Sol_12445522Q0163_Amd_0001.pdf
PDF 744 KB Posted
- Attached to
- NRS-16 Greenhouse Glazing and Climate Controls
- Solicitation number
- 12445522Q0163
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12445522Q0163 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
540B
OSCODA MI 48750-1595
5761 N SKEEL
HURON SHORES RANGER STATION
USDA FOREST SERVICE
ATLANTA GA 30309-2449
STE 876S
1720 PEACHTREE ST NW
USDA-FS CSA EAST 13
08/23/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/28/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to incorporate Questions and Answers through 8-23-2022.
The responses are hereby incorporated as part of this solicitation.
Statements of Work take precedence over the SAMPLE SOI spreadsheet (which is NOT a mandatory document). The SOI (sample) was a result of two projects being combined. There was some overlap. This document is a sample, is NOT all inclusive and may be altered by vendor for submission. The important part of the request is to provide a detailed breakdown for the parts and labor ALONG WITH the lump sum quote submitted in the Mandatory Complete and return package.
The Attachment C Statement of Work Del OH GH glazing and mechanicals DCv1 May 2022 DC rev
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DEBRA K. BRINN
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12445522Q0163/0001 aug 12 AND Attachment B Statement of Work Del OH
GH controllers DCv1 May 2022 are the proper
Statements of Work and a revised SAMPLE SOI is attached, dated 8-23-22.
There are no other changes as a result of this modification.
Period of Performance: 09/05/2022 to 01/02/2023
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
NRS-16 Greenhouse Glazing and Controls 12445522Q0163
Questions and Answers as of 8-23-2022
Q1. There are no specifications for the 8MM Polycarbonate for the reglazing portion of the project. There are several grades of polycarbonate and with no specifications I am concerned that some might quote the least quality material to be awarded the project.
A1. 8mm double wall polycarbonate glazing with UV coating, 78% light transmission or higher, minimum 10 warranty against loss of light transmission, diffuse light panels are acceptable but not required.
Q2. Also note that it would be more realistic to list polycarbonate as a lot on your price breakdown sheet as there are different length sheets required for the roof compared to the sidewalls and the gable ends.
Not all of the sheets are the same length or the same price.
A2. SOI (sample) amended as of 8-15-2022 has a secondary tab with panel dimensions, also listed here:
current panel dimensions approx sq ft number of panels sq ft sum
4ft wide x 5 ft tall side wall panels 20 27 540 4 ft x 185 inch roof panels 60 36 2160 4 ft x 3 ft. swamp cooler panels 12 10 120 gables above swamp cooler 0 4ft x 98 in 32 2 64 4ft x 76 in 24 2 48 4 ft x 77 in 24 2 48 4 ft x 55 in 20 2 40 32 in x 20 in 6 2 12 exhaust fan ends 0 4 ft x 6 ft 24 2 48 4 ft x 8 ft 32 2 64 4 ft x 52 in 20 4 80 4 ft x 28 in 10 4 40 4 ft x 135 in 48 4 192 4 ft x 40 inches 16 2 32 42 inches x 18 inches 6 1 6 26 inches x 54 inches 10 1 10 column sums 103 3504
Q3. The other comments are relative to the control specification:
The greenhouse equipment is listed in both the top section which is the control section and also in the bottom section which is the glazing section.
The equipment should be in either the top section or the bottom section but not both.
A3. The SOI (sample) has been changed to reflect these changes. Reminder: The SOI (sample) was a result of two projects being combined. There was some overlap. This document is a sample, is NOT all inclusive and may be altered by vendor for submission. The important part of the request is to provide a detailed breakdown for the parts and labor ALONG WITH the lump sum quote submitted in the Mandatory Complete and return package.
Q4. I also question the VAF fan as I don’t think there is one at the site and it would not be beneficial in these small compartments. VAF fans are typically used in much larger production zones.
A4. Replacing what is on site
Q5. Are substitutions acceptable for the control system? There is no written specification on a Brand Name listed in the cost breakdown spreadsheet.
A5. The request is for Step UP controls or equivalent. This has been included in the SOI. Substitutions are acceptable. Please provide brochures/specs for the item being offered.
This solicitation incorporates 52.211-6 Brand Name or Equal
Q6. I do not see any place in the price breakdowns to input the costs to modify the electrical circuits for the lights as described in the solicitation and cost for installation of the control system. The costs for installation are lump sum, they are not broken down into cost for each component of the system, as an example conduit and wiring will be required but there is not place to input those values. Generally installation is provided as a lump sum for both the reglazing/equipment replacement and also for the control system installation.
A6. The SOI (sample) has been changed to reflect these changes. Reminder: The SOI (sample) was a result of two projects being combined. There was some overlap. This document is a sample, is NOT all inclusive and may be altered by vendor for submission. The important part of the request is to provide a detailed breakdown for the parts and labor (industry standard breakdown is fine, does NOT need to be SOI sample) ALONG WITH the lump sum quote submitted in the Mandatory Complete and return package.
Q7. Are you expecting the Cost Breakdown document to be submitted with the bid or only the lump sum?
A7. Submit along with the quote please. The lump sum for each is to be entered in the “mandatory complete and return” package, the breakdown is to be provided as a separate document.
Q8. Can you confirm the number of unit heaters per compartment?
The bid sheet only has 2 unit heaters to be replaced, but should be four if there are two unit heaters per compartment.
A8. The heaters are not to be replaced. The STATEMENT OF WORK takes precedence over the SAMPLE SOI. The SOI (sample) has been changed to reflect these changes. Reminder: The SOI (sample) was a result of two projects being combined. There was some overlap. This document is a sample, is NOT all inclusive and may be altered by vendor for submission. The important part of the request is to provide a detailed breakdown for the parts and labor ALONG WITH the lump sum quote submitted in the Mandatory Complete and return package.