Revitalization of El Portal Visitors Center 26 February 2019 El Yunque National Forest Rio Grande, PR
Statement of Work for DB Services Page 1 of 88
DESIGN BUILD PROJECT SCOPE
for
Revitalization of El Portal Visitors Center Building and Site
El Yunque National Forest
Rio Grande, PR
FEBRUARY 2019
Statement of Work for DB Services Page 2 of 88
Table of Contents
Section A: Solicitation/Contract Form
1. Under Separate Cover
Section B: Supplies or Services and Prices/Costs
1. Bid Schedule
Section C: Statement of Work
1. Project Information
2. General Requirements
3. Project Summary
Section D: Packaging and Marking
1. Not Used
Section E: Inspection and Acceptance
1. Progress Payments
Section F: Deliveries or Performance
1. Schedule
2. Project Meetings
Section G: Contract Administration Data
1. Not Used
Section H: Special Contract Requirements
1. Reference Standards
2. Special Design Requirements
3. Design Imperatives
4. Integrated Design Principals
5. Facility Performance
6. Elements and Products
7. Technical Requirements
8. Sustainability Requirements for Design
9. Sustainability Requirements for Construction
10. Minimize Construction Impacts
11. Schedule of Values
12. Construction Support
13. Submittals during Construction
14. Construction Project Information System (CPMIS) Functional Requirements
15. Construction Coordination
16. Digital Images
17. Quality Control
Statement of Work for DB Services Page 3 of 88
18. Working Hour Restrictions
19. Temporary Services
20. Access
21. Preservation of Adjacent Features
22. Existing Utilities
23. Hauling Restrictions
24. Accident Prevention
25. Temporary Controls
26. Field Engineering
27. Project Closeout
28. Substantial Completion and Final Inspection:
Section I: Contract Clauses
Section J: List of Attachments
1. Data and Materials to be provided by the USDA Forest Service
Section K: Representations, Certifications, and other Statements of Offerors or Respondents .74
Section L: Submission Instructions
1. General
2. Format Requirements
3. Volume I - Technical and Management Quote
4. Volume II - Price Quote
5. Questions and Clarifications
Section M: Evaluation Factors for Award
1. Evaluation Criteria
2. Evaluation Ratings
3. Best Value/DBC Selection and Award Approval
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
USDA FOREST SERVICE
SOUTHERN REGION
1720 PEACHTREE RD SW SUITE 876 SOU
ATLANTA GA 30309-2449
43ZP
CHRISTOPHER J FORD
cjford@fs.fed.us 1720 Peachtree Rd NW, Suite 700 South Atlanta, GA 30309
CHRISTOPHER FORD (404)347-1635
1x 02/27/2019
1243ZP19R0003
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Design Build Revitalization of El Portal Visitors Center Building and Site
The USDA Forest Service Southern Region El Yunque National Forest (Puerto Rico) intends to solicit proposals for the award of a design build contract. Design¿build (or design/build, and abbreviated D¿B or
D/B accordingly) is a project delivery system used in the construction industry. The project will consist of the design and reconstruction of the El Portal Visitors Center
Building and Site. The project includes multi-disciplinary design based upon a USDA
Forest Service-provided conceptual design, which will be finalized into a complete set of construction drawings, specifications, schedule of items, and construction cost estimates, and includes the building and site design that is compliant with all building codes, agency space policy, security requirements, and agency requirements as outlined.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 730 calendar days and complete it within ________________ ________________ calendar days after receiving
04/04/2019
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
SOUTHERN REGION
1720 PEACHTREE RD SW SUITE 876 SOU
ATLANTA GA 30309-2449
43ZP
CHRISTOPHER J. FORD
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 85
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1243ZP19R0003
Delivery: 730 Days After Notice to Proceed
Delivery Location Code: F31B
USDA FOREST SERVICE
EI YUNQUE CATALINA SERVICE CENTER
ROAD 191 KM 44
PALMER PR 00721 US
FOB: Destination
Period of Performance: 04/30/2019 to 05/30/2021
001 DESIGN PHASE
Product/Service Code: Y1AB
Product/Service Description: CONSTRUCTION OF
CONFERENCE SPACE AND FACILITIES
002 CONSTRUCTION PHASE
Product/Service Code: Y1AB
Product/Service Description: CONSTRUCTION OF
CONFERENCE SPACE AND FACILITIES
003 BID ADDITIVE NO. 1 Design for New Parking Lot and
Support Facility for Forest Transportation Plan
(Option Line Item)
Product/Service Code: Y1AB
Product/Service Description: CONSTRUCTION OF
CONFERENCE SPACE AND FACILITIES
004 BID ADDITIVE NO. 2 Construction of New Parking
Lot and Support Facility for Forest
Transportation Plan
(Option Line Item)
Product/Service Code: Y1AB
Product/Service Description: CONSTRUCTION OF
CONFERENCE SPACE AND FACILITIES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Statement of Work for DB Services Page 6 of 88
SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS
1. Bid Schedule
A. CONTRACT LINE ITEM NO. 1 – Design Phase
1) The intent of this section is to explain, in general, what is included in each contract line item, limits or cut-off points where one item ends and another begins. If no item exists for a portion of the work, include the costs in a related line item.
a) Design Kick-Off Meeting and Site Visit.
b) Conceptual Design Verification Documents.
c) Design Development Documents.
d) Draft Construction Documents.
e) Complete Stamped and Signed Construction Documents.
f) Other (describe).
