Mulky_Dixon_Section_M_Culvert_Replacement.pdf

PDF 11 KB Posted

Attached to
Construction - AOP Culvert Replacements at Mulky Gap and Dixon Creek
Solicitation number
12435H18R0007
Issued by

About this file

SECTION M

View the file

Other files

File Type Posted
Question.pdf PDF
AOP_Design_Summary_MULKY1-27-2018.pdf PDF
AOP_Design_Summary_DIXON1-27-2018.pdf PDF
Pre_bid_questions_(002).pdf PDF
FP14-FSSS_(002).pdf PDF
Schedule_of_Items.pdf PDF
Bidtab.xlsx XLSX spreadsheet
FP14-FSSS.docx DOCX document
12435H18R0007_SF-1442.pdf PDF
12435H18R0007___pp_3-37_(006).pdf PDF
Mulky_Dixon_Section_C_General_Requirements.pdf PDF
Mulky_Dixon_Contract_Drawings572018_(002).pdf PDF
Wage_Determination.pdf PDF
Mulky_Dixon_Suplemental_Specifications.pdf PDF
Mulky_Dixon_Bidtab.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION M--EVALUATION FACTORS FOR AWARD

EVALUATION FACTORS

The following factors will be used to evaluate proposals for award. Evaluation factors other than price, when combined, are approximately equal to price in the award decision. All technical factors are relatively equal in weight. Information should be provided for the general contractor and major subcontractors.

I. TECHNICAL

A. Plan of Work: The government will evaluate the offeror’s plan for accomplishing the work, including equipment, on-the-ground labor, subcontractors, and project supervision. If subcontractors are used for labor, higher score will be given to firms using reliable subs with whom they have an already-established working relationship. Lower scores will be given to firms who intend to subcontract to firms never used before, or do not have firm plans in place to use a specific subcontractor.

B. Experience: particularly prior experience of the offeror and any subcontractor in direct performance of road construction, culvert assembly and installation, or similar civil engineering work. Direct experience in civil engineering work is preferable to construction management of subcontractors.

II. PAST PERFORMANCE

In the case of a newly-established offeror without a record of relevant past performance, the evaluation will take into account information regarding predecessor companies, key personnel who have relevant experience, or subcontractors who will perform significant portions of the requirement. When no information is available, the offeror may not be evaluated favorably or unfavorably.

III. PRICE

AWARD DECISION

Award will be made to the most highly ranked offeror (1) whose total proposal is technically acceptable,

(2) has demonstrated past performance in meeting customer satisfaction, and (3) whose past performance and technical/cost relationship presents the BEST VALUE and is the most advantageous to the Government.

Evaluation factors other than price, when combined, are approximately equal to price in the award decision. The critical factor in making any cost/technical trade-off is not the spread between the technical scores but, rather, the significance of that difference. The significance of the spread of scores will be determined on the basis of what the difference might mean in terms of performance and what it would cost the Government to take advantage of it. Award may not necessarily be made for technical capabilities that would appear to exceed those needed for the successful performance of the work. The Government reserves the right to make cost/technical trade-offs that are in the best interest and advantageous to the Government.

File details come from the government source that posted it.