12445121B0003_0002.pdf
PDF 507 KB Posted
- Solicitation number
- 12445121B0003
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains an invitation for bid for selective demolition services at the Ouachita Job Corps Center. The contractor will demolish 30 buildings and structures, including dormitories, vocational buildings, storage facilities, and slabs. Optional line items are included subject to funding availability. Hazardous materials abatement may be required. The pre-bid site visit will be on August 13th and bids are due by September 15th. The contract will be a firm-fixed price award made to the lowest priced responsive and responsible bidder. The project is set aside for small businesses with a size standard of $16.5M for the NAICS 238910 site preparation industry. The Forest Service is the contracting agency and the work must be completed within 180 days of notice to proceed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12445121B0003 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
531A
WINCHESTER KY 40391
1700 BYPASS ROAD
DANIEL BOONE NATIONAL FOREST
ATLANTA GA 30309-2449
STE 876S
1720 PEACHTREE ST NW
USDA-FS CSA EAST 11
08/05/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/05/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of amendment 00002 is to correct the Schedule B of the SF-1442. Change as follows: remove/replace
- 12445121B0003 SF1442, Solicitation Package PDF, PAGE 4 OF 105; REMOVE AND REPLACE WITH THE ATTACHED PAGE
- 12445121B0003 Solicitation Package PDF, PAGE 06 - 08 OF 105; REMOVE AND REPLACE WITH THE ATTACHED PAGES 01-06.
Asbestos Reports available as of 8-30-21, Attached:
- Asbestos Evaluation Report, Ouachita CCC, Royal, AR Sept 11, 1992 / Download from Sam.gov
- Ouachita CCC, Royal, AR, Facility Planning Report Vol II, June, 2015 / Download from Sam.gov
Asbestos Reports forthcoming:
Asbestos Evaluation Report, Ouachita CCC, Royal, AR Sept 2021 (TO BE RELEASED ASAP)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STEVEN J. ALVES
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
X 1 salves Highlight salves Highlight salves Highlight
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 105
CONTINUATION SHEET
PAGE OFREFERENCE NO. OF DOCUMENT BEING CONTINUED
12445121B0003/00002 Rev 1 8-30-21
REVISED SCHEDULE B PART I Asbestos-Containing Material Abatement Summary See attached schedule B
REVISED SCHEDULE B PART II; BUILDING/STRUCTURE DEMOLITION
See attached schedule B
REVISED SCHEDULE B PART III; OPTIONAL BUILDING/STRUCTURE DEMOLITION
- SUBJECT TO AVAILABILITY OF FUNDS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
0001 $______________
0003 $______________ salves Highlight salves Highlight
12445121B0003_0002 / 8/30/21 USDA-FS Ouachita Job Corps Decommission
REVISED SCHEDULE B PART I
Asbestos-Containing Material Abatement Summary
LI
Bldg.
No.
Sample Number
Survey Year
Description and Location Condition
Friable/Non- Friable
Asbestos Type Approx.
Quantity
Unit Cost Total Cost
2SR-2 21 Sheetrock Ceiling, W Dorm Good, Friable 2% Chrysotile
6,268 ft2 per ft2
$ 2SR-3 21 Sheetrock Ceiling, W Dorm Good, Friable Positive Stop
001 2SR-4 21 Sheetrock Ceiling, E Dorm Good, Friable Positive Stop
Air monitoring for sheetrock ceiling removal in Building 2 ___days per day
002 5
16-1* 92 Light Green, Light Brown, & Grey Linoleum, (Bldg. 5: Health Care) Labs Good, Non-Friable 20-25% Chrysotile 850 ft2 per ft2
16-2* 92 Grey, Light Brown, & Off-White Linoleum, (Bldg. 5: Health Care) Utility Good, Non-Friable 20-25% Chrysotile
003 9 9-3 92 12”x 12” Vinyl Floor Tile, Grey w/ Light Green, Dark & White Streaks Good, Non-Friable 1-5% Chrysotile 70 per ft2
004 10 10-1 92 12”x 12” Vinyl Floor Tile, Off-White w/ Brown Specks and Mastic Good, Non-Friable 1-5% Chrysotile 850 ft2 per ft2
REVISED SCHEDULE B PART I
Asbestos-Containing Material Abatement Summary
LI
Bldg.
