This solicitation involves a bridge replacement and road reconditioning project on National Forest System lands. The scope of work includes replacing an existing 200-foot-long two-lane bridge over Bald River Falls with a new 170-foot-long two-span structure with sidewalk and observation deck, as well as clearing, grubbing, guardrail installation and paving. Reconditioning activities will be performed on NFSR 35 to prepare it for use as a detour route during bridge construction, such as clearing, excavation, culvert work and paving. Ongoing maintenance of the detour routes on NFSRs 216, 217 and 35 is also required and includes weekly inspections, grading, mowing, culvert cleaning and snow plowing through the life of the project closure. The solicitation is issued by the US Department of Agriculture Forest Service for a project with a construction value between $5-10 million located in Tellico Plains, Tennessee. Responses are due by the date and time specified in the solicitation document.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

Schedule of Items
IGEADAMSStampede
Bridge ConstructionRoad No.210Road No.210Road No.210
Item
NumberDescriptionMethod of
Meas.UnitQuantityUnit PriceTotal
15101MobilizationLSAll$306,632.37$306,632.37$1,400,000.00$1,400,000.00$584,025.36$584,025.36
15201Construction Survey And StakingLSAll$12,500.00$12,500.00$50,000.00$50,000.00$65,976.85$65,976.85
15701Erosion ControlLSAll$14,500.00$14,500.00$80,000.00$80,000.00$106,780.60$106,780.60
20101Clearing And Grubbing, Disposal Method (a)ACRE0.1$35,000.00$3,500.00$500,000.00$50,000.00$117,824.64$11,782.46
20301Removal Of Existing Structure, Disposal Method
(a)LSAll$196,395.00$196,395.00$550,000.00$550,000.00$739,774.87$739,774.87
20401Excavation And Embankment (Roadway
Grading), Compaction Method 2LSAll$21,750.00$21,750.00$100,000.00$100,000.00$60,279.48$60,279.48
20801Structure ExcavationLSAll$136,280.00$136,280.00$300,000.00$300,000.00$1,010,600.26$1,010,600.26
25101Placed Rip Rap (Class 1)TON10$70.00$700.00$250.00$2,500.00$224.84$2,248.45
25102Placed Rip Rap (Class 5)TON1500$62.72$94,080.00$100.00$150,000.00$217.23$325,838.70
25601Rock AnchorsLSAll$239,902.50$239,902.50$350,000.00$350,000.00$70,375.31$70,375.31
30201Minor Crushed Aggregate, Grading CTON50$50.00$2,500.00$100.00$5,000.00$122.53$6,126.69
40301Asphalt Base Course (Tdot Type A Mix)TON280$153.00$42,840.00$350.00$98,000.00$526.30$147,364.91
40302Asphalt Surface Course (Tdot Type D Mix)TON290$163.80$47,502.00$400.00$116,000.00$631.56$183,153.53
40303Asphalt Binder (Tdot Pg 64-22)CQTON30$726.00$21,780.00$1,700.00$51,000.00$2,966.44$88,993.10
41301Asphalt Pavement Milling (0"-2")CQSY210$32.00$6,720.00$170.00$35,700.00$267.94$56,266.60
41801Asphalt Concrete Pavement PatchingCQTON100$192.00$19,200.00$600.00$60,000.00$1,033.47$103,346.82
55201Structural Concrete, Class A(AE)CY477$1,280.86$610,967.84$2,250.00$1,073,250.00$2,182.35$1,040,981.58
55301Prestressed Concrete Box BeamsCQLF2125$430.42$914,631.88$850.00$1,806,250.00$598.98$1,272,832.56
55402Reinforcing Steel - Epoxy CoatedCQLB19144$2.64$50,540.16$2.50$47,860.00$4.46$85,411.72
55403Reinforcing Steel - Uncoated (Bridge)CQLB62219$1.59$98,928.21$2.25$139,992.75$5.64$351,162.17
55601Anodized Double Faced One Bar Metal RailLF194$458.16$88,883.04$550.00$106,700.00$944.31$183,196.24
55602Anodized One Bar Metal RailLF170$300.09$51,015.30$500.00$85,000.00$967.43$164,463.94
55603Steel Pedestrian RailLF169$496.00$83,824.00$1,000.00$169,000.00$1,415.99$239,302.38
56401Bearing DevicesLSAll$15,082.50$15,082.50$15,000.00$15,000.00$16,270.69$16,270.69
60101Minor Concrete StructuresCY20$850.00$17,000.00$2,500.00$50,000.00$11,930.51$238,610.23
60501Abutment Backfill System, Compaction Method 1CQLSAll$154,285.00$154,285.00$300,000.00$300,000.00$972,883.18$972,883.18
61701Steel Backed Timber GuardrailLF150$75.50$11,325.00$190.00$28,500.00$812.83$121,924.38
