Site Visit Questions.pdf

PDF 53 KB Posted

Attached to
GAOA Rexford Sewer & Water System Replacement Federal contract opportunity
Solicitation number
1240LU26Q0043
Issued by
Department of Agriculture Forest Service

About this file

This document is Site Visit Notes for the GAOA Rexford Sewer & Water System Replacement federal contract opportunity (1240LU26Q0043). The solicitation involves replacement of sewer and water systems at a Forest Service recreation area, requiring contractors to manage clearing, spoil disposal, and merchantable timber storage during construction activities spanning the full performance period.

Key deadline dates are: questions due by April 8 and bids due by April 16. The project requires contractors to coordinate with the Forest Service regarding facility closures and access restrictions. Permanent closures during performance include all restrooms, the trail from upper campground loops to Kamloops overflow parking, and the beach area. Temporary closures permitted with advance notice include the boat ramp parking area (two rows closest to approach manhole), Kamloops overflow parking for storage and staging, and any roads with adequate lead time and signage. The main campground remains open during performance but may be temporarily closed with adequate lead time. Boat ramp, Kamloops, and main campground hosts remain in place but may be temporarily relocated with two weeks' notice to the Contracting Officer. The dump station closure depends on whether an option item is awarded; if awarded, it closes for construction; if not, it remains open but may be temporarily closed with adequate lead time. The contractor must manage clearing limits, spoil location, and merchantable timber storage at the Kamloops location, and should reference drawing note CU301 #4 regarding pipe under pedestrian bridge and General Construction Note #22 on sheet G003.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA Rexford Sewer & Water System Replacement, newest first.
File Type Posted
Amend0001_1240LU26Q0043.pdf PDF
Site Visit Attendees.jpg JPG image
Updated 16 March 26 1240LU26Q0043 GAOA Rexford Solcitation.pdf PDF
Attachment 8 SOW Rexford Bench.pdf PDF
1240LU26Q0043 GAOA Rexford Solcitation.pdf PDF
Attachment 3 Rexford Final CD Combined Spec 7 01 2025.pdf PDF
Attachment 5 ACE ELE CD Specs.pdf PDF
Attachment 7 Wage Determination.pdf PDF
Attachment 2 Schedule of Items.xlsx XLSX spreadsheet
Attachment 4 Rexford Plan Set.pdf PDF
Attachment 6 Geotechnical Evaluation Report_Rexford Lift Station.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GAOA Rexford Sewer & Water System Replacement

1240LU26Q0043

Site Visit Notes

Clearing limits – 311000 – can pile on side of trench. Clear and grub spoil can be lopped and scattered onto the disturbed area.

Spoil location – 017419-5, 311000-2 see the above answer –

Merchantable timber – 311000-8 – to be stored at Kamloops location (see below)

Dates

Questions – by 4/8

Bids due – by 4/16

Noise requirements – none, see daily start and stop times listed in SOW

Pipe under pedestrian bridge – CU301 note #4

Clarification of General construction notes #22 on sheet G003 “CAMPGROUND TO BE CLOASED DURING

CONSTRUCTION”

Restrooms All restrooms shall be closed for the duration of the period of performance.

Trail from upper campground loops to Kamloops (overflow parking) Trail shall be closed for the duration of the period of performance.

Beach Area Beach Area shall be closed for the duration of the period of performance.

Boat Ramp Parking Area The two rows of parking closest to the ‘approach manhole’ shall be closed for the duration of the period of performance. Contractor will be required to adequately sign the area.

Boat Ramp Host, Kamloops Host, and Main Campground Host Will be in place for the duration of the period of performance but can be moved out temporarily while work is being done in that location – notify the CO 2 weeks prior

Kamloops Overflow Parking Can be closed as needed, in whole or in portions, for storage and staging – notify the CO 2 weeks prior

Roads Any road can be temporarily closed for work with adequate lead time and prior notification to the CO and appropriate signage.

Dump Station If option item is awarded, dump station will be closed for construction. Otherwise, it will be open for the duration of the period of performance but can be closed temporarily with adequate lead time.

Main Campground Will be open for the duration of the period of performance. Can be closed with adequate lead time.

Additional note:

It is expected for the contractor to work with the Forest Service for closures and re-opening in specific locations. Common sense safety and flow of work will be prioritized.