1240LU26Q0043 GAOA Rexford Solcitation.pdf

PDF 533 KB Posted

Attached to
GAOA Rexford Sewer & Water System Replacement Federal contract opportunity
Solicitation number
1240LU26Q0043
Issued by
Department of Agriculture Forest Service

About this file

This is a combined synopsis and solicitation (Request for Quotation) issued by the U.S. Forest Service, Intermountain Zone, for water and sewer system improvements at the Rexford Bench Campground on Kootenai National Forest in Montana. Solicitation number 1240LU26Q0043 is a 100% small business set-aside with a project magnitude of $1,000,000 to $5,000,000. The base scope includes installing sewer lift stations, gravity sewer systems, piping, water distribution lines, coordination with local electric cooperative for power service, clearing and grubbing, erosion control, earthwork, grading, asphalt repaving, directional drilling, and miscellaneous system installation work. Two options are available: Option #1 covers RV dump station installation (grubbing, demolition, gravity sewer removal, electrical service, reclamation, lighting), and Option #2 addresses water supply improvements (flowmeters, electrical service, water sampling station, vault boring). The applicable NAICS code is 237110 (Water and Sewer Line and Related Structures Construction) with a $45.0 million size standard. Quotations are due by 12:00 PM Mountain Time on April 15th, 2026, with a mandatory site visit on March 31st, 2026 at 10:00 AM. A firm fixed-price contract is anticipated, with bid guarantee (20% if exceeding $150,000), performance and payment bonds (100% of original contract price if exceeding $150,000, due within 10 days of award), or alternative payment protections for contracts between $35,000 and $150,000.

Evaluation will be based on experience, past performance, and price using a comparative methodology to determine best value. Quoters must submit a schedule of items, documentation of relevant experience and past performance on five comparable projects completed within the past five years (including project name, location, quoter's role, whether subcontractors were used, performance dates, work description, contract value, and customer/contracting officer contact information), bid guarantee documentation if applicable, and acknowledged amendments. Quotations should be sent to Paula Sales (paula.sales@usda.gov) and Lisa Rakich (lisa.rakich@usda.gov) at Forest Service, Property and Procurement Services, Intermountain Zone, CSA #9. The solicitation incorporates standard FAR clauses and AGAR provisions applicable to commercial construction, including requirements for construction wage rates, Buy American construction materials, performance and payment bonds, progress payments, labor standards compliance, and various other federal acquisition requirements. The document includes comprehensive FAR/AGAR clause listings and protest procedures through the USDA Ombudsman Program for Agency Protests (OPAP).

View the file

Other files for this federal contract opportunity

Other files attached to GAOA Rexford Sewer & Water System Replacement, newest first.
File Type Posted
Amend0001_1240LU26Q0043.pdf PDF
Site Visit Questions.pdf PDF
Site Visit Attendees.jpg JPG image
Updated 16 March 26 1240LU26Q0043 GAOA Rexford Solcitation.pdf PDF
Attachment 8 SOW Rexford Bench.pdf PDF
Attachment 2 Schedule of Items.xlsx XLSX spreadsheet
Attachment 4 Rexford Plan Set.pdf PDF
Attachment 3 Rexford Final CD Combined Spec 7 01 2025.pdf PDF
Attachment 5 ACE ELE CD Specs.pdf PDF
Attachment 7 Wage Determination.pdf PDF
Attachment 6 Geotechnical Evaluation Report_Rexford Lift Station.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

,-./0123415./6 78192:15./6 .2 ;9<:52= >�

���$�)�@A�

BB

�CD

EFGGDHE

IDJKLFM

FM

KCD

HDNDHID

OPIK

QD

GPRRS

JFOTRDKDU

QS

FGGDHFHV

W�

�����X����� Y� ��X� Z� ,[/483\9 :29:

4.\9= -̂ __̀-a -7__b=����c

�M IDdRDU

QLU

IFRLJLKdKLFMI

EFGGDHE

dMU

EFGGDHFHE

ODdM

EQLUE

dMU EQLUUDHVE����e��� f��*g f���g hhijkilmnopqrn snp tuvwxyzmuvptu {|}i }lv~ nvz�owu mv jii�hq}|h� i��m ����� n����� x������ ���������������������pm�p np�wn jklq�j{qjihl h�pzp�|�h}�}�}kh}i��m}k���i|

'�����X��� ������X���� )��$X����

,a51896 5\9/15��5/� /. 6 \:19=

�pzp x�¡¢��� n�£�� n§�¦�̈ x������̈��¦ u�¦����� r����¦ ẅ��� n����� x������ p ª� y���� |h� }�}k h�«�� py y���¦��� v�̈�� y����� n������ p�� u�v p���� j� }�}k �y y���¦��� v�̈�

