This file is an Abstract of Offers for a U.S. Department of Agriculture Forest Service solicitation for Shoe Lake & Greenwood Lake Road ERFO Repairs. The solicitation (12445525B0008) is a small business set-aside construction project on the Superior National Forest, with Davis-Bacon wage requirements. Seven contractors submitted bids, including Walthcraft Partners LLC, Crawford Excavating, McKenzie Construction, Kovillic, Xenturis, Laboda Grading, with total bid prices ranging from $0 to $7,571,500.22.
The bid includes 26 line items covering road repair and construction activities such as mobilization, construction survey, culvert removal, geotextile fabric installation, road base preparation, pipe culvert installation (ranging from 21" to 72" diameter), and erosion control. The bid opening date is September 3, 2035, at 11:30 am Eastern time. Contractors must be active in SAM.gov to be eligible, and the solicitation is posted electronically with no hard copies provided. The government will not reimburse bid preparation costs, and all questions were to be submitted by August 14, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12445525B0008_Q_A.pdf | ||
| SOI_revised.pdf | ||
| GREENWOOD FSSS_revised.pdf | ||
| GREENWOOD Culvert Details.pdf | ||
| COOK_MN_DBA.pdf | ||
| GREENWOOD GRAVEL.pdf | ||
| Sol_12445525B0008.pdf | ||
| GREENWOOD SOI.pdf | ||
| GREENWOOD MASTER WORKLIST.pdf | ||
| GREENWOOD FSSS.pdf | ||
| Greenwood Area ERFO Repairs Drawings.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Abstract of Offerors |
| ISSUING OFFICE: |
| Address |
| SOLICITATION NO.: | |||||||||||
| PROJECT: | OFFEROR NO. 1 | OFFEROR NO. 2 | OFFEROR NO. 3 | OFFEROR NO. 4 | OFFEROR NO. 5 | OFFEROR NO. 6 | OFFEROR NO. 7 | ||||
| Vendor Name: | Walthcraft Partners LLC | Crawford Excavating | McKenzie Construction | Kovillic | Xenturis | Laboda Grading | |||||
| Vendor City/State: | |||||||||||
| Amendments Acknowledged: | Yes | Yes | No | No | Yes | ||||||
| Acceptance Time: | |||||||||||
| SAM eUID | |||||||||||
| Business Size: | |||||||||||
| Bid Guarantee: | Yes | Yes | Yes | Yes | No | Yes | |||||
| Government Estimate | OFFEROR NO. 1 PRICE | OFFEROR NO. 2 PRICE | OFFEROR NO. 3 PRICE | OFFEROR NO. 4 PRICE | OFFEROR NO. 5 PRICE | OFFEROR NO. 6 PRICE | OFFEROR NO. 7 PRICE | ||||
| ITEM | |||||||||||
| NO. | DESCRIPTION | EST. | |||||||||
| QTY. | UNIT |
OF
| MEASURE | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
| AMOUNT | UNIT |
| PRICE | TOTAL |
AMOUNT
| 1 | MobilizaION | 1 | $100,000.00 | $100,000.00 | $148,000.00 | $148,000.00 | $1,916,038.05 | $1,916,038.05 | $300,000.00 | $300,000.00 | $700,000.00 | $700,000.00 | $54,000.00 | $54,000.00 | $0.00 | $0.00 | |||
| 2 | Construction Survey and Staking Tolerance A | 1 | $15,800.00 | $15,800.00 | $15,000.00 | $15,000.00 | 281.063.75 | ERROR:#VALUE! | $100,000.00 | $100,000.00 | $85,000.00 | $85,000.00 | $16,700.00 | $16,700.00 | $0.00 | $0.00 | |||
| 3 | Contractor Tyesting | 1 | $7,650.00 | $7,650.00 | $10,000.00 | $10,000.00 | $228,507.11 | $228,507.11 | $100,000.00 | $100,000.00 | $33,990.50 | $33,990.50 | $27,500.00 | $27,500.00 | $0.00 | $0.00 | |||
