This is a Questions and Answers document for RFQ 12444026Q0141, an August 2, 2026 solicitation for automatic gate operator replacement and installation at the Alexandria Forestry Center in Pineville, Louisiana (2500 Shreveport Highway, Hwy 71, LA 71360).
The Government requires installation of a Lift Master Elite Series Model CSL24UL gate operator to replace existing equipment. The gate dimensions are 25 feet opening with 38 feet total length. Work must be completed within 30 calendar days from Award and Receipt Order (ARO). The existing gate panel, track, rollers, guide assemblies, chain, posts, and physical structure are serviceable and outside replacement scope except for operator-related mounting hardware. The contractor must retain and integrate the existing keypad and pedestal; existing exit and safety loops are to be reused. The system requires one closing-path photoelectric safety beam and one opening-path safety edge as the only external entrapment-protection devices. Exit-side gate activation is via remote transmitter. Electrical service is currently in place. The solicitation is a Total Small Business Set Aside with source selection via Lowest Priced Technically Acceptable (LPTA). Quotations must include completed SF1449 (page 1), Schedule of Items (page 2), firm-fixed price, technical approach, equipment models with cut sheets, surge-protection specifications, warranty information, and OEM traceability documentation for the operator only. Quotations must be emailed as PDF to richard.kandrach@usda.gov. Technical questions should be directed to robert.wilson3@usda.gov and contracting questions to richard.kandrach@usda.gov. The Government will document the CSL24UL specification as basis for evaluation under FAR Part 25 and does not require additional steps from offerors regarding Buy American treatment; however, if manufacture is confirmed outside the United States, offerors must list it as a foreign end product on FAR 52.225-2 certificate. Pre-quote site visits are available by contacting the Contracting Officer's Representative (COR) between 8:00 a.m. and 4:30 p.m., Monday through Friday. Work hours are 0800-1630 and the gate may be closed during installation if needed. No Louisiana-specific licensing or permits are required. The contractor is responsible for reasonable replacement and reconnection of all electrical components.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12444026Q0141 QUESTIONS AND ANSWERS
07/10/2026 Q: Can you provide photos of existing gate/operator setup?
A: posted to sam.gov
07/13/2026 Q: clarification regarding the specific motors required providing manufacturer’s name and exact model or part number for each motor listed?
A: Lift Master Elite Series Model CSL24UL
Q: confirming address location A: 2500Shreveport Highway (Hwy 71), Pineville LA 71360, Alexandria Forestry Center Supervisors Officer
07/15/2026 Q: confirm where the existing exit and or safety loops, including the loop wires or exit devises are intended to be reused, or where they need to be replaced as part of this requirement?
A: use existing
Q: Photos of existing gate and operator A: see sam.gov solicitation attachment for photos
Q: Existing gate operator manufacturer and model info A: A: Lift Master Elite Series Model CSL24UL
07/22/2026 Q: clarify exit side gate activation method?
A: remote transmitter
Q: arrange a site visit A: yes contact COR
Q: deliver to FOR Destination?
A: yes
Q: Gate Dimensions?
A: Opening is 25’ the total length is 38’
07/23/2026 Q: The solicitation references the LiftMaster CSL24UL gate operator. If an offeror proposes an American-made equivalent that meets or exceeds all required specifications, would that be considered acceptable?
A: keep the same
Q: How should the Buy American requirements be applied to the referenced gate operator and any proposed equivalent products?
A: documentation on your offer
07/24/2026 Q: The solicitation’s Questions section identifies Jon.Smith@usda.gov and a November 15, 2025 deadline in Pacific Time. Please confirm the correct questions contact and current questions deadline for this August 2, 2026 RFQ.
A: tech questions: robert.wilson3@usda.gov & contracting questions: richard.kandrach@usda.gov, yes this date is correct
Q: Please confirm the required quotation-submission method and recipient email address. The package does not appear to contain complete final submission instructions.
A: Email Offers to richard.kandrach@usda.gov
Q: The Government attached the LiftMaster CSL24UL installation manual, while the SOW states that equivalent equipment meeting or exceeding the requirements may be provided. Is the CSL24UL the required brand/model, the basis of design, or only a reference? Must an alternate be approved before quotation submission, or may compliance documentation be submitted with the quotation?
A: We want the LiftMaster CSL24UL.
Q: Please provide or confirm the existing gate’s approximate length, weight, travel distance, and operating speed so offerors can validate operator capacity.
A: 25’ opening 38’ total length.
Q: Please confirm the electrical service currently available at the operator, including voltage, phase, circuit amperage, disconnect arrangement, grounding condition, and whether the existing service is believed adequate for the replacement operator.
A: Electret service is in place.