�°±²³Ý²°³ µ®Y¶¶ Z̄·̧± ¹̄³º°³»Y±́ ̄¼̧²®̧±

>�Y� X$�� ������X���� ���X��� *��)�½ Y¼Y³¾¿ ±°²̧́ ̄²° ¹³°́¯̄¾�

¹̄³º°³»Y±́ ̄¹̄³̧°¾ ̧µ »Y±¾Y²°³À

±̄·°²̧YZ¶̄�

f�̄ ̄�g>?� ��#$���X����eY� �̄Y¶̄¾ °ºº̄³µ °³̧·̧±Y¶ Y±¾ µ̧ ±°² ³̄ÁÂ̧³̄¾�µ̧¿ Z� °ºº̄³

·ÂY³Y±²̄̄

°ºº̄³µ Y³̄ µÂZÃ̄́ ² ²° ²®̄ f>g ¼°³Ä ³̄ÁÂ̧³̄»̄ ±²µ¿ Y±¾ f�g °²®̄³ ¹³°Å̧µ̧°±µ Y±¾ ́¶Yµ̄µ ̧±́°³¹°³Y²̄¾ ²®̄ µ°¶̧́²̧Y²̧°± ºÂ¶¶ ²̄Ʋ °³

ZÀ

³̄º̄³̄±́ �̄

,\:19=� �º ²®̧µ ̧µ Y µ̄Y¶̄¾ Z̧¾ µ°¶̧́²̧Y²̧°±¿ °ºº̄³µ ¼̧¶¶ Z̄

¹ÂZ¶̧́¶À

°¹̄±̄¾ Y² ²®Y² ²̧»̄ �

�̄Y¶̄¾ ̄±Å̄¶°¹̄µ ́°±²Y̧±̧±· °ºº̄³µ µ®Y¶¶ Z̄ »Y³Ǟ¾ ²° µ®°¼ ²®̄ °ºº̄³°³Çµ ±Y»̄ Y±¾ Y¾¾³̄µµ¿ ²®̄ µ°¶̧́²̧Y²̧°± ±Â»Z̄³¿ Y±¾ ²®̄ ¾Y²̄ Y±¾ ²̧»̄ °ºº̄³µ Y³̄ ¾Â̄�¾� �ºº̄³µ ¹³°Å̧¾̧±· ¶̄µµ ²®Y±

>�Z� ÈÉ̀ bÈ6 5/\54:19 Ê51Ë5/ Ë.Ê Ì:/� 4:89/\:2 \:�0 :�192 :Ê:2\ 5/ [19Ì

ÍÎÏ =

h� hl� ݶ̄±¾Y³ ¾YÀµ Y±¾ ́°»¹¶̄²̄ ̧² ¼̧²®̧± ݶ̄±¾Y³ ¾YÀµ Yº²̄³ ³̄´̄ Å̧̧±· h� h}���i�hl�}�}k ("!�Ð�>Ð>""Ð?�>�

Æ Æ Æ Æ

°́¹̧̄ µ ²° ¹̄³º°³» ²®̄ ¼°³Ä

³̄ÁÂ̧³̄¾

Y³̄ ¾Â̄ Y² ²®̄ ¹¶Ý ̄µ¹̄´̧º̧̄¾ �²̄»

ZÀ

,Ë.32= ¶°́Y¶ ²̧»̄ ݶ̄±¾Y³ ¾YÀµ º°³ '°Å̄³±»̄ ±² Ý´̄¹²Y±́ ̄Yº²̄³ ²®̄ ¾Y²̄ °ºº̄³µ Y³̄ ¾Â̄ ¼̧¶¶ ±°² Z̄ ́°±µ̧¾̄³̄¾ Y±¾ ¼̧¶¶ Z̄ ³̄Ã̄́ ²̄¾�

���X f�̄ Å� +%��>!g�³̄µ́³̧Z̄¾

ZÀ

'�����f!+ ���g "?��?�Ð>f¾g h

������������������
���
����
������������

�������� !"#$%&�'"(�")*+$%�$,)'-�&.�.%�/%$'&$%�&0'"�&0$�*1"1*)*%$,)1%$*$"&�#&'&$2�1"�1&$*�3425�6'1-)%$�&.�1"#$%&�'"(�")*+$%�*$'"#�&0$�.77$%.%�'88$9&#�&0$�*1"1*)*�1"�1&$*�3425:

�;��<=>?�=<@�=@@A?BB�CD�CDD?ACA� !"8-)2$�E!F�G.2$: �H���?I?JKC<?�<C�� !"8-)2$�'%$'�8.2$:�L��A?>M��=<N?�=@@A?BB� !"8-)2$�."-(�17�2177$%$"&�&0'"�1&$*�3O5:

NC@? D=NMIM�P�NC@?QRSTUVW�X������� �

��Y��=NZ<C[I?@�?>?<��CD�=>?<@>?<�B

S\\]̂ � _)#&�+$�7)--(�8.*9-$&$2�+(�.77$%.%:

