This invitation for bid solicits offers for the Boykin Springs Parking Lot and Roadway Repairs project on the Angelina National Forest. The scope of work includes repairing 1.7 miles of Forest Service Road 313 with spot repairs and milling and overlay, replacing three culverts, and completely removing and replacing the parking lot for the recreational area. Other work includes removing two cattle guards, subgrade treatment with lime, aggregate base, rip rap, stabilized base, concrete curb and gutter, sidewalk, traffic markings, and signs. Bids are due by September 3, 2021. The contract will be a firm-fixed price awarded to the lowest priced responsive and responsible bidder. The project value is between $1 million to $5 million. The solicitation is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The Forest Service will issue the award. Work must be completed within 240 days of notice to proceed.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCT/ON NOTES:
THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, AND EQUIPMENT TO DEMOLISH THE
EXISTING PARKING LOT AND CONSTRUCT THE NEW PARKING LOT COMPLETE WITH DRAINAGE
STRUCTURES AS SHOWN. THE CONTRACTOR SHALL IMPLEMENT STORM WATER EROSION CONTROL
AS SHOWN ON THESE CONTRACT ORA WINGS AND SPECIFICATIONS. THE CONTRACTOR SHALL SEED
AND FERTILIZE ALL DISTURBED AREAS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCT/ON STAKING. ALL OTHER
SURVEYING NECESSARY FOR THE COMPLETION OF THIS PROJECT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE PROJECT SHALL BE STAKED FROM CONTROL POINTS ESTABLISHED BY
THE GOVERNMENT. THE CONTRACTOR SHALL PROTECT ALL CONTROL POINTS AND BENCH MARKS
AND SHALL RE -ESTABLISH ANY POINT OR MARK THAT IS DAMAGED OR DESTROYED BY THE
ACTIONS OF THE CONTRACTOR. NO SEPARATE PAYMENT WILL BE MADE FOR CONSTRUCT/ON
STAKING.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS TESTING REQUIRED HEREIN. NO SEPARATE PAYMENT WILL BE MADE FOR MATERIALS TESTING. SHOULD ANY REQUIRED TEST FAIL
TO MEET ALL CONTRACT REQUIREMENTS, THE CONTRACTOR SHALL BE REQUIRED TO PAY FOR
RE -TESTING.
GENERAL NOTES:
1. THE SPECIF/CA T/ONS THAT APPLY FOR THIS PROJECT ARE:
A. STANDARD SPECIFICATIONS FOR CONSTRUCT/ON OF ROADS AND BRIDGES ON FEDERAL
HIGHWAY PROJECTS FP-14 AND FP-14 FOREST SERVICE SUPPLEMENTAL
SPECIFICATIONS (FSSS).
B. TEXAS DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR
CONSTRUCTION AND MAINTENANCE OF HIGHWAYS, STREETS AND BRIDGES 2004 EDITION
AND SUPPLEMENTS THERETO, HEREINAFTER REFERRED AS TxDOT SPECS.
2. CONSTRUCTION WARNING SIGNS SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR
PRIOR TO BEGINNING CONSTRUCT/ON IN ACCORDANCE WITH PART 6 OF THE "MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES FOR STREET & HIGHWAY': PUBLISHED BY THE U.S.
DEPARTMENT OF TRANSPORTA T/ON, FEDERAL HIGHWAY ADMINISTRATION. BOYKIN SPRINGS WILL BE OPEN DURING CONSTRUCTION. RD. 313 SHALL BE PASSABLE AT ALL TIMES, EXCEPT TO ALLOW FOR CULVERT REPLACEMENTS AND PULLING CATTLEGUARDS. BOYKINS SPRINGS PARKING LOT SHALL BE
CLOSED DURING CONSTRUCTION.
3. LIMIT USE OF PREMISES TO AREAS WITHIN THE CONTRACT LIMITS IND/CA TED. DO NOT DISTURB
PORTIONS OF PROJECT SITE BEYOND AREAS IN WHICH THE WORK IS IND/CA TED. PROTECT
EXISTING IMPROVEMENTS & VEGETA T/ON THAT IS TO REMAIN DURING CONSTRUCT/ON.
4. EXISTING UTILITIES: THE EXISTENCE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES AND CONSTRUCT/ON IND/CA TED AS EXISTING ARE NOT GUARANTEED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE CORRESPONDING UTILITY COMPANIES FOR LOCATING
ALL EXISTING UNDERGROUND UTILITIES PRIOR TO THE CONSTRUCT/ON.
5. CONTRACTOR SHALL REMOVE EXISTING ASPHALT & CONCRETE CURB MATERIAL FROM THE
FOREST SERVICE PROPERTY AND RECYCLE. SURPLUS EXCAVATED MATERIAL MAY BE SCATTERED
OR STOCKPILED AS PER FOREST SERVICE REPRESENTATIVE DIRECTION.
6. CONTRACTORS SHALL SUBMIT ANY SHOP DRAWINGS REQUIRED HEREIN FOR REVIEW INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS OF INSTALLATION, AND ATTACHMENTS TO OTHER WORK.