| 4 | Removal of Existing Culverts, disposal method A | 1 | $20,150.00 | $20,150.00 | $12,000.00 | $12,000.00 | $177,093.01 | $177,093.01 | $362,500.00 | $362,500.00 | $120,000.00 | $120,000.00 | $10,000.00 | $10,000.00 | $0.00 | $0.00 | |||
| 5 | Geotxtile Fabric, Calss 2, Type B | 800 | $35,990.00 | $28,792,000.00 | $7.00 | $5,600.00 | $17.13 | $13,704.00 | $10.00 | $8,000.00 | $5.50 | $4,400.00 | $8,000.00 | $6,400,000.00 | $0.00 | $0.00 | |||
| 6 | Dewatering | 1 | $22,090.00 | $22,090.00 | $8,500.00 | $8,500.00 | $331,335.32 | $331,335.32 | $150,000.00 | $150,000.00 | $65,000.00 | $65,000.00 | $10,000.00 | $10,000.00 | $0.00 | $0.00 | |||
| 7 | Bedding Aggergate, 3/4" Clean Crucshed Rock | 45 | $315.00 | $14,175.00 | $65.00 | $2,925.00 | $285.63 | $12,853.35 | $250.00 | $11,250.00 | $65.00 | $2,925.00 | $160.00 | $7,200.00 | $0.00 | $0.00 | |||
| 8 | Placed RipRap, ClassI, Non-Angular pit rock is approved fro use | 11 | $272.00 | $2,992.00 | $100.00 | $1,100.00 | $354.18 | $3,895.98 | $500.00 | $5,500.00 | $95.00 | $1,045.00 | $180.00 | $1,980.00 | $0.00 | $0.00 | |||
| 9 | Road Base, grading C, comaption method A | 5810 | $33.00 | $191,730.00 | $24.00 | $139,440.00 | $92.54 | $537,657.40 | $125.00 | $726,250.00 | $58.00 | $336,980.00 | $25.75 | $149,607.50 | $0.00 | $0.00 | |||
| 10 | Stockpiled Surfacing Aggregate, comaptiuon method A, form Assinika stockpile | 3000 | $23.50 | $70,500.00 | $16.00 | $48,000.00 | $68.55 | $205,650.00 | $125.00 | $375,000.00 | $50.00 | $150,000.00 | $13.75 | $41,250.00 | $0.00 | $0.00 | |||
| 11 | Curched Surfaceing Agragate, grading P, (MNDOT Class 1 Modified) comapction method A, Loose Volume | 27769 | $24.00 | $666,456.00 | $24.00 | $666,456.00 | $94.83 | $2,633,334.27 | $100.00 | $2,776,900.00 | $78.00 | $2,165,982.00 | $25.75 | $715,051.75 | $0.00 | $0.00 | |||
| Road Reconditioning, Ditch Cleaning | 9775 | $30.00 | $293,250.00 | $5.00 | $48,875.00 | $34.27 | $334,989.25 | $25.00 | $244,375.00 | $12.50 | $122,187.50 | $2.00 | $19,550.00 | ||||||
| 12 | Road Reconditioing, Ditch Construction | 4255 | $220.00 | $936,100.00 | $10.00 | $42,550.00 | $58.26 | $247,896.30 | $75.00 | $319,125.00 | $16.00 | $68,080.00 | $3.00 | $12,765.00 | $0.00 | $0.00 | |||
| 13 | 21" Diameter pipe culvert, polymer-coated steel, 14 ga | 346 | $250.00 | $86,500.00 | $110.00 | $38,060.00 | $182.80 | $63,248.80 | $300.00 | $103,800.00 | $260.00 | $89,960.00 | $130.00 | $44,980.00 | $0.00 | $0.00 | |||
| 14 | 24:" diamter pipe culvert, polymer coated steeel 14 ga | 200 | $260.00 | $52,000.00 | $115.00 | $23,000.00 | $188.51 | $37,702.00 | $350.00 | $70,000.00 | $300.00 | $60,000.00 | $138.00 | $27,600.00 | $0.00 | $0.00 | |||
| 15 | 30" diamter pipe culvert, polymer-coated steel, 14 GA | 58 | $295.00 | $17,110.00 | $135.00 | $7,830.00 | $211.36 | $12,258.88 | $400.00 | $23,200.00 | $350.00 | $20,300.00 | $152.00 | $8,816.00 | $0.00 | $0.00 | |||
| 42” diameter pipe culvert, polymer-coated steel, | |||||||||||||||||||