B. CONTRACT LINE ITEM NO. 2 – Construction Phase
1) Provide line items in a format that coincides with proposed Schedule of Values that will serve as the basis for payment requests.
a) Site Work.
b) Parking Lot and Access Roads.
c) Utilities.
d) Renewable Energy infrastructure.
e) Boardwalk Replacement.
f) Gift Shop.
g) Restroom Facility.
h) Main Gallery.
i) Café Pavilion.
j) Events Pavilion.
k) Exhibit Pavilion.
l) Other (describe).
C. BID ADDITIVE NO. 1 – Design for New Parking Lot and Support Facility for Forest Transportation Plan
D. BID ADDITIVE NO. 2 – Construction of New Parking Lot and Support Facility for Forest Transportation Plan
1) Provide line items in a format that coincides with proposed Schedule of Values that will serve as the basis for payment requests.
a) Parking for approximate 200 vehicles.
b) Infrastructure and facilities for parking lot (restroom building, lighting, trash receptacles, directional signage, etc).
Statement of Work for DB Services Page 7 of 88
c) Covered Kiosks that can also double as Bus Pick-up/Drop-off points.
d) Pedestrian connectivity to El Portal Visitors Center.
e) Connectivity to Fee Collection Facility.
f) Smooth traffic flow with Highway 191 and El Portal Visitors Center.
Statement of Work for DB Services Page 8 of 88
SECTION C: STATEMENT OF WORK
1. Project Information
A. Administrative Information:
1) Project Name: Revitalization of El Portal Visitors Center Building and Site.
2) Project Number: To be determined.
3) Unit Name: El Yunque National Forest.
4) Unit Number: 0816
B. USDA Forest Service Points of Contact:
1) Contracting Officer (CO): Christopher J. Ford, P: 404.347.1635, E:
Christopher.ford@usda.gov.
2) Project Manager (PM) and Contracting Officer’s Representative (COR):
Christine D. Shope, P: 404.347.2526, E: Christine.shope@usda.gov.
C. Region 8 Address:
United States Department of Agriculture
Forest Service
Southern Region Engineering
1720 Peachtree Street, NW
Suite 716 North
Atlanta, Georgia 30309
2. General Requirements
A. Scope:
1) In accordance with the terms and conditions of the Contract, the Design-Build Contractor (DBC) shall perform the work of this Request for Proposal (RFP) for the USDA Forest Service as described below.
2) All Architect-Engineer (A-E) Services required in this RFP shall be performed by licensed Architects and Engineers registered in Territory of Puerto Rico.
3) The A-E remains fully responsible for determining if the standards or provisions cited below have been revised or updated. Any such conflicts between the website and the identified standard or provisions shall be brought to the attention of the Contracting
B. Contract Magnitude (Funding Limitations):
1) The DBC Team is responsible for providing all design and construction services required for the final total lump-sum firm-fixed amount negotiated with the DBC.
The total contract amount for all design and construction services is estimated to be between $10,000,000 and $15,000,000.
C. Location:
1) This project is located at PR-191 & PR-988, Mameyes II, Rio Grande, Puerto Rico 00745 (18.338499, -65.761006).
mailto:Christopher.ford@usda.gov mailto:Christine.shope@usda.gov
Statement of Work for DB Services Page 9 of 88
2) The address is HC-01, Box 13490, Rio Grande, PR 00745-9625.
D. Background:
1) El Portal Rain Forest Center (El Portal) is the major visitor center of El Yunque National Forest on the island of Puerto Rico. First opened in 1996, the need to update and revitalize the visitor center is a priority for El Yunque National Forest and its partners.
2) In September 2017, Hurricanes Irma and Maria, both rated most extreme storms by Saffir-Simpson Hurricane wind scale, impacted Puerto Rico and the USVI. El Yunque National Forest was devastated by these events causing severe damage to facilities, roads, centenary trees uprooted, and loss of power and water. The damage was significant throughout the Forest, and it is believed that recovery will last years.
3) The USDA Forest Service Region 8 issued a Task Order to perform a Hurricane Damage Assessment at El Portal Visitor’s Center located on the El Yunque National Forest in Puerto Rico. The work consisted of a Site Visit, a Condition Assessment, Documentation and Executive Summary, including short- and long-term recommendations for repair and restoration of storm damaged facility. This report, dated October 2017, will serve as the back ground and baseline assumption for existing conditions at the El Portal facility.
