.

C. Gutters: 6 x 6 inch (152 x 152 mm).

D. Downspouts: 4 x 4 inch (102 x 102 mm).

E. Downspout Boots: PVC.

F. Seal metal joints.

PART 3 EXECUTION

3.1 INSTALLATION

A. Secure flashings in place using concealed fasteners. Use exposed fasteners only where permitted.

B. Apply plastic cement compound between metal flashings and felt flashings.

C. Fit flashings tight in place. Make corners square, surfaces true and straight in planes, and lines accurate to profiles.

D. Seal metal joints watertight.

E. Secure gutters and downspouts in place using concealed fasteners.

F. Slope gutters 1/8 inch per foot minimum.

G. Connect downspouts to downspout boots. Grout connection watertight.

H. Stagger adjacent lap joints a minimum of 12 inches

3.2 REPAIRS

A. Prepare surface(s) by removing existing caulking, sealant and damaged flashing

B. Repair or replace flashing as needed

C. Install metal roofing sealant according to manufacturer’s written instructions

3.3 FIELD QUALITY CONTROL

A. Inspection will involve surveillance of work during installation to ascertain compliance with specified requirements.

08625-1

SECTION 08625

TUBULAR DAYLIGHTING DEVICE

A. Includes furnishing and installation of the tubular daylighting device, consisting of roof dome, reflec-tive tube, diffuser assembly, and any necessary blocking and trim

1.2 SUBMITTALS

A. Submit under provisions of Section 01300.

1. Product Data: Manufacturer's data sheets on each product to be used, including:

a. Preparation instructions and recommendations.

b. Storage and handling requirements and recommendations.

c. Installation methods.

2. Detail Drawings: Submit drawings showing layout, profiles and product components including anchorage, flashings and accessories.

1.3 RELATED SECTIONS

A. Section 06100 - Rough Carpentry

B. Section 06200 - Finish Carpentry

1.4 DELIVERY, STORAGE, AND HANDLING

A. Store products in manufacturer's unopened packaging until ready for installation.

B. Store and dispose of solvent-based materials, and materials used with solvent-based materials, in ac-cordance with requirements of local authorities having jurisdiction.

1.5 WARRANTY

A. Daylighting Device: Manufacturer's standard warranty for 10 years.

PART 2 PRODUCTS

2.1 MANUFACTURER

A. Basis of Design: Solatube 290 DS as manufactured by Solatube International, Inc., 2210 Oak Ridge Way, Vista, CA 92081; 1-888-765-2882; 1-760-477-1120; Fax: 760-597-4488; www.solatube.com

B. Model: S290DS-DA-F4-MR-E0-L1-LN-I

C. Requests for substitutions: Submit Product Data and Detail Drawings for review.

PART 3 EXECUTION

3.1 EXAMINATION

A. Do not begin installation until substrates have been properly prepared.

08625-2

3.2 PREPARATION

A. Clean surfaces thoroughly prior to installation.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.3 INSTALLATION

A. Install in accordance with manufacturer's printed instructions.

B. After installation of first unit, field test to determine adequacy of installation. Conduct water test in presence of COR. Correct if needed before proceeding with installation of subsequent units.

3.4 PROTECTION

A. Protect installed products until completion of project.

B. Touch-up, repair or replace damaged products before Substantial Completion.

09911-1

SECTION 09911

PAINTING

PART 1 GENERAL

1.1 SUMMARY

A. This Section includes surface preparation and field painting of exposed exterior and interior items and surfaces.

1.2 SUBMITTALS

A. Product Data: For each product indicated.

B. Samples: One 24 inch (610 mm) square sample for each type of finish-coat material indicated.

C. MSDS Sheets: For each paint and primer product specified.

1.3 PROJECT CONDITIONS

A. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F (7 deg C). Maintain storage containers in a clean condition, free of foreign materials and residue.

B. Apply waterborne paints only when temperatures of surfaces to be painted and surrounding air are between 50 and 90 deg F (10 and 32 deg C).

C. Apply solvent-thinned paints only when temperatures of surfaces to be painted and surrounding air are between 45 and 95 deg F (7 and 35 deg C).