ASPHALT CONCRETE & PAVEMENT NOTES:
1. ROADWAY VARIES, ACTUAL WIDTHS ARE SHOWN ON THE DRAWINGS.
2. ALL CONCRETE FOR ROAD, DRIVEWAYS, PARKING LOTS, AND DUMPSTER CONCRETE PAD SHALL BE TxDOT CLASS P CONCRETE AND SHALL HAVE A MINIMUM AVERAGE COMPRESS/VE STRENGTH
OF 4,400 PSI AT 28 DAYS.
3. CONCRETE FOR PRECAST CONCRETE C-CHANNEL CULVERT SHALL HAVE A MINIMUM AVERAGE
COMPRESS/VE STRENGTH OF 5,000 PSI AT 28 DAYS.
4. CONCRETE FOR SIDEWALKS, CURB, AND ANCHORS SHALL BE CLASS A CONCRETE AND SHALL
HAVE A MINIMUM AVERAGE COMPRESS/VE STRENGTH OF 3,600 PSI AT 28 DAYS EXCEPT WHERE
IT'S SHOWN ON THE DRAWING.
5. ALL REINFORCING STEEL FOR CONCRETE PAVEMENT SHALL BE GRADE #60 DEFORMED STEEL
BARS CONFORMING TO ASTM A-615 (GRADE 60) OR ASTM A-996 (GRADE 60).
6. ALL CURING MATERIAL SHALL BE TYPE 2 MEMBRANE CURING COMPOUND. ALL EPOXY SHALL
BE TYPE Ill EPOXY.
7. ALL JOINT SEALANTS AND FILLERS SHALL BE CLASS 5 AND CLASS 8 JOINT SEALANT
MATERIALS AND FILLERS UNLESS OTHERWISE SHOWN ON THE PLANS OR APPROVED BY
ENGINEERS.
8. CRUSHED LIMESTONE BASE SHALL MEET CURRENT TEXAS DEPARTMENT OF TRANSPORTATION
TYPE A, GRADE 1 AND SHALL BE PLACED AS PER REQUIREMENTS OF TxDOT SPECIF/CAT/ON
ITEM 247, COMPACTED TO AT LEAST 100% OF THE MAXIMUM DENSITY, AS DETERMINED BY
Tex-113-E.
9. CERT/FICA T/ON OF LIMESTONE QUALITY SHALL BE FURNISHED BY THE SUPPLIER PRIOR TO
PLACEMENT OF LIMESTONE.
10. THE CONTRACTOR SHALL PROOF ROLL CRUSHED AGGREGATE SURFACE PRIOR TO PLACEMENT
OF CONCRETE.
EROSION CONTROL NOTES:
1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO BEGINNING
EARTH DISTURBING ACTIVITIES.
2. SILT FENCE SHALL BE INSTALLED BEFORE CONSTRUCT/ON BEGINS. SILT FENCE SHALL BE
INSPECTED WEEKLY AND IMMEDIATELY AFTER STORM EVENTS TO ENSURE IT IS INTACT AND
NO GAPS OR TEARS. REPLACE THE SILT FENCE WHERE IT IS WORN, TORN, OR OTHERWISE
DAMAGED. REMOVE SEDIMENT WHEN IT REACHES ONE -THIRD OF THE HEIGHT OF THE FENCE.
SILT FENCE SHALL BE LEFT IN PLACE UNTIL THE UPSTREAM AREA IS PERMANENTLY
STABILIZED.
3. INSTALL ROCK CONSTRUCT/ON ENTRANCE. CONSTRUCT/ON ENTRANCE SHALL BE INSPECTED
WEEKLY AND AFTER STORM EVENTS OR HEAVY USE ROCK ENTRANCE SHALL BE MAINTAINED
IN A CONDITION THAT WILL PREVENT SEDIMENT TRACKING OFF -SITE. REPLENISH OR REPLACE
AGGREGATE IF IT BECOMES CLOGGED WITH SEDIMENT. THE ROCK CONSTRUCT/ON ENTRANCE
SHALL BE LEFT IN PLACE UNTIL THE CONCRETE PAVEMENT IS INSTALLED AT THE SITE.
4. TO CONTROL SOIL EROSION DURING CONSTRUCT/ON. ALL DISTURBED AREAS SHALL BE
CLEANED, GRADED, AND STABILIZED. ADDITIONAL EROSION CONTROL MEASURES MAY BE
REQUIRED DURING CONSTRUCT/ON IN ORDER TO CONTROL EROSION AND/OR OFFS/TE
SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCT/ON
IS COMPLETED AND THE SITE IS STABILIZED.
,. 9' ti")]�, V1 �>
(. �_,.J- �
�EP�
w u )2
[IO
w ffi mw I- 0:
m� ww
III
o5
IL 0
• m m
:J
:z f--u
0:::
f-- (J) :z u
0:::
f--
X (I.)
f--
C
-0 C
(_'.) � :z --+--' 0
- (/) I,_
� (I.)(_'.)
0::: I,_ <( 0
-0 o_ LL C
-0
(J) 0 "' C--+--' '-' 0 (/) (/):z •- (I.) 0 0::: � 2) X o_ :z LL (I.)
(J) f--o -
:z c 0 o-
- ·- c_
� (1.)00 >- 0,:,..., >
0 CO 0
CD <(:ZN
ffi Si'
PROJECT NO:
DESIGN BY: K. Greene
DRAWN BY: K. Greene
CHECKED BY: S. Lewis
Sheet Title
LOCATION AND
VICINITY MAPS