4) In May 2018, the USDA Forest Service conducted a Design Charrette to revisit previous developed concepts and integrate best practices and lessons learned into a charrette report, El Portal and Catalina Project Programming, dated 27 July 2018. This programming report will serve as the basis of design and starting point for this project.
5) In August 2018 the USDA Forest Service issued the El Portal Visitor & Community Center Interpretive and Exhibit Plan Concepts stating the intent is for all exhibits, programs, and events to create an enhanced appreciation of El Yunque Forest and the many local connections to the land. Goals for this revitalization include:
a) Cultural arts, heritage and connection to local communities. Puerto Ricans have expressed a desire to and share cultural experiences and local stories with visitors coming to the island. Tourism professionals and travelers express a desire to engage with local people and the culture heritage of Puerto Rico.
b) World class displays and interpretive exhibits. The new exhibits need to be engaging, dynamic and part of the visitor experience at the center. Location of exhibits should be considered in the context of how it will complement the cultural connections, attract the visitor, and withstand high humidity, heat, and hurricanes.
c) Making El Portal community center and an introduction to El Yunque.
Various options to spread out community activities and visitor engagement are introduced along with areas targeted for specific activities.
d) Stronger collaboration with IITF (International Institute of Tropical Forestry).
Work together to incorporate new research findings into visitor center programming and use citizen science to gain support for IITF that allows expansion of partnership and a volunteer docent program.
Statement of Work for DB Services Page 10 of 88
6) El Portal will continue to serve as the portal visitor center gateway into El Yunque National Forest with a focus on collaborative design, programming, and management in cooperation with partners and community members. El Portal will provide visitor orientation and information, exhibits, audiovisual viewing opportunities, education opportunities, live and lived demonstrations and docent programs. Interpretive themes, goals, and objectives established in this document will serve as the basis for exhibit development and the establishment of priorities.
3. Project Summary
A. The project will consist of the design and reconstruction of the El Portal Visitors Center Building and Site. The project includes multi-disciplinary design based upon a USDA Forest Service-provided conceptual design, which will be finalized into a complete set of construction drawings, specifications, schedule of items, and construction cost estimates, and includes the building and site design that is compliant with all building codes, agency space policy, security requirements, and agency requirements as outlined. Upon final approval of the Complete Stamped and Signed Construction Documents, the building and site shall be constructed as designed and specified, according to all applicable law and requirements.
B. The project will include, but not be limited to, the following:
1) Review the data and material provided in the RFP package.
2) Review site data.
3) Perform life cycle cost analysis.
4) Provide updated survey.
5) Upon award, determine and provide design schedule of work.
6) Perform geotechnical analysis as necessary.
7) Perform soil percolation tests as necessary.
8) Submit list of required permits.
9) Analyze site, site utilities, building and foundation system
10) Submit Conceptual Design, Design Development and Construction Documents for review and approval, as required
11) Provide schedule of construction work.
12) Secure work area and provide for continued access to the facility.
13) Construct project.
14) Create and provide operations and maintenance manual.
15) Provide As-Constructed drawings.
C. Design work shall include, but not be limited to, the following:
1) Building Interior:
a) Renovation of interior space per “Design Guidelines for USDA FOREST SERVICE Facilities,” and Design Charrette documents modified by approved conceptual Test-Fit Floor Plans provided by the USDA FOREST
Statement of Work for DB Services Page 11 of 88
SERVICE, including but not limited to, all interior walls, ceilings, permanent fixtures and finishes, casework and signage.
b) Repairs and modifications to structural building elements as necessary and to include for new elevator as indicated in Test-Fit Floor Plans provided by
USDA FOREST SERVICE.
c) Complete replacement of existing HVAC system. Provide higher-efficiency options for replacement systems. Explore options for reduced operation for ventilation and dehumidification only during extended periods when facility is without primary power.
d) Complete replacement of existing Electrical system including fixtures.
Provide ability to monitor power consumption remotely.
e) Complete Lightning Protection system as required by code.
f) Complete replacement of existing Plumbing system including capacity to support new fixtures and additional restrooms at the Pavilion Level. Provide ability to monitor water consumption.
g) Complete replacement of existing Communications and Data systems per CIO requirements document.
h) Complete replacement of existing Fire Alarm and Detection system.
i) Complete Sprinkler and Fire Suppression System as required by code.
j) Complete replacement of existing Security and Access control system.
Work shall be compliant with HPSD direction and use of USDA LincPass system.
k) Complete Public Address System.
2) Building Exterior:
a) Replace all exterior doors, windows, and hurricane shutters. Doors and windows shall be high-efficiency and impact resistant. Shutters shall be motor driven with manual override.
b) Repair and paint building shell with similar stucco finish.
c) Repair and/or replace soffits and fascia.
d) New surface-mounted lights and fixtures.
e) Replacement/painting of all handrails, metal components, and building appurtenances.