61702Steel Backed Timber Guardrail Tl-2 Structure
TransitionEACH2$9,737.50$19,475.00$10,000.00$20,000.00$18,385.56$36,771.11
61703Tl-2 End Terminal For Steel Backed Timber G/REACH2$7,950.00$15,900.00$11,000.00$22,000.00$20,320.88$40,641.75
61901GatesEACH2$4,750.00$9,500.00$10,000.00$20,000.00$9,148.79$18,297.58
61902Bollard PostsEACH7$425.00$2,975.00$2,500.00$17,500.00$2,464.39$17,250.74
62001Stone Veneer For Pedestrian RailLSAll$53,160.00$53,160.00$190,000.00$190,000.00$119,593.18$119,593.18
62501Turf Establishment (Permanent)ACRE1$3,181.25$3,181.25$15,000.00$15,000.00$5,480.94$5,480.94
63501Temporary Traffic ControlLSAll$5,500.00$5,500.00$25,000.00$25,000.00$59,788.87$59,788.87
Total Bridge Construction$3,372,956.05$7,529,252.75$8,547,797.23
NFSR 35 ReconditioningNFSR 35
Item
NumberDescriptionMethod of
Meas.UnitQuantityUnit PriceTotal
15101MobilizationLSAll$70,518.70$70,518.70$250,000.00$250,000.00$157,507.02$157,507.02
15701Soil and Erosion ControlLSAll$5,500.00$5,500.00$25,000.00$25,000.00$17,729.17$17,729.17
15901Reconstruction StakingMI0.78$3,000.00$2,340.00$12,500.00$9,750.00$30,844.65$24,058.83
20101Clearing and grubbing, disposal method logs "i",
tops & limbs "g", stumps "l"MI0.78$4,500.00$3,510.00$200,000.00$156,000.00$59,530.88$46,434.09
20301Removal of Obstructions, Culverts, Disposal
Method AEA6$250.00$1,500.00$1,800.00$10,800.00$4,514.10$27,084.60
20406Roadway Excavation, Streambank ProtectionCQCY30$45.00$1,350.00$95.00$2,850.00$120.33$3,609.93
20451Roadway Excavation, Deep Patch. NFSR 35 MP
0.140LSAll$26,500.00$26,500.00$60,000.00$60,000.00$82,202.92$82,202.92
20452Roadway Excavation, Deep Patch. NFSR 35 MP
0.185LSAll$79,000.00$79,000.00$185,000.00$185,000.00$276,730.49$276,730.49
20453Roadway Excavation, Deep Patch. NFSR 35 MP 0.572LSAll$4,000.00$4,000.00$10,000.00$10,000.00$6,650.34$6,650.34
25102Placed Riprap, Class 3CQCY40$60.00$2,400.00$175.00$7,000.00$331.84$13,273.67
30101Aggregate base, Grading 'C', compaction method BTon640$37.50$24,000.00$110.00$70,400.00$101.34$64,857.41
30301Roadway Reconditioning, Compaction Method BCQMI0.1$2,100.00$210.00$210,000.00$21,000.00$95,073.22$9,507.32
30302Ditch ReconditioningCQMI0.78$900.00$702.00$40,000.00$31,200.00$254,244.80$198,310.94
30308Roadway Pulverizing, 4" Depth ReclamationCQMI0.78$12,500.00$9,750.00$250,000.00$195,000.00$262,454.78$204,714.73
40301Asphalt Concrete, TN State DOT, Type I, NFSR
35 3" OverlayTon1273$225.00$286,425.00$300.00$381,900.00$488.96$622,448.50
602014' Span x 3' Height x 28' Length Concrete Box
Culvert Compaction Method B.LSAll$75,000.00$75,000.00$35,000.00$35,000.00$102,706.48$102,706.48
602028' Span x 3' Height x 32' Length, 35° skew,
Concrete Box Culvert Compaction Method B.LSAll$85,000.00$85,000.00$45,000.00$45,000.00$145,307.74$145,307.74
602038' Span x 3' Height x 38' Length, 30° skew, Concrete Box Culvert Compaction Method B.LSAll$85,000.00$85,000.00$50,000.00$50,000.00$159,039.81$159,039.81
6022424" (28" x 20") CMPA, Compaction Method BLF30$145.00$4,350.00$275.00$8,250.00$317.81$9,534.22
6022530" (35" x 24") CMPA, Compaction Method BLF30$165.00$4,950.00$300.00$9,000.00$367.55$11,026.46
63301Permanent Traffic ControlEA3$400.00$1,200.00$750.00$2,250.00$9,632.23$28,896.69
63501Temporary Traffic ControlLSAll$2,500.00$2,500.00$20,000.00$20,000.00$14,975.87$14,975.87
Total Detour Reconditioning$775,705.70$1,585,400.00$2,226,607.23
Detour Route Ongoing MaintenanceRoad No.216/217/35
Item
NumberDescriptionMethod of
Meas.UnitQuantityUnit PriceTotalUnit PriceTotal
001-2Ongoing Road Maintenance, NFSR 35, 216, 217LSAll$125,000.00$125,000.00$375,000.00$375,000.00$224,734.62$224,734.62
Total Detour Route Ongoing Maintenance$125,000.00$375,000.00$224,734.62
TOTAL PROJECT COST $4,273,661.75$9,489,652.75$10,999,139.08
IGEAdamsStampede
$125,000.00$375,000.00$224,734.62
$775,705.70$1,585,400.00$2,226,607.23
$3,372,956.05$7,529,252.75$8,547,797.23
$4,273,661.75$9,489,652.75$10,999,139.08