̀0$�.77$%.%�'8a".b-$2/$#�%$8$19&�.7�'*$"2*$"&#�&.�&0$�#.-181&'&1."�cc�/1d$�")*+$%�'"2�2'&$�.7�$'80:=>?<@>?<��<C�@=�?�ef���<=>?�=<@��M�I?�CD�J?ABC<�=g�KCAMh?@��C�BM�<�CDD?A� ̀(9$�.%�9%1"&: ef���BM�<=�gA? ef���CDD?A�@=�?QiQ̂ j� ̀.�+$�8.*9-$&$2�+(�k.d$%"*$"&:e���M�?>B�=NN?J�?@l ee��=>Cg<� em��=NNCg<�M<��=<@�=JJACJAM=�MC<�@=�=e;��Bgn>M��M<oCMN?B��C�=@@A?BB�BKC[<�M<��������� O�8.91$#�)"-$##�.&0$%b1#$�#9$8171$2: M�?> eH��C�K?A��K=<�DgII�=<@�CJ?<�NC>J?�M�MC<�JgABg=<���CeL��=@>M<MB�?A?@�nP NC@? e���J=P>?<��[MII�n?�>=@?�nP

Gpq̀ rsG̀ !qk�p66!Gtr�u!vv�Gp_Fvt̀ t�!̀t_�wx�pr�wy�sz�sFFv!Gs{vt G."&%'8&.%�1#�%$,)1%$2�&.�#1/"�&01#�2.8)*$"&�'"2�%$&)%" G."&%'8&.%�1#�".&�%$,)1%$2�&.�#1/"�&01#�2.8)*$"&5:|.)%�.77$%�."�&01#�#.-181&'&1."�1#�0$%$+(�'88$9&$2�'#�&.�&0$�1&$*#�-1#&$25��̀01#�'b'%2�8."#)**'&$#&0$�8."&%'8&}�b0180�8."#1#&#�.7� ':�&0$�k.d$%"*$"&�#.-181&'&1."�'"2�(.)%�.77$%}�'"2� +:�&01#�8."&%'8&�'b'%25�q.�7)%&0$%�8."&%'8&)'-�2.8)*$"&�1#�"$8$##'%(5mf���<=>?�=<@��M�I?�CD�NC<�A=N�CA�CA�J?ABC<�=g�KCAMh?@��C�BM�<� ̀(9$�.%�9%1"&: m����<=>?�CD�NC<�A=N�M<��CDDMN?A� ̀(9$�.%�9%1"&:mf���BM�<=�gA? mf���@=�? m����g<M�?@�B�=�?B�CD�=>?AMN= m����@=�?nP

~J=�? CD

��������������eX��<?�C�M=�?@�=�A??>?<� eY��=[=A@G."&%'8&.%�'/%$$#�&.�7)%"1#0�'"2�2$-1d$%�'--�1&$*#�.%�9$%7.%*�'--�b.%a�%$,)1%$*$"&#�12$"&171$2."�&01#�7.%*�'"2�'"(�8."&1")'&1."�#0$$&#�7.%�&0$�8."#12$%'&1."�#&'&$2�1"�&01#�8."&%'8&5�̀0$%1/0&#�'"2�.+-1/'&1."#�.7�&0$�9'%&1$#�&.�&01#�8."&%'8&�#0'--�+$�/.d$%"$2�+(� ':�&01#8."&%'8&�'b'%2}� +:�&0$�#.-181&'&1."}�'"2� 8:�&0$�8-')#$#}�%$9%$#$"&'&1."#}8$%&1718'&1."#}�'"2�#9$81718'&1."#�1"8.%9.%'&$2�+(�%$7$%$"8$�1"�.%�'&&'80$2�&.�&01#�8."&%'8&5�8.91$#�&.�1##)1"/�.7718$5:

�f�g�B�N��emf;��� ;��g�B�N��mmf;���

B�=<@=A@�DCA>��;;e��A?o��X�ef�;��n=NZ

����������������� �
�������
�����
�����������

$� ��%&'()*&+,(('���������-./01.234�%5(�-637�89:.2�;<:0=.�:<�>2<=..?��������-./01.23�)<=6:0<@�A<?.4�(�'5��������*B-8�CDEFBG�BFEHIAF��������8C-��������5J+5�KFBG�LED8-K8M��������NIBBD*)8�NG�5OP(&�*B��������>.20<?�<9�>.29<2Q6@=.4�(5R(%R&(&+�:<�(OR&PR&(&+(((%����S8D8�>2<T.=:�U�E.V9<2?�L.@=W�K6:.2�X�B.Y.2��������IQZ2<1.Q.@:7

����[\]̂_̂ _̀̀\a_b̂c[ ������ �������ddc� ]_bc��efghfijk�lm�$� �� ]b������\d�̀̀ ^

1240LU26Q0043, Attachment 1 GAOA Rexford Sewer & Water System Replacement

Kootenai National Forest

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued.