3) Site Work:
a) Site design shall reflect modifications shown on the approved Conceptual Site Plan provided by the USDA Forest Service.
b) Replace Electrical Service to building from secondary point of connection (transformer), underground, to building, including and automatic transfer devises required to integrate backup and future renewable energy systems.
c) Replace the diesel powered backup power system.
d) Evaluate options to use renewable energy sources as the primary power to the site during the Design Development phase. Provide necessary site
Statement of Work for DB Services Page 12 of 88 improvements to facilitate use of renewable energy system selected during Design Development as the site’s primary power energy source.
Connection to the existing utility grid shall remain, and back-up generator system design shall be capable of providing full power to the facility.
e) New construction shall be “Solar Ready.” Evaluate Considerations include, but are not limited to:
(1) Maximize unshaded, south-facing roof space.
(2) Minimize and group roof obstructions.
(3) Design extra roof load capacity and specify long-lasting roofing materials.
(4) Pre-install roof conduit to facilitate easy installation.
(5) Plan space for inverters.
(6) Plan for a “PV Main Service” upstream of the main distribution breaker.
(7) Consider locations for battery storage.
f) New exterior site lighting.
g) New sidewalks.
h) Connect to new trail between Catalina to El Portal facilities as shown on Conceptual Site Plan.
i) Provide sanitary sewer service. Work shall evaluating the condition of the connection to the public owned sewer service and recommending any repairs or upgrades necessary for new design.
j) Redesign and upgrade all site access and parking.
k) Provide storm water system to accommodate new parking lot, sidewalk, ancillary concrete pads and building drainage. New design shall provide positive drainage away from the building at all exterior walls.
l) New Parking Lot and Support Facility for Forest Transportation Plan.
4) Work excludes interior modular walls and furniture, perimeter fencing, and potable water service to building.
Statement of Work for DB Services Page 14 of 88
SECTION E: INSPECTION AND ACCEPTANCE
1. Progress Payments
A. Design Phase: Progress payments during the design phase of the work will be based on submission, review, and acceptance of design deliverables.
B. Construction Phase: Progress payments during construction will be based on the percentage of work completed on items listed on the approved schedule of values.
Actual construction completed and in place will form the basis for payment.
Verification of the % complete shall be initiated by the DBC under the direction of a representative of the CO, unless the CO waives this requirement in a specific instance. The DBC shall make the computations for payment based on the governments verification of work completed and in place for any periods for which progress payments are requested.
C. The DBC shall furnish the originals of all field notes and all other records relating to the basis for payment, to the CO, who shall use them as necessary to determine the final amount of progress payments. The DBC shall retain copies of all such material furnished to the CO.
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements (APR 1984)
52.246-12 Inspection of Construction (AUG 1996)
52.246-21 Warranty of Construction (MAR 1994)
Statement of Work for DB Services Page 15 of 88
SECTION F: DELIVERIES OR PERFORMANCE
1. Schedule
A. Design Phase:
1) General: All documents shall be prepared using the English System of Weights and Measurements and shall be prepared in accordance with the USDA Forest Service Design Standards.
2) Design Kick-Off Meeting and Site Visit:
a) The Design Kick-Off Meeting and Site Visit shall be conducted at the project site no later than fifteen (15) days after issuance of the Notice to Proceed (NTP).
3) Conceptual Design Verification Documents (CDV):
a) The CDV Documents shall be submitted no later than fifteen (15) calendar days after Design Kick-Off Meeting and Site Visit and shall verify direction received and decisions made during the Design Kick-Off Meeting.
b) Deliverables: The following deliverables are required for USDA Forest Service Review.
(1) Drawings: Floor Plans, Exterior Elevations, major Building Sections and relevant Wall Sections.
(2) Proposed LEED Checklist.
(3) Draft Design Narrative.
(4) Draft Energy Model
(5) Upload PDFs of all documents submitted to designated folder on USDA Forest Service Box Site.
c) Government Review: The USDA Forest Service Review shall be completed no later than fifteen (15) calendar days after submission of Conceptual Design Verification Documents.
4) Design Development Documents (DD):
a) The DD Documents and written responses to the USDA Forest Service Conceptual Design Document Review Comments to be submitted no later than thirty (30) calendar days after receipt of USDA Forest Service Review CDV Review Comments.
b) Deliverables: The following deliverables are required for USDA Forest Service Review.
(1) Design Development Drawings.
(2) Divisions 2 through 49 Outline Specifications.
(3) Product File.
(4) Draft LEED Checklist and explanation of compliance strategy or approach.
(5) Revised Design Narrative.
(6) Revised Energy Model.
Statement of Work for DB Services Page 16 of 88
(7) Written responses/resolutions to all USDA Forest Service CDV Review comments.
(8) Upload PDFs of all documents submitted to designated folder on USDA Forest Service Box Site.
c) Government Reviews:
(1) As a part of the DD Review, the USDA Forest Service will perform a formal Value Analysis (VA) that produces recommendations for accomplishing the project goals. The deciding officials choose which of the VA team's recommendations to implement, and they will be included in the USDA Forest Service comments. The comments generated by the VA have the potential to generate significant changes to the DDs.
