MN ERFO FS SPERI909 2022-1(1)_Plans_adv (revised01282026).pdf
PDF 12 MB Posted
- Attached to
- Kimball Creek Culvert Replacement FR-304
- Solicitation number
- 12445526R0001
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a comprehensive set of construction plans for the Kimball Creek Road (Route FR-304) Culvert Replacement project (MP 4.285) in the Superior National Forest, Cook County, Minnesota. The project consists of replacing a flood-damaged culvert with a structural plate arch (corrugated aluminum) measuring 25 feet span by 8.5 feet rise by 45 feet length, along with installation of concrete headwalls, wingwalls, and associated roadway and erosion control improvements.
The project scope includes site clearing and grubbing, culvert removal and installation, riprap installation, roadway grading and construction with 14-foot travel way and 6-inch aggregate surface course, embankment construction with 4-inch topsoil and turf establishment, and comprehensive erosion and sediment control measures. Key design specifications reference AASHTO LRFD Bridge Design Specifications (9th Edition, 2020) and Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14). The structural design includes live load (HL-93) and dead loads with reinforcing steel (Grade 60) and structural concrete (Class A/AE with 5,000 psi minimum compressive strength). Work restrictions prohibit construction between September 15 and June 30 due to Kimball Creek trout stream restrictions. The plans contain detailed sheets covering typical sections, drainage cross-sections, bridge reinforcement details, erosion control narrative and plans, temporary traffic control, silt fence specifications, filter bag details, slope stabilization with rolled erosion control product (RECP), and sign structures with object markers positioned at the culvert location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Response 20260128.docx | DOCX document | |
| Kimball.GEOreport 1.pdf | ||
| Questions and Answers.docx | DOCX document | |
| MN ERFO FS SPERI909 2022-1(1) - REBAR ADV.pdf | ||
| MN ERFO FS SPERI909 2022-1(1)_Plan S02_Revised.pdf | ||
| SF 1442 Solicitation.pdf | ||
| FR304 SOW.pdf | ||
| DB.pdf | ||
| MN ERFO FS SPERI909 2022-1(1)_Plans_adv (1).pdf | ||
| FR304 SOI.pdf | ||
| Location Map.jpeg | JPEG file | |
| FR304 Supp Specs.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4/10/25
4/14/25
Digitally signed by
BRIANA PATTON
Date: 2025.04.10 15:22:25 -05'00'
Digitally signed by KYLE STOVER Date: 2025.04.14 12:47:50 -05'00'
Digitally signed by
THOMAS HALL
Date: 2025.04.14 13:37:44 -05'00'
JEFFREY DULKA
Digitally signed by JEFFREY DULKA
DN: CN=JEFFREY DULKA +
OID.0.9.2342.19200300.100.1.1=12001002948495,
OU=Department of Agriculture, O=U.S.
Government, C=US Location: USFS Eastern Region Reason: I have reviewed this document Contact Info: Regional Bridge & Structures Program Manager Date: 2025.07.02 13:24:50-05'00'
JONATH
AN HEYL
Digitally signed by
JONATHAN HEYL
Date: 2025.07.02 15:22:14 -05'00'
File details come from the government source that posted it. Updated .