Q: Which existing access-control components are to be retained and integrated, including keypad, card reader, receiver, remote transmitters, pedestal, vehicle loops, exit devices, telephone entry, or other controls? Please identify any components that must be replaced A: Keypad and pedestal.
Q: Please confirm whether the existing gate panel, track, rollers, guide assemblies, chain, posts, and physical gate structure are considered serviceable and outside the replacement scope except for operator-related mounting hardware.
A: Yes, considered serviceable.
Q: Is a pre-quote site visit available or required? If available, please provide the date, time, RSVP instructions, access requirements, and onsite point of contact.
A: contact the COR 8:00 a.m. and 4:30 p.m. Monday – Friday.
Q: Please confirm normal work hours, site-security requirements, traffic-control requirements, temporary gate-security expectations, and whether the entrance must remain operational during installation.
A: 0800 /1630 gate can be closed if needed.
Q: Does the Government require a Louisiana-licensed electrical contractor, gate contractor, or specific permits/inspection approvals? If so, please identify the applicable licensing and permitting requirements known to the Government.
A: No.
Q: The SOW requires one closing-path photoelectric safety beam and one opening-path safety edge. Please confirm whether these are the only required external entrapment-protection devices or whether the installed system must include additional UL 325 devices based on field conditions and manufacturer requirements.
A: Yes, only requirement.
Q: Please confirm the quantity and type of remote transmitters, keypads, credentials, or other user-control devices that must be provided, programmed, or reused.
A: One keypad.
mailto:Jon.Smith@usda.gov mailto:robert.wilson3@usda.gov mailto:richard.kandrach@usda.gov mailto:richard.kandrach@usda.gov
Q: Please clarify whether the Certificate of Conformance and OEM traceability requirement applies to the complete installed gate system, the operator only, or every major component including the safety devices and surge protective device.
A: Just the operator.
Q: The SF1449 lists delivery September 1, 2026 and a period of performance from September 1 through September 30, while the SOW requires completion within 30 calendar days after Notice to Proceed. Please confirm which schedule governs if award or NTP occurs on a different date.
A: 30 Days from ARO
Q: The solicitation includes Service Contract Wage Determination 2015-5175, Revision 30, for Grant and Rapides Parishes. Please identify the labor classification(s) the Government expects for automatic-gate installation and associated electrical work, or confirm that the contractor should use the most appropriate listed classification and request conformance if necessary A: Total Small Business Set Aside, this is vendor responsibility
Q: If existing facility electrical conditions prevent proper operation and the contractor promptly notifies the COR as required, please clarify how testing, acceptance, schedule, and any required modification will be handled.
A: We will do a mod that if needed.
Q: Please confirm the minimum quotation contents. Our reading is that a responsive package should include the completed/signed SF1449 and Schedule of Items, firm-fixed price, technical approach and schedule confirmation, proposed equipment models and cut sheets, surge-protection specifications, warranty information, OEM traceability/COC support, assumptions/exceptions, and past-performance information. Please advise if any additional certifications, forms, page limits, or file-format requirements apply.
A: Fill out the SF1449 page 1, Schedule of Items (SOI) page 2 of solicitation, email as PDF to richard.kandrach@usda.gov
07/27/2026 Q: We are confirming the country of manufacture for the CSL24UL directly with LiftMaster/Chamberlain Group. If the manufacturer confirms the unit is not manufactured in the United States, please confirm that offerors should list the CSL24UL as a foreign end product on the FAR 52.225-2 certificate, and that an accurately certified offer for the specified unit will remain eligible for award.
A: Yes, this should be documented on the Quote as such
Q: Since the CSL24UL is specified by the Government to match existing installed equipment, will the contracting office document this as the basis for evaluation under FAR Part 25 (e.g., nonavailability of an acceptable domestic alternative), or should offerors take any additional steps in their proposals to address this?
A: No additional steps required, if my COR Robert Wilson says the proposal is Technically Acceptable, we will perform source selection utilizing Lowest Priced Technically Acceptable (LPTA)
Q: If any amendment to the solicitation is planned to address the Buy American treatment of the specified unit, could you let us know by Wed Jul 29, so offerors can incorporate it before the August 2 due date?
A: not at this time, as previously stated this needs to be documented on the Offeror for Tech Review
Q: Please confirm whether the contractor is responsible only for disconnecting, reconnecting, and completing the electrical work directly required for the new gate operator, controls, safety devices, and surge protection, or whether the contractor must also repair, replace, or modify any upstream facility electrical distribution equipment.
A: The contract is reasonable for replace and reconnections all components.
Q: Please confirm whether the complete clarification set will be posted by amendment or Q&A through SAM.gov so the responses become part of the common solicitation record. Any item not addressed in the posted or written response will remain unresolved for Kcamow’s T-1 decision.
A: Q&A to be posted to sam.gov