#12459 Preliminary Bid Results.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- S-10000-00012344
- Issued by
- Lane County, Oregon
About this file
This is a preliminary bid results document from the Oregon Parks and Recreation Department (OPRD) for a septic drain field installation project. The project involves the installation of septic drain field infrastructure to support five RV hook-ups at an Oregon state facility. The solicitation, posted on OregonBuys as S-63400-00012346 with OPRD project number 12459, closed on January 15, 2025. Eleven contractors submitted bids for the single lump-sum line item. The document indicates that bid evaluation for responsiveness has not yet been completed, and final bid results will be posted upon completion of the evaluation process.
The bids received range from a low of $44,700.00 to a high of $86,107.14. The lowest responsive bidder is Way to Go Construction LLC, located in Creswell, Oregon, at $44,700.00, while the highest bid was submitted by Goodman Sanitation of Florence, Oregon, at $86,107.14. Other notable bids include Pacific Northwest Sealcoating, Asphalt Repair and More at $67,500.00, NW Construction General Contracting Inc at $68,587.00, and Valley Contracting, Inc at $53,000.00. All bidders are Oregon or Washington-based contractors. The document is preliminary in nature and explicitly notes that final bid results remain pending completion of the evaluation process to determine bid responsiveness and award recommendation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S-10000-00012344 List of Proposers.pdf | ||
| AttF - Responsibility Inquiry.docx | DOCX document | |
| AttD - Reference Check.docx | DOCX document | |
| S-10000-00012344 Proposal Ranking.pdf | ||
| S-10000-00012344 Intent to Award Notice.pdf | ||
| AttI - Sample Contract.pdf | ||
| AttH - Disclosure Affidavit.docx | DOCX document | |
| AttE - Budget and Justification Template.xlsx | XLSX spreadsheet | |
| AttG - Certified Disadvantaged Outreach Plan.docx | DOCX document | |
| S-10000-00012344 (6076) Final.pdf | ||
| S-10000-00012344 (6076) Pre-Proposal Conference PowerPoint~1.pptx | PPTX presentation | |
| S-10000-00012344 (6076) Pre-Proposal Conference Recording.mp4 | MP4 file | |
| 1-23-25 Pre-Proposal Conference Q and A.pdf | ||
| AttA - Proposer Information and Certification.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRELIM. BID RESULTS
| PRELIMINARY BID RESULTS | ||||||||||||||
| Bids below have not yet been evaluated for bid responsiveness. Final bid results will be posted once available | ||||||||||||||
| OPRD # | 12459 | |||||||||||||
| OregonBuys # | S-63400-00012346 | |||||||||||||
| Closing: | 1/15/2025 | |||||||||||||
| Title: | Septic Drain Field Installation for 5 RV Hook Ups | |||||||||||||
| Skip Trucker & Lads | Way to Go Construction LLC | Pacific Northwest Sealcoating, Asphalt Repair and More | NW Constrution General Contracting Inc | Valley Contracting, Inc | Draco Enterprises LLC | Horner Brothers Construction LLC | Coos Excavation Inc | Ray Wells Inc | Goodman Sanitation | Northwest Community Builders LLC | ||||
| 23767 Peoria Rd | 83290 Russel Oaks Dr | 1815 N Bayshore | 22317 NE 72nd Ave | 91585 Territorial Hwy | 2389 Steiwer Rd SE | 22640 Peacock Lane | PO Box 60 | PO Box 3467 | 1009 NE Harlow Rd | PO Box 1011 | ||||
| Harrisburg, OR 97446 | Creswell, OR 97426 | Coos Bay, OR 97420 | Battle Ground, WA 98604 | Junction City, OR 97448 | Jefferson, OR 97352 | Bend, OR 97701 | Coos Bay, OR 97420 | Florence, OR 97439 | Troutdale, OR 97060 | Yoncalla, OR 97499 | ||||
| Item # | Description | Quantity | Unit | TOTAL COST | TOTAL COST | TOTAL COST | TOTAL COST | TOTAL COST | TOTAL COST | TOTAL COST | TOTAL COST | TOTAL COST | TOTAL COST | TOTAL COST |
| A1. | Septic Drain Field Installation for RV Hook Ups | 1 | LS | $ 79,755.19 | $ 44,700.00 | $ 67,500.00 | $ 68,587.00 | $ 53,000.00 | $ 48,253.00 | $ 79,613.00 | $ 76,500.00 | $ 58,690.00 | $ 86,107.14 | $ 56,860.00 |
| Total | $ 79,755.19 | $ 44,700.00 | $ 67,500.00 | $ 68,587.00 | $ 53,000.00 | $ 48,523.00 | $ 79,613.00 | $ 76,500.00 | $ 58,690.00 | $ 86,107.14 | $ 56,860.00 |
&"Arial,Bold"&14* * * Preliminary Results Only * * *&12 &"Arial,Italic"&10(results are not final until evaluation is completed)
&"Arial,Italic"&8&F &"Arial,Italic"&8Page &P
File details come from the government source that posted it. Updated .