(2) The DD Review will also include a review by the El Portal Interpretive Team to verify the adequate physical and utility infrastructure necessary for the exhibit design is included in the DD Documents. These comments will be included in the USDA Forest Service comments. The comments generated by the El Portal Interpretive Team have the potential to generate changes to the DDs.
(3) The DD Review will also include review by an engineering team and National Renewable Energy Lab Integrated Applications Center (NREL) Renewable Energy Recommendations. The comments generated by NREL have the potential to generate changes to the DDs.
(4) The intent is for El Portal to be designed as ‘Solar Ready.’ The NREL recommendations will include but not be limited to concepts referenced in the following source documents. The DD Documents shall reflect a thorough understanding of and planning for the ‘Solar Ready’ concepts described herein.
(a) Microgrid-Ready Solar PV - Planning for Resiliency.
(b) Solar Ready Buildings Planning Guide.
(c) Solar Ready: An Overview of Implementation Practices.
5) Draft Construction Documents (DCD):
a) All DD Review comments shall be addressed and incorporated in the Construction Documents. Written responses to the USDA Forest Service Design Development Review Comments to be submitted no later than fifteen (15) calendar days after the Design Development Review Conference.
b) Draft Construction Documents submitted no later than sixty (60) calendar days after the Design Development Review Conference.
c) Deliverables: The following deliverables are required for USDA Forest Service Review.
(1) Final Construction Drawings.
(2) Final Divisions 2 through 49 Construction Specifications organized utilizing Construction Specifications Institute (CSI) MasterFormat 2004
Statement of Work for DB Services Page 17 of 88
Edition. DBC shall utilize and modify their own Divisions 2 through 49 Construction Specifications templates.
(3) Final Product File.
(4) Final Design Calculations.
(5) Final LEED Checklist and finalized compliance strategy or approach.
(6) Final Design Narrative.
(7) Final Energy Model
(8) Written responses/resolutions to all USDA Forest Service DD Review comments.
(9) Upload PDFs of all documents submitted to designated folder on USDA Forest Service Box Site.
d) Government Review: USDA Forest Service Review shall be completed no later than fifteen (15) calendar days after receipt of Draft Construction Documents.
6) Complete Stamped and Signed Construction Documents (SCD):
a) Complete Stamped and Signed Construction Documents and written responses to the USDA Forest Service DCD Review comments submitted no later than fifteen (15) calendar days after receipt of USDA Forest Service Draft Construction Document review comments.
b) Address and incorporate DCD Review comments into the Complete Stamped and Signed Construction Documents and submit, for approval, per the following table, the record set of Complete Stamped and Signed Construction Documents for construction, USDA Forest Service archiving and general use.
COMPLETE STAMPED AND SIGNED DB
CONSTRUCTION DOCUMENTS
ELECTRONIC
FORMATS *
HARDCOPY
FORMATS
Construction Drawings REVIT 2018 Full-Size (ANSI D)
Divisions 2 through 49 Construction Specifications
PDF/MS-Word N/A
Product File PDF N/A
Design Calculations PDF N/A
LEED Checklist PDF N/A
Design Narrative PDF N/A
Energy Model PDF N/A
Supplemental Design Reports (if applicable) PDF N/A
Written Responses to the Review Comments PDF/MS-Excel N/A
c) After acceptance of the Complete Stamped and Signed Construction Documents, the USDA Forest Service will issue a Notice to Proceed for the Construction Phase.
B. Construction Phase:
Statement of Work for DB Services Page 18 of 88
1) Construction shall be completed no later than five hundred and forty (540) calendar days after acceptance of the Complete Stamped and Signed Construction Documents.
C. Project Schedule:
1) General: The DBC shall provide two (2) color copies and one electronic copy of the project schedule after award and before the design meeting. The schedule shall include a detailed design phase with design deliverable submission dates, review periods as well as a summary construction schedule with important milestones included for both phases.
2) Development and Updates: Fully develop the construction portion of the schedule and submit to the CO before the Preconstruction meeting or any construction begins. The project schedule shall be updated on a monthly basis throughout the entire contract period and until project substantial completion.
The status date of each schedule update shall be 10 days before the progress payment request date.
3) Purpose: The purpose of the project schedule is to ensure adequate planning, coordination, scheduling, and reporting during execution of design and construction activities of the DBC. The project schedule will assist the DBC and the CO in monitoring the progress of the work, evaluating proposed changes, and processing the DBC's monthly progress payment requests.
4) Software: The software shall be the latest version of Microsoft Project, Primavera Project Planner, SureTrak, or approved equal.
5) Schedule Development: The project schedule shall cover the entire contract period. The late finish date of the project schedule shall be the same date as the established completion date of the contract.
6) The DBC shall use the Critical Path Method (CPM) with limited use of lead or lag durations between schedule activities. The DBC's project schedule shall consist of procurement activities (including mobilization, submittal, and the fabrication and delivery of key and long-lead procurement items) and construction activities.