D. Do not apply paint in snow, rain, fog, or mist; or when relative humidity exceeds 85 percent; or at temperatures less than 5 deg F (3 deg C) above the dew point; or to damp or wet surfaces.

1.4 EXTRA MATERIALS

A. Furnish extra paint materials from the same production run as the materials applied and in the quantities described below. Package with protective covering for storage and identify with labels describing contents. Deliver extra materials to US Forest Service.

1. Quantity: 5 percent, but not less than 1 gal. (3.8 L) or 1 case, as appropriate, of each material and color applied.

PART 2 PRODUCTS

2.1 PAINT MATERIALS, GENERAL

A. Material Compatibility: Provide primers and finish-coat materials that are compatible with one another and with the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.

B. Material Quality: Provide manufacturer's best-quality paint material of the various coating types specified that are factory formulated and recommended by manufacturer for application indicated. Paint-material containers not displaying manufacturer's product identification will not be acceptable.

09911-2

C. Chemical Components of Interior Paints and Coatings: Provide products that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24) and the following chemical restrictions:

1. Flat Paints and Coatings: VOC not more than 0 g/L.

2. Non-Flat Paints and Coatings: VOC not more than 0 g/L.

3. Epoxy Coatings: VOC not more than 150 g/L.

4. Anticorrosive Coatings: VOC not more than 250 g/L.

5. Varnishes and Sanding Sealers: VOC not more than 350 g/L.

6. Stains: VOC not more than 0 g/L.

7. Aromatic Compounds: Paints and coatings shall not contain more than 1.0 percent by weight total aromatic compounds (hydrocarbon compounds containing one or more benzene rings).

8. Restricted Components: Paints and coatings shall not contain acrolein; acrylonitrile; antimony;

benzene; butyl benzyl phthalate; cadmium; di (2-ethylhexyl) phthalate; di-n-butyl phthalate; di-n-octyl phthalate; 1,2-dichlorobenzene; diethyl phthalate; dimethyl phthalate; ethylbenzene; formaldehyde;

hexavalent chromium; isophorone; lead; mercury; methyl ethyl ketone; methyl isobutyl ketone;

methylene chloride; naphthalene; toluene (methylbenzene); 1,1,1-trichloroethane; or vinyl chloride.

D. Caulking and Sealants: As recommended by the manufacturer for surface(s) being joined

E. Colors: As noted or as selected from manufacturer's full range.

2.3 PREPARATORY COATS

A. Block Filler for Concrete and Masonry Substrates: Latex block filler recommended in writing by finish coat manufacturer for use with finish coat and on substrate indicated.

B. Exterior Primer: Exterior alkyd or latex-based primer of finish coat manufacturer and recommended in writing by manufacturer for use with finish coat and on substrate indicated.

1. Ferrous-Metal and Aluminum Substrates: Rust-inhibitive metal primer.

2. Zinc-Coated Metal Substrates: Galvanized metal primer.

3. Where manufacturer does not recommend a separate primer formulation on substrate indicated, use paint specified for finish coat.

C. Interior Primer: Interior latex-based or alkyd primer of finish coat manufacturer and recommended in writing by manufacturer for use with finish coat and on substrate indicated.

1. Ferrous-Metal Substrates: Quick drying, rust-inhibitive metal primer.

2. Zinc-Coated Metal Substrates: Galvanized metal primer.

3. Gypsum Board Primer: Latex-based primer for interior application.

4. Where manufacturer does not recommend a separate primer formulation on substrate indicated, use paint specified for finish coat.

2.4 FINISH COATS

B. Exterior Semi-Gloss Acrylic Paint:

1. Basis of Design: ICI "Dulux Professional" Exterior 100% Acrylic Semi-Gloss Finish, 2406 Series.

2. Color: Match Existing.

3. Location: Trim.

A. Interior Semi-Gloss Acrylic Enamel:

1. Basis of Design: ICI LifeMaster Interior Latex, 9300 Series.

3. Location: Ceiling.

09911-3

B. Interior Semi-Gloss Acrylic Enamel:

1. Basis of Design: ICI LifeMaster Interior Latex, 9300 Series.

3. Location: Interior Trim.

C. Natural Wood Ceiling:

1. Basis of Design: Acri-Soy Penetrating Bio-Based Clear Sealer (www.ecoprocote.com)

2. Location: Exterior break-area columns, trusses, and timbers.

PART 3 - EXECUTION

3.1 APPLICATION

A. Examine substrates, areas, and conditions, with Applicator present, for compliance with requirements for paint application.

B. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.

C. Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be painted. If removal is impractical or impossible because of size or weight of the item, provide surface-applied protection before surface preparation and painting.

1. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved.

D. Surface Preparation: Clean and prepare surfaces to be painted according to manufacturer's written instructions for each particular substrate condition and as specified.

1. Provide barrier coats over incompatible primers or remove and re-prime.

2. Wood: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Sand surfaces exposed to view smooth and dust off.

a. Scrape and clean small, dry, seasoned knots, and apply a thin coat of white shellac or other recommended knot sealer before applying primer. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sand smooth when dried.

b. Prime, stain, or seal wood to be painted immediately on delivery. Prime edges, ends, faces, undersides, and back sides of wood, including cabinets, counters, cases, and paneling.

c. If transparent finish is required, back-prime with spar varnish.

d. Back-prime paneling on interior partitions where masonry, plaster, or other wet wall construction occurs on back side.

e. Seal tops, bottoms, and cutouts of unprimed wood doors with a heavy coat of varnish or sealer immediately on delivery.

3. Ferrous Metals: Clean ungalvanized ferrous-metal surfaces that have not been shop coated;

remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with SSPC's recommendations.

a. Blast steel surfaces clean as recommended by paint system manufacturer and according to

SSPC-SP 6/NACE No. 3.

b. Treat bare and sandblasted or pickled clean metal with a metal treatment wash coat before priming.

c. Touch up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean with solvents recommended by paint manufacturer, and touch up with same primer as the shop coat.

4. Galvanized Surfaces: Clean galvanized surfaces with non-petroleum-based solvents so surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods.

09911-4

E. Material Preparation:

1. Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials and residue.

2. Stir material before application to produce a mixture of uniform density. Stir as required during application. Do not stir surface film into material. If necessary, remove surface film and strain material before using.

F. Exposed Surfaces: Include areas visible when permanent or built-in fixtures, grilles, convector covers, covers for finned-tube radiation, and similar components are in place. Extend coatings in these areas, as required, to maintain system integrity and provide desired protection.

1. Paint surfaces behind movable equipment and furniture the same as similar exposed surfaces.

Before final installation of equipment, paint surfaces behind permanently fixed equipment or furniture with prime coat only.

2. Paint interior surfaces of ducts with a flat, non-specular black paint where visible through registers or grilles.

3. Paint back sides of access panels and removable or hinged covers to match exposed surfaces.

4. Finish exterior doors on tops, bottoms, and side edges the same as exterior faces.

5. Finish interior of wall and base cabinets and similar field-finished casework to match exterior.

G. Sand lightly between each succeeding enamel or varnish coat.

H. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration.

1. Omit primer over metal surfaces that have been shop primed and touchup painted.

2. If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance.

I. Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators according to manufacturer's written instructions.

J. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate. Provide total dry film thickness of the entire system as recommended by manufacturer.

K. Mechanical and Electrical Work: Painting of mechanical and electrical work is limited to items exposed in equipment rooms and occupied spaces.

L. Block Fillers: Apply block fillers to concrete masonry block at a rate to ensure complete coverage with pores filled.

M. Prime Coats: Before applying finish coats, apply a prime coat, as recommended by manufacturer, to material that is required to be painted or finished and that has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to ensure a finish coat with no burn-through or other defects due to insufficient sealing.

N. Pigmented (Opaque) Finishes: Completely cover surfaces as necessary to provide a smooth, opaque surface of uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections will not be acceptable.

O. Transparent (Clear) Finishes: Use multiple coats to produce a glass-smooth surface film of even luster.

Provide a finish free of laps, runs, cloudiness, color irregularity, brush marks, orange peel, nail holes, or other surface imperfections.

09911-5

3.2 CLEANING AND PROTECTING

A. At the end of each workday, remove…