No.
Sample Number
Source Description and Location Condition
Friable/Non- Friable
Asbestos Type Approx.
Quantity
Unit Cost Total Cost
005 12
12VM-1 21 Vent Mastic - Northeast Corner of Main Building Roof Good, Non-Friable 10% Chrysotile
30 ft
LF
12VM-2 21 Vent Mastic - Northeast Corner of Main Building Roof Good, Non-Friable Positive Stop
12RM-1 21 Roof Pipe Mastic - Northwest Area of Main Building Roof Good, Non-Friable 10% Chrysotile
12RM-2 21 Roof Pipe Mastic - Northwest Area of Main Building Roof Good, Non-Friable Positive Stop
12LRM-1 21 Lower Roof Pipe Mastic – Near Southwest Area of Lower Roof Good, Non-Friable 10% Chrysotile
12LRM-2 21 Lower Roof Pipe Mastic – Near Southwest Area of Lower Roof Good, Non-Friable Positive Stop
12-3 92 12”x 12” Vinyl Floor Tile, Off-White w/ Brown Streaks Good, Non-Friable 1-5% Chrysotile
1,450 ft2 per ft2
12”x 12” Vinyl Floor Tile, Off-White w/ Brown Streaks (same as 12-3 above) – Cement Masonry (Safe Room) and stairway entrance landing.
Good, Non-Friable
Assumed
12-4 92 12”x 12” Vinyl Floor Tile, Off-White w/ Light Green Streaks (Mastic is
ACM)
Good, Non-Friable 1-5% Chrysotile 1,000 ft2 per ft2
12-4QC 92
12”x 12” Vinyl Floor Tile, Off-White w/ Light Green Streaks (Mastic is ACM)
Good, Non-Friable 1% Chrysotile
006 Notice of Intent filing fee $
*Building 5 (Health Care) was listed/sampled as Building 16 on the 1992 Asbestos Evaluation Report. PART I ASBESTOS TOTAL PRICE $
REVISED SCHEDULE B PART II
BUILDING/STRUCTURE DEMOLITION
Line item
UNIT
QUANTY
ITEM DESCRIPTION
TOTALS
007 Each 1 Building 02 Men’s Dormitory I Demolition $
008 Each 1 Building 12 Vocational Demolition $
009 Each 1 Building 21 Laundry/Student Canteen Demolition $
010 Each 1 Buildings 29 and 29A Demolition $
011 Each 1 Building 30 Oil Storage and Building 30A Vocational Storage Demolition $
012 Each 1 Building 31 Vocational Storage Demolition $
013 Each 1 Building 43 Vocational Storage Demolition $
PART II BUILDING/STRUCTURE DEMOLITION TOTAL PRICE $
REVISED SCHEDULE B PART III
OPTIONAL BUILDING/STRUCTURE DEMOLITION – SUBJECT TO AVAILABILITY OF FUNDS
Option 14 Each 1 Buildings 06C, 06D, and 06E Gymnasium Storage Demolition $
Option 15 Each 1 Building 08A Paint Storage Demolition $
Option 16 Each 1 Building 08B Maintenance Storage Demolition $
Option 17 Each 1 Building 08C Carpentry Storage Demolition. $
Option 18 Each 1 Building 08D Vocational Storage Demolition $
Option 19 Each 1 Building 15B and 15C Dining Storage Demolition $
Option 20 Each 1 Building 53A Masonry Storage Demolition $
Option 21 Each 1 Building 55A Dormitory Storage Demolition $
Option 22 Each 1 Building 57, 59, 60, 61, 62 Demolition $
Option 23 Each 1 Building 63 Storage Demolition. $
Option 24 Each 1 Building 63A and 63B Vocational Storage Demolition $
Option 25 Each 1 Slabs in Front of Building 02 Men’s Dormitory I Demolition $
Option 26 Each 1 Slabs Around the Flammable Storage Building 5B Demolition $
Option 27 Each 1 Slabs Around Amphitheater Demolition $
Option 28 Each 1 Sign and Concrete North of the Residential Worker Office Building 13 Demolition $
Option 29 Each 1 Satellite Dish Demolition $
REVISED SCHEDULE B PART III
OPTIONAL BUILDING/STRUCTURE DEMOLITION – SUBJECT TO AVAILABILITY OF FUNDS
Option 30 Each 1 Gymnasium Dumpster Pad Demolition $