7) The DBC's project schedule shall consist of, but not be limited to, the following for each activity:
a) Identify each and every activity number with numerical.
b) Concise description of the work represented by the activity (maximum 48 characters). Avoid the use of non-standard abbreviations. The work related to each activity shall be limited to one work trade.
c) Activity duration in whole working days, except for non-construction activities including mobilization, shop drawing and sample submittals, fabrication of materials, delivery of materials and equipment, and concrete curing.
8) In developing the project schedule, the DBC shall be responsible for ensuring that subcontractor work at all tiers, as well as its own work, is included in the project schedule.
9) The project schedule, as developed, shall show the sequence and interdependence of activities required for complete performance of the work.
The DBC shall be responsible for ensuring all work sequences are logical and
Statement of Work for DB Services Page 19 of 88 the project schedule shows a coordinated work plan. Proposed durations assigned to each activity shall be the DBC's best estimate of time required to complete the activity considering the scope and resources planned for the activity. Resource loading of each activity shall list all personnel by labor category and equipment type and capacity proposed to complete the activity in the duration shown. Include permit requirements and constraints. Seasonal weather conditions shall be considered and included in the planning and scheduling of all work influenced by high or low ambient temperatures, wind and/or precipitation to ensure completion of all work within the contract time.
D. Project Schedule Updates:
1) Monthly Updates: The monthly updating of the Project Schedule shall be an integral part and basic element of the estimate upon which progress payments shall be made under this contract. If, in the judgment of the CO, the DBC fails or refuses to provide a schedule of values and a complete schedule update or revision as specified hereinafter, the DBC shall be deemed to have not provided the required information upon which the progress payment may be made, and shall be subject to retainage of a portion of the payment.
2) Time Impact Analysis for Contract Modifications, Changes, Delays, and DBC Requests Requirements: When contract modifications or changes are initiated, delays are experienced, or the DBC desires to revise the project schedule, the DBC shall submit to the CO a written time impact analysis illustrating the influence of each modification, change, delay, or DBC request on the contract time.
3) Time Extensions: Activity delays shall not automatically mean that an extension of the contract time is warranted or due the DBC. It is possible that a modification, change, or delay will not affect existing critical activities or cause non-critical activities to become critical. A modification, change, or delay may result in only absorbing a part of the available total float that may exist within an activity chain of the project schedule, thereby not causing any effect on the contract time. Time extensions will be granted in accordance with the terms of the contract.
4) Float: Float is not for the exclusive use or benefit of either the USDA Forest Service or the DBC. Extension of the contract time will be granted only to the extent the equitable time adjustments to the activity or activities affected by the modification, change, or delay exceeds the total (positive or zero) float available on a particular activity.
E. All Conceptual Design Verification, Design Development, Construction Documents and As-Constructed Drawings shall be submitted to the USDA Forest Service Project Manager.
1) As-Constructed Drawings shall be completed no later than twenty-one (21) calendar days after Project Completion.
2. Project Meetings
A. Design Kick-Off Meeting and Site Visit:
1) After the award of the contract and acceptance of the Performance and Payment bonds, the CO will arrange a Design Kick-Off Meeting with the DBC.
a) Location: Project site.
Statement of Work for DB Services Page 20 of 88
b) Duration: Five (5) days.
2) Purpose and Expected Outcome: The Design Kick-Off Meeting will be conducted to confirm architectural programming, interview key stakeholders, document site and program constraints and confirm final SOW.
3) Meeting Minutes: The DBC shall keep minutes of all items discussed and decisions made. Meeting Minutes shall be forwarded to the USDA Forest Service for review and approval.
4) The Meeting Agenda shall include the following as a minimum:
a) Review and emphasize the project needs and design objectives.
b) Geotechnical Investigations and other testing services that may be required.
c) Permit documents preparation and expediting for NPDES, DOT, and others as needed.
d) Topographic surveys as needed for site design, grading and hydrology study/plans and calculations.
e) Environmental and sustainability requirements.
f) Commissioning (review requirements in ASHRAE 0-2005 paragraphs 6 and 7.)
g) Schedule of Values.
h) Design schedule two (2) hard copies. Note: No portion of the work can begin construction until Complete Construction Documents are approved for that portion and any other portion of the work that may be affected by it.
i) Modifications during design.
j) Submittals during design.
k) Areas available for use by the DBC.
l) Access requirements.
m) Natural and Cultural Resource Protection.
n) Payments to the DBC.
B. Design Development Review Conference:
1) After the receipt of the DD Documents and subsequent DD Reviews by the Government, the CO will arrange a Design Development Review Conference with the DBC.
a) Location: Project site.
b) Duration: Five (5) days.
2) Purpose and Expected Outcome: The Design Development Review Conference will be conducted to review all Government Design Development Review Comments to answer and clarify any questions or issues.
3) Meeting Minutes: The DBC shall keep minutes of all items discussed and decisions made. Meeting Minutes shall be forwarded to the USDA Forest Service for review and approval.