| 14 ga | 70 | $305.00 | $21,350.00 | $205.00 | $14,350.00 | $274.20 | $19,194.00 | $150.00 | $10,500.00 | $475.00 | $33,250.00 | $224.00 | $15,680.00 | ||||||
| 16 | 72' diamter pipe culvert, polymer-coated steel, 12GA, 5" x1" Corrugations | 76 | $315.00 | $23,940.00 | $400.00 | $30,400.00 | $514.14 | $39,074.64 | $750.00 | $57,000.00 | $1,050.00 | $79,800.00 | $375.00 | $28,500.00 | |||||
| 17 | 28" span, 20" rise pipe culvert, polymer-coated | ||||||||||||||||||
| steel, 14 ga | 34 | $330.00 | $11,220.00 | $148.00 | $5,032.00 | $239.93 | $8,157.62 | $350.00 | $11,900.00 | $450.00 | $15,300.00 | $137.00 | $4,658.00 | ||||||
| 18 | 35" span, 24" rise pipe culvert, polymer-coated | ||||||||||||||||||
| steel, 12 ga | 150 | $345.00 | $51,750.00 | $170.00 | $25,500.00 | $274.20 | $41,130.00 | $400.00 | $60,000.00 | $650.00 | $97,500.00 | $182.00 | $27,300.00 | ||||||
| 19 | 42" span, 29" rise pipe culvert, polymer-coated | ||||||||||||||||||
| steel, 12 ga | 128 | $350.00 | $44,800.00 | $208.00 | $26,624.00 | $308.48 | $39,485.44 | $450.00 | $57,600.00 | $750.00 | $96,000.00 | $298.00 | $38,144.00 | ||||||
| 20 | 49" span, 33" rise pipe culvert, polymer-coated | ||||||||||||||||||
| steel, 12 ga | 254 | $380.50 | $96,647.00 | $360.00 | $91,440.00 | $342.76 | $87,061.04 | $500.00 | $127,000.00 | $850.00 | $215,900.00 | $300.00 | $76,200.00 | ||||||
| 21 | 57" span, 38" rise pipe culvert, polymer-coated | ||||||||||||||||||
| steel, 12 ga | 56 | $405.99 | $22,735.44 | $365.00 | $20,440.00 | $382.74 | $21,433.44 | $600.00 | $33,600.00 | $900.00 | $50,400.00 | $315.00 | $17,640.00 | ||||||
| 22 | 64" span, 43" rise pipe culvert, polymer-coated | ||||||||||||||||||
| steel, 12 ga | 46 | $55,900.00 | $2,571,400.00 | $370.00 | $17,020.00 | $434.16 | $19,971.36 | $750.00 | $34,500.00 | $1,000.00 | $46,000.00 | $350.00 | $16,100.00 | ||||||
| 23 | Turf Establishment, Seed Mix FSSS 625.07 | 1 | $35,579.00 | $35,579.00 | $15,000.00 | $15,000.00 | $108,540.88 | $108,540.88 | $300,000.00 | $300,000.00 | $18,000.00 | $18,000.00 | $10,000.00 | $10,000.00 | |||||
| 24 | Erosion Control Blanket Installation, Type 2.D | ||||||||||||||||||
| Biodegradable | 1 | $500.00 | $500.00 | $10,000.00 | $10,000.00 | $73,122.27 | $73,122.27 | $300,000.00 | $300,000.00 | $22,000.00 | $22,000.00 | $500.00 | $500.00 | ||||||
| 25 | Temporary Traffic Control | 1 | $48,800.00 | $48,800.00 | $10,000.00 | $10,000.00 | $34,276.06 | $34,276.06 | $200.00 | $200.00 | $90,000.00 | $90,000.00 | $7,500.00 | $7,500.00 | |||||
| 26 | Crushed Surfacing Aggregate, grading G, compaction | ||||||||||||||||||
| method A | 200 | $217.50 | $43,500.00 | $24.00 | $4,800.00 | $214.13 | $42,826.00 | $0.00 | $60.00 | $12,000.00 | $25.75 | $5,150.00 | |||||||
| TOTAL PRICE | $0.00 | $2,157,000.00 | $1,487,942.00 | $7,571,500.22 | $7,029,000.00 | $4,802,000.00 | $1,405,660.25 | $0.00 | |||||||||||
| I certify that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. | |||||||||||||||||||
| Signature: | No Bid Guarantee, Past Performance or Technical Approach information provided. | ||||||||||||||||||
| Date: |