Option 31 Each 1 Slab and Part of Sidewalk North of the Vocational office/Warehouse Building 10 Demolition $
Option 32 Each 1 Storage Racks East of Vocational Storage Building 08D Demolition $
Option 33 Each 1 Reservoir and Pump House Under Buildings 15B and 15C Dinning Storage Demolition $
Option34 Each 1 Storage Bins One West of Building 29 and One East of Building 63 Demolition $
Option 35 Each 1 Slabs Southeast of Dining Hall Building 15 Demolition $
Option36 Each 1 Storage Bins and Slabs Around of Building 43 and Building 53A Demolition $
Option 37 Each 1 Concrete Debris East of Gazebo Building 57 $
Option 38 Each 1 Building Carport and Storage and Slab Demolition $
*PART III OPTIONAL BUILDING/STRUCTURE DEMOLITION TOTAL PRICE
* The Government intends to award none, some or all of Part III Optional Building/Structure Demolition dependent upon funding availability. Optional items will be awarded in any combination/sequence that is most beneficial to the government.
*52.232-18 Availability of Funds (Apr 1984) (Line Items 014 – 038) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the contracting officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the contracting officer.
*52.217-4 Evaluation of Options Exercised at Time of Contract Award. (Line Items 014 – 038) Evaluation of Options Exercised at Time of contract Award (June 1988)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate the total price for the basic requirement together with any Option(s) exercised at the time of award.
(End of provision)
REVISED SCHEDULE B BID SCHEDULE SUMMARY
USDA_FS OUACHITA National Forest JOB CORPS CENTER SELECTIVE DEMOLITION
Schedule Total price
SCHEDULE B PART I Asbestos-Containing Material Abatement Summary $
SCHEDULE B PART II BUILDING/STRUCTURE DEMOLITION $
SCHEDULE B PART III OPTIONAL BUILDING/STRUCTURE DEMOLITION – SUBJECT TO AVAILABILITY OF FUNDS $
TOTAL PRICE_Inclusive of All Options $
CONTRACTOR NAME:
DUNS/SAM ID:
SCHEDULE B PART I
Asbestos-Containing Material Abatement Summary
B.2 SCHEDULE NOTES BASIS OF AWARD
Bidders shall enter an amount for each item. The Government intends to award one contract for the items listed to the Contractor who provides the best overall value to the Government. The Government reserves the right to award all, part or none of the contract.
| per ft2: |
| fill_3: |
| per day: |
| fill_8: |
| per ft2_2: |
| fill_10: |
| per ft2_3: |
| fill_12: |
| per ft2_4: |
| fill_14: |
| Text1: |
| LF: |
| fill_5: |
| per ft2_5: |
| fill_19: |
| per ft2_6: |
| fill_21: |
| fill_24: |
| fill_25: |
| fill_2: |
| fill_4: |
| fill_6: |
| fill_8_2: |
| fill_10_2: |
| fill_12_2: |
| fill_14_2: |
| fill_15: |
| fill_4_2: |
| fill_6_2: |
| fill_8_3: |
| fill_10_3: |
| fill_12_3: |
| fill_14_3: |
| fill_16: |
| fill_17: |
| fill_18: |
| fill_20: |
| fill_22: |
| fill_24_2: |
| fill_26: |
| fill_28: |
| fill_29: |
| fill_31: |
| fill_2_2: |
| fill_3_2: |
| fill_5_2: |
| fill_6_3: |
| fill_7: |
| fill_9: |
| fill_11: |
| fill_13: |
| fill_15_2: |
| fill_16_2: |
| Total price: |
| undefined: |
| undefined_2: |
| undefined_3: |
| TOTAL PRICEInclusive of All Options: |
| Text2: |
| Text3: |
| Text67: |
| Text68: |
| Text69: |
File details come from the government source that posted it. Updated .