Statement of Work for DB Services Page 21 of 88
C. Preconstruction Meeting:
1) The following Project Requirement deliverables shall be submitted a minimum of one (1) week prior to the Preconstruction Meeting.
a) Letter designating your Project Superintendent.
b) Project Schedule with construction portion fully developed.
c) Accident Prevention Program.
d) A list of subcontractors for this project (must be same as in your proposal).
e) Waste Management Plan.
f) Quality Control Plan.
g) Storm Water Pollution Prevention Plan Submittal process.
h) DBC’s Commissioning Plan (CCxP).
2) After the Complete Stamped and Signed Construction Documents are accepted and prior to the start of construction, the CO will arrange an on-site Preconstruction Meeting with the DBC. The meeting agenda will include the following as a minimum:
a) Correspondence procedures.
b) Roles and responsibilities.
c) Lines of Authority.
d) Progress Payments.
e) Submittal process.
f) Resolution to any additional comments provided by USDA Forest Service.
g) Construction Schedule: Provide a minimum of two (2) color hard copies and electronic copy in software it which it was created.
h) Labor standards.
i) Payroll reports.
j) Modifications.
k) Accident reporting.
l) Rules and regulations.
m) Medical emergency processes, availability, emergency numbers, and contacts.
n) Permits, burning construction waste, rules of the road, alcohol use, housekeeping, firearms, pets, natural and cultural resource concerns.
o) Bridge, access road and site constraints.
p) Visitation and public relations.
q) Environmental and sustainability requirements for the Project, required tracking for sustainability (related submittals).
r) Archeological Resources Protection Requirements.
Statement of Work for DB Services Page 22 of 88
s) Saturdays, Sundays, holidays and night work.
t) Traffic control.
D. Progress Meetings:
1) The DBC shall participate in weekly telephone conference calls with the CO, and other project team members to update them on the following meeting agenda items:
a) Approval of Meeting Minutes of previous meetings.
b) Submittal status.
c) Review of off-site fabrication and delivery.
d) Requests for Information (RFI’s) and issues.
e) Modifications.
f) Work in progress and projected.
g) Schedule update (provide updated CPM schedule).
h) Status of Project Record Drawings and O&M Manuals.
i) Other business relating to work.
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
AGAR 452.211-75 Effective Period of Contract (FEB 1988)
The effective period of performance of this contract is from date of notice of proceed through 05/30/2021.
Approval of Work by Subcontractors and Consultants
The prime contractor is responsible and accountable for all work performed under this contract.
Subcontractors and consultants shall affix their professional registration seal on work performed under the direction of the prime contractor. The prime contractor shall provide a separate written approval and acknowledgement that any such documents have been prepared in accordance with sound engineering and/or architectural methods, procedures and practices.
http://www.arnet.gov/far/
Statement of Work for DB Services Page 23 of 88
SECTION G: CONTRACT ADMINISTRATION DATA
1. Not Used
Statement of Work for DB Services Page 24 of 88
SECTION H: SPECIAL CONTRACT REQUIREMENTS
1. Reference Standards
A. ICC IBC-2018: 2018 International Building Code
B. ICC IEBC-2018: 2018 International Existing Building Code
C. ICC IECC-2018: 2018 International Energy Conservation Code
D. ICC IFC-2018: 2018 International Fire Code
E. ICC IFGC-2018: 2018 International Fuel Gas Code
F. ICC IMC-2018: 2018 International Mechanical Code
G. ICC IPC-2018: 2018 International Plumbing Code
H. ICC IPMC-2018: 2018 International Property Maintenance Code
I. ICC IPSDC-2018: 2018 International Private Sewage Disposal Code
J. ICC IRC-2018: 2018 International Residential Code
K. ICC IWUIC-2018: 2018 International Wildland-Urban Interface Code
L. ICC IZC-2018: 2018 International Zoning Code
M. ICC PC-2018: 2018 ICC Performance Code for Buildings and Facilities
N. National Electrical Code (NFPA): 2017 Edition
O. National Electrical Code (NFPA) 101 Life Safety Code: 2018 Edition
P. FY2012 Edition of R8 Design Standards for Facilities
Q. ASHRAE 189.1-2014: Standard for the Design of High-Performance Green Buildings (replaces 2009 edition in the R8 Design Standards for Facilities).
R. EPA: Table 2: Mold Remediation Guidelines in Mold Remediation in Schools and Commercial Buildings published by the United States Environmental Protection Agency https://www.epa.gov/mold/pdf-version-table-2-mold-remediation-guidelines-mold-remediation-schools-and-commercial.
2. Special Design Requirements
A. Structural design and detailing to be performed in Autodesk REVIT.
B. Site design work to be performed in Civil 3D.
C. The project will be certified LEED Silver.
3. Design Imperatives
A. Utilize the following at all stages of the design and construction processes:
1) Compliance Consistency Reviews.
2) Compliance with Architectural Barriers Act Accessibility Standards (ABAAS).
3) Constructability Strategies.