Solicitation number 1240LU26Q0043 is issued as a Request for Quotation (RFQ) for the Base – Install water and sewer improvements at the Rexford Bench Campground. This project will include:

Base – Install water and sewer improvements at the Rexford Bench Campground. This project will include installing sewer lift stations, gravity system, sewer piping, installing and repairing water distribution lines, coordination with the local electric coop for power service, clearing and grubbing, erosion control, earth work, grading, repaving asphalt, directional drilling, and all miscellaneous needs associated with water and septic system installation and the ensuing dress up.

Option #1 – Install an RV dump station which include, grubbing, demolition, remove gravity sewer, sewer lines and accoutrements, signage, electrical service, disturbance reclamation, lighting.

Option #2 – Water supply improvements which include flowmeters, electrical service, water sampling station, vault boring and appurtenance, etc.

North American Industry Classification (NAICS): 237110 (Water and Sewer Line and Related Structures Construction): Size Standard is $45.0 M.

Set Aside: 100% small business set-aside.

Project Magnitude: $1,000,000 - $5,000,000

Bid Bond/Offer Guarantee (FAR 52.228-1): 20% required if quote is in excess of $150,000

Performance & Payment Bonds (FAR 52.228-15): Both required at 100% of original contract price if value in excess of $150,000, due 10 days after award. Only payment protections required for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter of credit or payment bond allowed per FAR 52.228-13, due within 10 days of contract award.

Provide quote by: 12:00 PM, Mountain Time on April 15th, 2026.

Site Visit: March 31, 2026 10:00 Mountain Time

DOCUMENTS TO RETURN:

The following documents shall be submitted by the quoter for evaluation to be considered responsive:

� Schedule of Items � A document demonstrating recent and relevant experience and past performance in respect to the size and scope of this particular project. See pages 12-14 for specific information to include.

� Bid guarantee per information above.

� Acknowledge Amendments (per the instructions in Block 11 on the SF-30) if applicable.

Send quote to: Forest Service, Property and Procurement Services, Intermountain Zone, CSA #9

Paula Sales, paula.sales@usda.gov and Lisa Rakich, lisa.rakich@usda.gov

For solicitation questions email paula.sales@usda.gov

Attachments:

See “Attachment 1 - Solicitation Terms and Conditions” (this document) for applicable clauses, instructions, and evaluation criteria. The following documents are included as attachments to this solicitation and can be accessed via the “Attachments/Links” section of the SAM.gov posting.

The following documents are included as attachments to this solicitation and will be a part of any resulting contract:

Attachment 2 – Schedule of Items Attachment 3 – Specifications, 465 pages Attachment 4 - Plan Set, 66 pages Attachment 5 – ACE ELE Specifications, 86 pages Attachment 6 – Geotechnical Report, 24 pages Attachment 7 – Wage Determination, General Decision Number: MT20260078 01/02/2026, 5 pages

Definitization of Equitable Adjustment for Change Orders - Pursuant to FAR 36.101-4(b), information regarding USDA’s definitization of equitable adjustments for change orders under construction contracts may be found at FAR 36.211 | USDA. USDA’s procedures that apply to the definitization of equitable adjustments for change orders under construction contracts may be found in 443.304 -70.

Federal Acquisition Regulation (FAR) and United States Department of Aquiculture Acquisition Regulation (AGAR) Clauses and Provisions

The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.

Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.

As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

52.252-2 Clauses Incorporated by Reference Feb 1998 mailto:paula.sales@usda.gov mailto:paula.sales@usda.gov https://www.usda.gov/da/ocp/ppd/policies-regulations/far

This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) ☐ Alternate I (Nov 2025) of 52.212-4

This is a commercial construction acquisition. FAR 52.212-4 is amended as follows:

(b) Inspection/Acceptance. Inspection and Acceptance will be conducted in accordance with FAR 52.246-12, Inspection of Construction (Aug 1996).

(d) Changes. Changes will be handled in accordance with the following FAR clause(s):

☐ FAR 52.243-4, Changes (Nov 2025) ☒ FAR 52.243-5, Changes and Changed Conditions (Nov 2025)

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025)

☐ Alternate I (Nov 2025) of 52.222-50 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025)

☐ Alternate I (Nov 2025) of 52.240-91 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)

The following clauses are applicable if checked:

☒ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6 ☐ 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) ☐ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 ☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) ☐ 52.204-91 Contractor identification (Nov 2025) ☒ 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) ☒ 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Sep 2025) ☒ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

☐ 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov 2025) ☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025)

☐ Alternate I (Mar 2020).

☒ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☐ 52.219-9 Small Business Subcontracting Plan (Nov 2025)

☐ Alternate III (Nov 2025) of 52.219-9.

☐ Alternate IV (Nov 2025) of 52.219-9

☒ 52.219-14 Limitations on Subcontracting (Nov 2025) ☐ 52.219-16 Liquidated Damages—Subcontracting Plan(Nov 2025) ☒ 52.219-33 Nonmanufacturer Rule (Nov 2025) ☒ 52.222-3 Convict Labor (June 2003) ☐ 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025) ☒ 52.222-35 Equal Opportunity for Veterans (Nov 2025)

☐ Alternate I (Jul 2014) of 52.222-35 ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025)

☐ Alternate I (Jul 2014) of 52.222-36 ☒ 52.222-37 Employment Reports on Veterans (Nov 2025) ☒ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ☒ 52.222-54 Employment Eligibility Verification (Nov 2025) ☒ 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) ☐ 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)

☐ Alternate I (May 2008) of 52.223-9 ☐ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Nov 2025) ☐ 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Nov 2025) ☒ 52.223-23 Sustainable Products and Services ☐ 52.224-3 Privacy Training (Jan 2017)

☐ Alternate I (Jan 2017) of 52.224-3 ☐ 52.225-1 Buy American-Supplies (Nov 2025)

☐ Alternate I (Oct 2022) of 52.225-1 ☐ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025)

☐ Alternate II (Nov 2025) of 52.225-3.

☐ Alternate III (Nov 2025) of 52.225-3.

☐ Alternate IV (Oct 2022) of 52.225-3

☐ 52.225-5 Trade Agreements (Nov 2023) ☐ 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States (May 2020)

☐ 52.225-26 Contractors Performing Private Security Functions Outside the United States (Oct 2016) ☐ 52.226-4 Notice of Disaster or Emergency Area Set-Aside (Nov 2007) ☐ 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area (Aug 2025) ☐ 52.229-12 Tax on Certain Foreign Procurements ☐ 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) ☐ 52.232-30 Installment Payments for Commercial Products and Commercial Services (Nov 2021) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☐ 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) ☐ 52.232-36 Payment by Third Party (Nov 2025) ☐ 52.240-92 Security Requirements (Nov 2025)

☐ Alternate II (Nov 2025) of 52.240-92 ☐ 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (No 2025) ☐ 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2025)

☐ Alternate I (Apr 2023) of 52.247-64.

☐ Alternate II (Nov 2021) of 52.247-64

The Contractor shall comply with the following FAR Clauses for Commercial Construction.

52.222-6 Construction Wage Rate Requirements 52.222-7 Withholding of Funds 52.222-8 Payrolls and Basic Records 52.222-9 Apprentices and Trainees 52.222-10 Compliance with Copeland Act Requirements 52.222-11 Subcontracts (Labor Standards) 52.222-12 Contract Termination-Debarment 52.222-14 Disputes Concerning Labor Standards 52.222-15 Certificate of Eligibility 52.236-5 Material and Workmanship

The following clauses are applicable when checked:

☐ 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Pricing Method (Aug 2018) ☐ 52.222-31 Construction Wage Rate Requirements-Price Adjustment (Percentage Method) (Aug 2018) ☐ 52.222-32 Construction Wage Rate Requirements-Price Adjustment (Actual Method) (Nov 2025) ☒ 52.223-2 Reporting of Biobased Products under Service and Construction Contracts (Nov 2025)

☒ 52.225-9 Buy American-Construction Materials (Nov 2025) ☐ Alternate I (Oct 2022) of 52.25-9 ☐ 52.225-11 Notice of Buy American Requirement-Construction Materials under Trade Agreements (Nov 2025) ☐ Alternate I (Nov 2025) of 52.225-11 ☐ Alternate II (Oct 2022) of 52.225-11 ☒ 52.228-2 Additional Bond Security (Oct 1997) ☒ 52.228-5 Insurance-Work on Government Installation (Jan 1997) ☒ 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) ☐ 52.228-13 Alternative Payment Protections (Jul 2020) ☒ 52.228-14 Irrevocable Letter of Credit (Nov 2014) ☒ 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) ☒ 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) (Feb 2021) ☒ 52.236-2 Differing Site Conditions (Jul 2025) ☒ 52.236-3 Site Investigation and Conditions Affecting the Work (Jul 2025) ☒ 52.236-6 Superintendent by the Contractor (Jul 2025) ☒ 52.236-7 Permits and Responsibilities (Jul 2025) ☒ 52.236-8 Other Contracts (Jul 2025) ☒ 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Jul 2025) ☒ 52.336-10 Operations and Storage Areas (Jul 2025) ☒ 52.236-11 Use and Possession Prior to Completion (Jul 2025) ☒ 52.236-12 Cleaning Up (Jul 2025) ☒ 52.236-13 Accident Prevention (Jul 2025) ☒ Alternate I (Nov 1991) of 52.236-13 ☒ 52.236-14 Availability and Use of Utility Services (Jul 2025) ☒ 52.236-15 Schedules for Construction Contracts (Jul 2025) ☐ 52.236-16 Quantity Surveys (Jul 2025) ☐ Alternate I (Apr 1984) of 52.236-16 ☒ 52.236-17 Layout of Work (Jul 2025) ☒ 52.236-21 Specifications and Drawings for Construction (Jul 2025) ☐ Alternate I (Apr 1984) of 52.236-21 ☒ Alternate II (Apr 1984) of 52.236-21 ☒ 52.242-14 Suspension of Work (Apr 1984) ☒ 52.248-3 Value Engineering (Oct 2025) ☐ Alternate I (Apr 1984) of 52.248-3

Other Applicable Clauses

52.217-6 Option for Increased Quantity (Mar 1989) The Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within 90 days. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree.

AGAR Clauses 452.204–70 Modification for Contract Closeout (Nov 2025)

(a) If unliquidated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (Contracting Officer) shall issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but will not be required to provide a signature. The Contracting Officer shall immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(b) Upon contract closeout for contracts utilizing SAP: if unliquidated funds of more than $1000 remain on the contract, the Contracting Officer shall issue a bilateral modification for deobligation.

The contractor will receive a copy of the modification and will be required to provide a signature.

(The Contracting Officer may also request a “Contractor Release of Claims” be completed by the contractor, although not required for contracts and orders using SAP.) If the bilateral modification and Release of Claims are not returned to the Contracting Officer within 60 days, the Contracting Officer shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(c) Upon contract closeout for contracts utilizing anything other than cost reimbursement, if unliquidated funds of more than $1000 remain on the contract, the Contracting Officer shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and a ‘‘Contractor Release of Claims’’ and will be required to provide a signature on both forms. If the bilateral modification and Release of Claims are not returned to the Contracting Officer within 120 days, the Contracting Officer shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(End of Clause)

452.222-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (Dec 2025)

(a) By entering into this contract, the Contractor certifies that:

(1) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution, and it will remain compliant for the duration of the contract.

(2) Neither it nor any subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution, and the Contractor and any subcontractor or teaming partner will not do so for the duration of the contract.

(b) If the Contractor participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, the Contractor certifies that it will remain compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.

(c) The Contractor affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the Contractor is not eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.

(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.

(e) Submission of a knowing false statement relating to Contractor’s compliance with the above requirements and/or eligibility for the contract may subject the Contractor to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.

(f) The Contractor must include the provisions of this clause in all subcontract solicitations.

(g) Failure on the part of the Contractor or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate this contract for default.

(End of Clause)

452.232-71 Progress Payments for Commercial Construction Contracts (Dec 2025)

(a) Contractor entitlement to progress payments. The Contractor may request progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished that meets the standards of quality established under the contract, as approved by the Contracting Officer.

(b) Computation of amounts. Progress payments will be authorized when the payment requested is properly due in accordance with this contract; the work will be performed in accordance with the contract; and there has been no impairment or diminution of the Government’s security under this contract. The Contracting Officer may authorize consideration of:

(3) Materials delivered on site and preparatory work;

(4) Materials delivered to the Contractor at locations other than the site, if:

i. Specifically authorized by the contract; and

ii. The Contractor provides satisfactory evidence of title and intended use in the contract.

(c) Contractor request for progress payments. The Contractor’s request for progress payments shall include the following:

(1) An itemization of the amounts requested, related to the various elements of work required by the contract;

(2) A listing of the amount included for work performed by each subcontractor;

(3) A listing of the total amount of each subcontract;

(4) A listing of the amounts previously paid to each subcontractor; and

(5) Additional supporting data in a form and detail required by the Contracting Officer.

(d) Contractor Certification. Each request for progress payment shall be accompanied by the following certification:

I hereby certify, to the best of my knowledge and belief, that—

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor’s performance.

________________________________________________(name) ________________________________________________(title) ________________________________________________(date)

(e) Access for verification of payment entitlement. To verify the Contractor’s entitlement to progress payments under this contract, the Contractor shall provide the Government, upon request and during normal business hours, access to the following:

(1) Records and Documentation:

(i) Certified progress payment requests and supporting documentation;

(ii) Subcontractor and supplier invoices, payment records, and lien waivers;

(iii)Updated schedule of values and progress schedules;

(iv) Quality assurance and inspection reports;

(v) Payroll records, if applicable under labor provisions.

(2) Facilities and Worksite Access:

(i) Physical access to the construction site for inspection of work progress;

(ii) Access to off-site storage locations for materials billed but not yet incorporated into the work; or (iii)Access to any fabrication facilities where contract-related work is being performed.

