Mulky_Dixon_Section_C_General_Requirements.pdf
PDF 617 KB Posted
- Solicitation number
- 12435H18R0007
About this file
SECTION C
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question.pdf | ||
| AOP_Design_Summary_MULKY1-27-2018.pdf | ||
| AOP_Design_Summary_DIXON1-27-2018.pdf | ||
| Pre_bid_questions_(002).pdf | ||
| FP14-FSSS_(002).pdf | ||
| Schedule_of_Items.pdf | ||
| Bidtab.xlsx | XLSX spreadsheet | |
| FP14-FSSS.docx | DOCX document | |
| Mulky_Dixon_Section_M_Culvert_Replacement.pdf | ||
| 12435H18R0007_SF-1442.pdf | ||
| 12435H18R0007___pp_3-37_(006).pdf | ||
| Mulky_Dixon_Contract_Drawings572018_(002).pdf | ||
| Wage_Determination.pdf | ||
| Mulky_Dixon_Suplemental_Specifications.pdf | ||
| Mulky_Dixon_Bidtab.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION – C DESCRIPTION OF WORK
C1‐ General Requirements
A. Description of Work Culvert Replacements are s located on FSR 4 Mulky Gap Road, beginning at the intersection with FSR 88 at the Dixon Creek crossing continue north on Mulky Gap Road for about .85 miles to the second culvert where Mulky Creek Crosses FSR 4, Mulky Gap Road. The road is located on the Blue Ridge Ranger
District of the Chattahoochee‐Oconee National Forests in Union County, Georgia. The project is located on Mulky Quad map.
The project removes the existing Dixon Creek, 15 foot long by 42 inch diameter culvert and the existing 36 inch diameter 22 foot long Mulky
Creek Culvert. Both culverts have CCC constructed stone head walls. The stones from the head walls are to be reserved and reused to delaminate the edge of road over the new culvert installations.
The road bed is width at the culverts is 14 feet with 2 feet of shoulder. The approach road has a ditch on upland side of the road that is 1 foot deep. The approach sections are 30 feet long and have a riprap section 24 inches thick topped by 4” compacted in place of GDOT # 4 aggregate. Any of the salvaged headwall stone that is not used in the rebuilding of the new culvert headwalls, if two feet minimum diameter boulders shall be placed on the edges of the travel way to act as curbing on the culverts. The rest may left stockpiled on site for future use by the Forest Service
The replacement culvert at Mulky Creek is a Contech
Aluminum Structural Plate open Box Culvert No. 43, R3 with HG/CG =2/2 or approved equivalent. Culvert spans
19’ 6” and rises 6’ 1” and a length of 22.5 feet. It has an opening of 97.1 ft. sq. with min. cover of 1.4 ft. and max.
cover of 5.0 feet. The loading is HL‐93. The head wall shall be reinforced concrete rather than the standard aluminum because of the need to replicate the masonry headwall on the new culvert. The concrete headwall measures approximately 22’ 3‐3/4” long and 9’‐1” high with two sloping wing walls 10 feet long.
Figure 1 Dixon Creek inlet Headwall
Figure 2 Mulky Creek Inlet Headwall
The replacement culvert at Dixon Creek is a Contech Aluminum Structural Plate open Box Culvert No. 28, R3 with HG/CG =2/2 or approved equivalent. Culvert spans 14’‐10” and rises 4’‐10” and a length of 22.5 feet. It has an opening of 63.2 ft. sq. with min. cover of 1.4 ft. and max. cover of 5.0 feet. The loading is
HL‐93. The head wall shall be reinforced concrete rather than the standard aluminum because of the need to replicate the masonry headwall on the new culvert. The concrete headwall measures approximately 18’ 1‐ ¾” long and 9’‐1” high with two sloping wing walls 10 feet long
The Contractors shall provide shop drawings for the headwall and footing design with the Forest Service reviewing and approving the shop drawings before construction of the headwalls begin.
Limited clearing is required at that site. Only those trees which must be removed to adjust the alignment of the new culvert and road widening are expected to be removed. The timber will be marked by the Government prior to removal. The timber will be topped, limbed, cut to length and decked in the dispersed campsite adjacent to the worksite. The tops and limbs will be used as brush barriers to protect the work site from sediment transport.
Camping
| There | are | two | Forest | Service | campgrounds | in | the | area | where | the | Contractor | may | make | ||||
| reservations | and | camp | for | two | weeks. | The | contractor | may | also | use | a | dispersed | campsite | near | |||
| project | site | with | site | selection | agreed | upon | with | the | Contractor | and | wishes | to | camp | for | longer | than | |
| two | weeks | the | Contractor | may | will | obtain | a | permit | from | the | District | Ranger | to | use | the | location | for |
| duration | of | the | contract. |
B. Location
The culverts are located on FSR 4, Mulky Gap Road. Access to the road is off of Georgia 60. The reach FSR 4 take Georgia 60 to Cavender Gap road approximately 7 miles from Suches Ga.
Turn on Cavernder Gap Road and follow it until the intersection with FSR 236 to the left. Continue on
FSR 236 approximately 3.0 miles to the intersection with FSR 4. Turn right on to FSR 4, for approximately 1.3 miles to the Dixon Creek crossing and then another .85 miles to the Mulky Creek crossing
C. Environmental The contractor shall be responsible for keeping all silt and construction debris from leaving the construction limits. Any silt or construction debris found outside the construction limits shall be cleaned up and removed at no cost to the government. The Contractor shall comply with the State of Georgia erosion and Sediment control measures. Anyone who works with the erosion control best management
FSR 4 MULKY GAP ROAD
practices (BMP’s) must be licensed according to the Georgia Soil and Water Conservation Commission
Requirements.
D. Pre Bid Meeting August 1, 2018 10:00 The pre meeting shall be mandatory and shall meet at the intersection with FSR 4 and FSR 88. This is where Dixon Creek crosses Mulky Gap Road.
E. Price Range less than $500,000
F. Contract Time The Contractor shall have 180 days to complete the contract the project. The contract shall run from.
The Contract time shall begin 45 days from the date of award.
G. Inspection and Acceptance Periodic field inspections will be made by the Contracting Officer’s Representative (COR) or the COR’s designated inspector. Work not completed to the Contract Specifications shall be reworked without compensation to the contractor.
C2 SPECIFICATIONS
The Contractor shall furnish the necessary personnel, material equipment, services and facilities (except as otherwise specified), to perform the description of work/Statement of Work reference in Section J.
The projects specifications are included by reference are Standard Specifications for Construction of
Roads and Bridges on Federal Highway Projects FP‐14. They may be obtained on the internet at https://flh.fhwa.dot.gov/resources/specs/
File details come from the government source that posted it.