4) Quality Control.
5) Risk Analysis.
6) Scope and Budget Consistency Reviews.
Statement of Work for DB Services Page 25 of 88
7) Sustainable Design Practices.
8) Value-Based Decision-Making Methodology.
4. Integrated Design Principals
A. Integrated Design Principles shall be employed. Use a collaborative, integrated design process that:
1) Initiates and maintains an integrated project team in all stages of a project;
2) Meets performance goals for siting, energy, water, materials, and indoor environmental quality along with other comprehensive design goals; and, ensures incorporation of these goals throughout the design and lifecycle of the building.
3) Considers all stages of the building’s lifecycle, including deconstruction.
5. Facility Performance
A. All work performed shall comply with applicable laws, regulations, and USDA Forest Service policies and guidelines.
6. Elements and Products
A. In addition to requirements specified in other chapters, provide products and elements that comply with the following:
1) Where "no substitutions" is indicated, use only the product (or one of the products) specified.
2) Elements Made Up of More Than One Product:
a) Where an element is specified by performance criteria, the project shall use construction either proven-in-use or proven-by-mock-up, unless otherwise indicated.
(1) Proven-In-Use: Proven to comply by having actually been built to the same or very similar design with the same materials as specified and functioning as specified.
(2) Proven-by-Mock-Up: Compliance reasonably predictable by having been tested in full-scale mock-up using the same materials and design as specified and functioning as specified. Testing need not have been accomplished specifically for this project; when published listings of independent agencies include details of testing and results, citation of test by listing number is sufficient (submittal of all test details is not required).
(3) The DBC may choose whether to use elements proven-in-use or proven-by-mock-up, unless either option is indicated as specifically required.
b) Where test methods accompany performance requirements, those test methods shall be used to test the mock-up.
c) Where a type of product is specified, without performance criteria specifically applicable to the element, the project shall use the type of product specified.
Statement of Work for DB Services Page 26 of 88
d) Where more than one type of product is specified, without performance criteria specifically applicable to the element, the DBC shall use one of the types of products specified.
e) Where a type of product is specified, with applicable performance criteria, the DBC shall use either the type of product specified or another type of product that meets the performance criteria as proven-in-use or proven-by-mock-up.
f) Where more than one type of product is specified, with applicable performance criteria, the DBC shall use either one of the types of products specified or another type of product that meets the performance criteria as proven-in-use or proven-by-mock-up.
g) Where neither type of product nor performance criteria are specified, the DBC shall use products that will perform well within the specified life span of the building.
3) Products:
a) Where a product is specified only by a manufacturer name and model number/brand name, the DBC shall use only that model/brand product.
b) Where the properties of a product are specified by description and/or with performance criteria, the DBC shall use products that comply with the description and/or performance criteria.
c) Where manufacturers are listed for a particular product, the DBC shall use a product made by one of those manufacturers that also complies with other requirements.
d) Where actual brand name products are not identified by either the CO or the DBC, the DBC shall identify the products to be used.
e) In the Proposal:
(1) The DBC shall identify one or more product types for each system, assembly, or element.
(2) For each product type, the DBC shall identify brief descriptive or performance specifications.
(3) For major manufactured products that are commonly purchased by brand name, and any other products so indicated, we will identify at least one manufacturer that will be used.
f) During Design Development or Construction Documents Submissions:
(1) Where more than one product type is identified for a particular system, assembly, or element, the DBC shall identify exactly which type will be used.
(2) For each product type, the DBC shall identify descriptive or performance specifications; early submittals shall be brief specifications, but complete specifications shall be provided prior to completion of construction documents.
(3) For each product type, the DBC shall identify at least one manufacturer that will be used.
Statement of Work for DB Services Page 27 of 88
(4) For major manufactured products that are commonly purchased by brand name, and any other products so indicated, the DBC shall provide manufacturer's product literature on at least one actual brand name product that meets the specifications, including performance data and sample warranty.
g) During Construction:
(1) The DBC shall identify actual brand name products used for every product, except commodity products specified by performance or description.
(2) Where a product is specified by performance requirements with test methods, and if so specified, the DBC shall provide test reports showing compliance.
(3) The DBC shall provide manufacturer's product literature for each brand name product.
(4) The DBC shall provide the manufacturer's certification that the product used on the project complies with the contract documents.
h) Before End of Closeout:
(1) The DBC shall provide copies of all manufacturer warranties that extend for more than one year after completion.
7. Technical Requirements
A. Substructure:
A10: Foundations
A20: Basement Construction
B. Shell:
B10: Superstructure
B20: Exterior Enclosure
B30: Roofing
C. Interiors:
C10: Interior Construction
C20: Stairs
C30: Interior Finishes
D. Services:
D10: Conveying
D20: Plumbing
D30: HVAC
D40: Fire Protection
D50: Electrical
Statement of Work for DB Services Page 28 of 88
E. Equipment and Furnishings:
E10: Equipment
E20: Furnishings
F. Special Construction and Demolition: