10.2_LEED_CHECKLIST_COMMENTED.pdf

PDF 448 KB Posted

Attached to
Design Build Revitalization of El Portal Visitors Center Building and Site
Solicitation number
1243ZP19R0003
Issued by

About this file

LEED Checklist

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEED v4 for BD+C: New Construction and Major Renovation

RATING

X

Yes ? No CREDIT POINTS RATING

1 Credit 1 1

1 IPpc98 1

1 1 0 Possible Points: 16

Credit 1 16

1 Credit 2 1 1

Credit 3 2

Credit 4 5

Credit 5 5

Credit 6 1

Credit 7 1

1 Credit 8 1 3

5 1 0 Possible Points: 10

Y Prereq 1 Required 1

1 Credit 1 1 2

1 Credit 2 2 3

1 Credit 3 1 1

1 Credit 4 3

1 Credit 5 2 1

1 Credit 6 1 1

5 2 2 Possible Points: 11

Y Prereq 1 Required 1

Y Prereq 2 Required 1

Y Prereq 3 Building-Level Water Metering Required 1

2 Credit 1 2 1

2 2 2 Credit 2 6 1

Credit 3 2

Green Vehicles

Projects are within the footprint of existing buildings.

Incorporating rainwater reuse may enable higher point achievement.

New lighting fixtures are part of current SOW.

No landscape irrigation

Plumbing fixture replacement are in current SOW

Retrofit for installing permanent water meters to gather data is achievable

No landscape irrigation

Achievable but requires non basic services from consultants

Will require a larger scope in landscape and civil works to restore 30% of site.

Subject to further calculations

Rainwater management with LID's are already included in the site SOW. There will be regrading and new site design.

New roof is already contemplated in SOW

Electric vehicle charging stations are required.

PROJECT:

Address

Date:

Easily Achievable

Requires analysis and/ or non typical design

Challenge (design or financial)

Not achievable for this project

Integrative Process

Location and Transportation

LEED for Neighborhood Development Location

Incorporate early in the process an OPR and BOD. Emphasize in energy and water management that includes energy modeling analysis Assessment & Planning for resilience

USFS CATALINA HEADQUARTERS

Scorecard Analysis

COMMENTS

silver min

Indoor Water Use Reduction

Cooling Tower Water Use

Heat Island Reduction

Light Pollution Reduction

Water Efficiency

Outdoor Water Use Reduction

Indoor Water Use Reduction

Outdoor Water Use Reduction

Sustainable Sites

Construction Activity Pollution Prevention

Site Assessment

Site Development--Protect or Restore Habitat

Open Space

Rainwater Management

Sensitive Land Protection

High Priority Site

Surrounding Density and Diverse Uses

Access to Quality Transit

Bicycle Facilities

Reduced Parking Footprint

1 Credit 4 1 1

28 3 1 Possible Points: 33

Y Prereq 1 Required

Y Prereq 2 Required

Y Prereq 3 Required

Y Prereq 4 Required

6 Credit 1 6 2

18 Credit 2 18 1 & 3

1 Credit 3 1 1

1 Credit 4 2

3 Credit 5 3 1 & 3

1 Credit 6 1

2 Credit 7 2 3

4 0 0 Possible Points: 13

Y Prereq 1 Required 1

Y Prereq 2 Required 1

1 Credit 1 5 1

1 Credit 2 2 1

Credit 3 2

1 Credit 4 2 1

1 Credit 5 2

11 1 0 Indoor Environmental Quality Possible Points: 16

Y Prereq 1 Required

Y Prereq 2 Required

2 Credit 1 2

Water Metering

Building Product Disclosure and Optimization - Material

Ingredients

Getting 20 products with EPD to earn 1 point is feasible, achieving 2 points is very challenging

Following Option 1 by selecting new products with ingredient information transparency such as

Declare. Mainstream building products are up to date with this requirement.

Project could follow option of landfill diversion in total of waste generation. Other credit options may not be feasible.

Achievable but requires additional services from consultants

Although it is a substantial financial and design challenge, it is currently considered in the scope of work and project budget. A complete electrical a mechanical retrofit is expected.

Retrofit for installing permanent submeters to gather data is achievable

DR programs and smart grid interaction may not be applicable in local circumstances. Credit could be achieved by only providing the required infrastructure for a future DR program.

Although it is a substantial financial and design challenge, it is currently considered in the scope of work and project budget.

It is unknown if USFS already is part of a carbon offset program.

Follow Option 3 that includes existing building reuse.

Retrofit for installing permanent water meters to gather data as required by LEED is achievable

Building Product Disclosure and Optimization -

Environmental Product Declarations

Building Product Disclosure and Optimization - Sourcing of

Raw Materials

Construction and Demolition Waste Management

Minimum Indoor Air Quality Performance

Environmental Tobacco Smoke Control

Enhanced Indoor Air Quality Strategies

Enhanced Refrigerant Management

Green Power and Carbon Offsets

Materials and Resources

Storage and Collection of Recyclables

Construction and Demolition Waste Management Planning

Building Life-Cycle Impact Reduction

Fundamental Refrigerant Management

Enhanced Commissioning

Optimize Energy Performance

Advanced Energy Metering

Demand Response

Renewable Energy Production

Energy and Atmosphere

Fundamental Commissioning and Verification

Minimum Energy Performance

Building-Level Energy Metering

1 1 Credit 2 3 1

1 Credit 3 Construction Indoor Air Quality Management Plan 1 1

1 Credit 4 2 1

1 Credit 5 1 1

2 Credit 6 2 1

2 Credit 7 3 2

1 Credit 8 1 1

Credit 9 1

3 0 0 Innovation Possible Points: 6

2 Credit 1 5 2

1 Credit 2 1

4 0 0 Regional Priority Possible Points: 4

1 Credit 1 Regional Priority: Specific Credit 1

1 Credit 2 Regional Priority: Specific Credit 1

1 Credit 3 Regional Priority: Specific Credit 1

1 Credit 4 Regional Priority: Specific Credit 1

62 8 3 Total 110

Correct selection of interior paints and coatings applied on site; these includes: interior adhesives and sealants applied on site (including flooring adhesive); flooring; and ceilings, walls, thermal, and acoustic insulation

Requires proper specifications to guide an IAQ by Contractor and follow up to contractor

Testing shall be included in project budget

Optimize Energy performance

Thermal Comfort

Construction & Demolition waste management

Outdoor water use reduction

This credit includes controllability of VAC systems that needs to be coherent with OPR.

New lighting design is included in scope of work and entails: controls, quality and effectiveness

(surface reflectance and illuminance ratios)of the system design.

Requires modeling that is not part of the basic services

Catalina upper level is currently considering openning new windows to increase views to the outside. Credit achivement is subject to calculation.

Innovation in Design may be achieved by implementing Resiliency measures regarding

Operations that may be accounted in other Guidelines such as RELi.

Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110

Possible Points:

Acoustic Performance

Innovation

LEED Accredited Professional

Low-Emitting Materials

Indoor Air Quality Assessment

Thermal Comfort

Interior Lighting

Daylight

Quality Views

LEED v4 for BD+C: New Construction and Major Renovation

RATING

X

Yes ? No CREDIT POINTS RATING

1 Credit 1 1

IPpc98 1

2 1 0 Possible Points: 16

Credit 1 16

1 Credit 2 1 1

Credit 3 2

Credit 4 5

Credit 5 5

Credit 6 1

Credit 7 1

1 1 Credit 8 1 3

4 2 0 Possible Points: 10

Y Prereq 1 Required 1

1 1 Credit 1 1 2

1 Credit 2 2 3

1 Credit 3 1 1

Credit 4 3

1 Credit 5 2 3

1 Credit 6 1 1

5 2 2 Possible Points: 11

Y Prereq 1 Required 1

Sustainable Sites

Construction Activity Pollution Prevention

Site Assessment

Site Development--Protect or Restore Habitat

Open Space

Rainwater Management

Sensitive Land Protection

High Priority Site

Surrounding Density and Diverse Uses

Access to Quality Transit

Bicycle Facilities

Reduced Parking Footprint

Heat Island Reduction

Light Pollution Reduction

Water Efficiency

Outdoor Water Use Reduction

Scorecard Analysis

COMMENTS

silver minUSFS El PORTAL VISITORS CENTER

Electric vehicle charging stations are required.

PROJECT:

Address

Date:

Easily Achievable

Requires analysis and/ or non typical design

Challenge (design or financial)

Not achievable for this project

Integrative Process

Location and Transportation

LEED for Neighborhood Development Location

Incorporate early in the process an OPR and BOD. Emphasize in energy and water management that includes energy modeling analysis

Assessment & Planning for resilience

New lighting fixtures are part of current SOW.

No landscape irrigation

Achievable but requires non basic services from consultants

Will require a larger scope in landscape and civil works to restore 30% of site.

Subject to further calculations

Rainwater management with LID's are already included in the site SOW. There will be regrading and new site design.

New roof is already contemplated in SOW

Green Vehicles

Projects are within the footprint of existing buildings.

Y Prereq 2 Required 1

Y Prereq 3 Building-Level Water Metering Required 1

2 Credit 1 2 1

2 2 2 Credit 2 6 1

Credit 3 2

1 Credit 4 1 1

28 3 1 Possible Points: 33

Y Prereq 1 Required

Y Prereq 2 Required

Y Prereq 3 Required

Y Prereq 4 Required

6 Credit 1 6 2

18 Credit 2 18 1&3

1 Credit 3 1 1

1 Credit 4 2

3 Credit 5 3 1&3

1 Credit 6 1

2 Credit 7 2 3

4 0 0 Possible Points: 13

Y Prereq 1 Required 1

Y Prereq 2 Required 1

1 Credit 1 5 1

1 Credit 2 2 1

Indoor Water Use Reduction

Cooling Tower Water Use

Energy and Atmosphere

Fundamental Commissioning and Verification

Minimum Energy Performance

Building-Level Energy Metering

Indoor Water Use Reduction

Outdoor Water Use Reduction

Green Power and Carbon Offsets

Materials and Resources

Storage and Collection of Recyclables

Construction and Demolition Waste Management Planning

Building Life-Cycle Impact Reduction

Fundamental Refrigerant Management

Enhanced Commissioning

Optimize Energy Performance

Advanced Energy Metering

Demand Response

Renewable Energy Production

Building Product Disclosure and Optimization - Environmental Product Declarations

Enhanced Refrigerant Management

Plumbing fixture replacement are in current SOW

Retrofit for installing permanent water meters to gather data is achievable

No landscape irrigation

Follow Option 3 that includes existing building reuse.

Incorporating rainwater reuse may enable higher point achievement.

Retrofit for installing permanent water meters to gather data as required by LEED is achievable

Achievable but requires additional services from consultants

Although it is a substantial financial and design challenge, it is currently considered in the scope of work and project budget.

A complete electrical a mechanical retrofit is expected.

Retrofit for installing permanent submeters to gather data is achievable

DR programs and smart grid interaction may not be applicable in local circumstances. Credit could be achieved by only providing the required infrastructure for a future DR program.

Although it is a substantial financial and design challenge, it is currently considered in the scope of work and project budget.

It is unknown if USFS already is part of a carbon offset program.

Water Metering

Getting 20 products with EPD to earn 1 point is feasible, achieving 2 points is very challenging

Credit 3 2

1 Credit 4

Building Product Disclosure and Optimization - Material Ingredients

2 1

1 Credit 5 2

11 0 0 Indoor Environmental Quality Possible Points: 16

Y Prereq 1 Required

Y Prereq 2 Required

2 Credit 1 2

1 Credit 2 3 1

1 Credit 3 Construction Indoor Air Quality Management Plan 1 1

1 Credit 4 2 1

1 Credit 5 1 1

2 Credit 6 2 1

2 Credit 7 3 2

1 Credit 8 1 1

Credit 9 1

3 0 0 Innovation Possible Points: 6

2 Credit 1 5 2

1 Credit 2 1

4 0 0 Regional Priority Possible Points: 4

1 Credit 1 Regional Priority: Specific Credit 1

1 Credit 2 Regional Priority: Specific Credit 1

1 Credit 3 Regional Priority: Specific Credit 1

El Portal spaces are mostly within views to the outside, subject to calculation of Terrace level considering the back offices that will be provided.

Acoustic Performance

Innovation

LEED Accredited Professional

Low-Emitting Materials

Indoor Air Quality Assessment

Thermal Comfort

Interior Lighting

Daylight

Quality Views

Building Product Disclosure and Optimization - Sourcing of Raw Materials

Construction and Demolition Waste Management

Minimum Indoor Air Quality Performance

Environmental Tobacco Smoke Control

Enhanced Indoor Air Quality Strategies

Testing shall be included in project budget

Optimize Energy performance

Thermal Comfort

Construction & Demolition waste management

Following Option 1 by selecting new products with ingredient information transparency such as Declare. Mainstream building products are up to date with this requirement.

Project could follow option of landfill diversion in total of waste generation. Other credit options may not be feasible.

This credit includes controllability of VAC systems that needs to be coherent with OPR.

New lighting design is included in scope of work and entails:

controls, quality and effectiveness (surface reflectance and illuminance ratios)of the system design.

Requires modeling that is not part of the basic services

Innovation in Design may be achieved by implementing

Resiliency measures regarding Operations that may be accounted in other Guidelines such as RELi.

Correct selection of interior paints and coatings applied on site; these includes: interior adhesives and sealants applied on site (including flooring adhesive); flooring; and ceilings, walls, thermal, and acoustic insulation

Requires proper specifications to guide an IAQ by Contractor and follow up to contractor

1 Credit 4 Regional Priority: Specific Credit 1

62 8 3 Total 110

Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110

Possible Points:

Outdoor water use reduction

File details come from the government source that posted it.