(3) Access to electronic invoicing or project management systems used to track progress and payments, if such systems are used in contract performance.

(f) Dates for payment. A progress payment under this clause is a contract progress payment under the Prompt Payment clause of this contract, and except as provided in paragraph (g) of this clause, approved requests shall be paid within 30 days of submittal of a proper request for payment.

(g) Liquidation of progress payments. Progress payments shall be liquidated by deducting from the payment of each item the total unliquidated amount of progress payments made for that separately priced unit of that line item. The liquidation amounts for each line item shall be clearly delineated in each request for progress payment submitted by the Contractor.

(h) Security for progress payments. In the event the Contractor fails to provide adequate security as required in this contract, no progress payment shall be made under this contract. Upon receipt of adequate security, progress payments shall be made, including all previous payments to which the Contractor is entitled, in accordance with the terms of the contract. If at any time the Contracting Officer determines that the security provided by the Contractor is insufficient, the Contractor shall promptly provide such additional security as the Contracting Officer determines necessary. In the event the Contractor fails to provide such additional security, the Contracting Officer may collect or liquidate such security that has been provided, and suspend further payments to the Contractor; the Contractor shall repay to the Government the amount of unliquidated progress payments as the Contracting Officer at his sole discretion deems repayable.

(i) Special terms regarding termination for cause. If this contract is terminated for cause, the Contractor shall, on demand, repay to the Government the amount of unliquidated progress payments. The Government shall be liable for no payment except as provided by the Termination for Cause paragraph of the clause at Federal Acquisition Regulation 52.212-4, Contract Terms and Conditions—Commercial Products and Commercial Services.

(j) Reservation of rights.

(1) No payment, vesting of title under this clause, or other action taken by the Government under this clause shall-

(i) Excuse the Contractor from performance of obligations under this contract; or

(ii) Constitute a waiver of any of the rights or remedies of the parties under the contract.

(2) The Government’s rights and remedies under this clause-

(i) Shall not be exclusive, but rather shall be in addition to any other rights and remedies provided by law or this contract; and

(ii) Shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.

(k) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-

(1) Notify the Contracting Officer of such performance deficiency; and

(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until-

(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or

(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.

(l) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.

(m) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as-

(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or

(2) Waiving the right of the Government to require the fulfillment of all the terms of the contract.

(3) The Government’s rights and remedies under this clause-

(i) Shall not be exclusive, but rather shall be in addition to any other rights and remedies provided by law or this contract; and

(ii) Shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.

(n) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (l) of this clause shall not apply to that portion of progress payments attributable to bond premiums.

(o) Final payment. The Government shall pay the amount due the Contractor under this contract after-

(1) Completion and acceptance of all work;

(2) Presentation of a properly executed voucher; and

(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor’s claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 ( 31 U.S.C.3727 and 41 U.S.C. 6305).

(p) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.

(End of clause)

Award Type

It is anticipated that a firm fixed price contract will be awarded as a result of this synopsis/solicitation.

Evaluation and Basis for Award

The provision at FAR 52.212-2, Evaluation—Commercial Products and Commercial Services is not applicable to this solicitation. In lieu of this provision, quotes will be evaluated in accordance with FAR 12.203 based on the criteria listed below. Award will be made to the quoter representing the best value to the Government.

Experience - The Government will consider the extent to which the vendor demonstrates relevant experience performing work similar in scope, size, and complexity to the requirements of this solicitation. Greater consideration will be given to vendors whose experience reflects a strong alignment with the project scope.

Relevancy: The Government will assess how closely the quoter’s experience aligns with the scope, size, complexity, and type of work described in this solicitation. The Government will make an independent determination of relevancy of the data provided or obtained. Relevancy will be rated as:

• Very Relevant – Essentially the same scope and complexity.

• Relevant – Similar in scope and complexity.

• Somewhat Relevant – Some similarities in scope or complexity.

• Not Relevant – Little or no similarity.

Confidence Assessment: Based on the relevancy and quality of experience, the Government will assign one of the following confidence ratings:

http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3727&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section6305&num=0&edition=prelim

• High Confidence – Government has a high expectation that the quoter understands the requirement and will be successful in performing the required work.

• Some Confidence – Government has a reasonable expectation that the quoter understands the requirement and will be successful in performing the required work.

• Low Confidence – Government has concerns that the quoter understands the requirement and will be successful in performing the required work.

Past Performance - Quoters shall provide a short narrative for five (5) relevant contracts (references) completed within the preceding five (5) year period.

If no relevant contracts are available, the five (5) most recent contracts completed in the last five (5) years shall be used. Contracts listed may include those with the Federal Government, State and Local Governments or their agencies, and Commercial Customers. If a quoter has no relevant past performance history, the quoter must affirmatively state that it possesses no relevant past performance history.

The Government will evaluate the quoter’s past performance to assess the degree of confidence that the quoter will successfully perform the required effort. The evaluation will consider recency, relevancy and quality of past performance.

Relevancy: The Government will assess how closely the quoter’s past performance aligns with the scope, size, complexity, and type of work described in this solicitation. The Government will make an independent determination of relevancy of the data provided or obtained. Relevancy will be rated as:

• Very Relevant – Essentially the same scope and complexity.

• Relevant – Similar in scope and complexity.

• Somewhat Relevant – Some similarities in scope or complexity.

• Not Relevant – Little or no similarity.

Quality of Performance: The Government will evaluate the quality of the quoter’s performance on prior contracts, including:

• Timeliness of performance

• Technical quality

• Cost control (if applicable)

• Business relations

• Customer satisfaction

Sources may include CPARS, past performance questionnaires, and other verifiable references. The Government reserves the right to limit or expand the number of references it decides to contact and to contact references other than those provided by the quoter.

Confidence Assessment: Based on the relevancy and quality of past performance, the Government will assign one of the following confidence ratings:

• High Confidence – Government has a high expectation of successful performance.

• Some Confidence – Government has a reasonable expectation of success.

• Low Confidence – Government has concerns about successful performance.

• Neutral Confidence – No relevant past performance available; no positive or negative inference will be made.

Note: Quoters without relevant past performance will not be rated favorably or unfavorably but will receive a Neutral Confidence rating.

Document to return with quote for Experience and Past Performance: Quoters shall submit a short narrative of at least 5 projects, completed within the last 5 years, providing details of the experience your firm has (either as a prime or sub-contractor) for work similar in nature and scope similar to this requirement. At a minimum this information shall include:

- Project name/title

- Geographic location

- Quoters role as prime or subcontractor

- Indicate whether subcontractors were utilized or if the work was self-performed

- Dates of performance

- Description of the work performed

- Contract value

- Customer name or organization

- Contracting officer or customer name, phone number and email address

Price: Any quantity price discounts and discounts for prompt payment should be included in this section. The quoter shall provide pricing as requested in the schedule of items on pages 2-4. Total price evaluation will be for the base items and all option items. Failure to propose pricing for the base items and all option items on individual line items may result in a quotation being excluded from further consideration. The quoter’s quotation will be evaluated in accordance with FAR 12.204, to determine if it is fair and reasonable.

Evaluation Method:

The Government intends to evaluate quotations using a comparative evaluation methodology. This means quotations will be compared against one another to determine which provides the best value to the Government, based on the evaluation factors outlined in this solicitation.

The Government may consider quotations that exceed minimum requirements and offer additional value or benefits, even if they are not the lowest priced. However, formal tradeoff procedures will not be conducted.

52.252-1 Solicitation Provisions Incorporated by Reference Feb 1998 This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The quoter is cautioned that the listed provisions may include blocks that must be completed by the quoter and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the quoter may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.212-1 Instructions to Offerors - Commercial Products and Commercial Services (Nov 2025) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017) 52.240-90 Security Prohibitions and Exclusions Representations and Certifications (Nov 2025)

The following provisions are applicable if checked:

☒ 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (Sep 2024) ☒ 52.204-7 System for Award Management—Registration (Nov 2025)

☐ Alternate I (Nov 2025) to 52.204-7

Other Applicable FAR Provisions

52.217-5 Evaluation of Options (Nov 2025) 52.225-10 Notice of Buy American Requirement - Construction Materials (May 2014) 52.233-2 Service of Protest (Sep 2025)

When checked, the Contractor shall comply with the following FAR Clauses for Commercial Construction.

☒ 52.222-5 Construction Wage Requirements, Secondary Site of the Work (Nov 2025) ☒ 52.225-10 Notice of Buy American Requirement- Construction Materials (May 2014) ☐ 52.225-12 Notice of Buy American Requirement-Construction Materials under Trade Agreements (May 2014) Alternate I (May 2014) of 52.225-12 Alternate II (Nov 2023) of 52.225-12 ☒ 52.228-1 Bid Guarantee (Sep 1996)

AGAR Provisions 452.203-70 Anti-Discrimination & Diversity, Equity, &Inclusion (DEI) Certification (Dec 2025)

(a) By submission of its offer, the offeror certifies that:

(1) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution.

(2) Neither it nor any proposed subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution.

(b) If the offeror participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, by submission of its offer, the offeror certifies that it is compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.

(c) The offeror affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the offeror will not be eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.

(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.

(e) Submission of a knowing false statement relating to offeror’s compliance with the above requirements and/or eligibility for the contract may subject the offeror to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.

(f) Failure on the part of the offeror or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate the contract for default.

(End of Provision)

NOTICE FOR FILING AGENCY PROTESTS

United States Department of Agriculture (USDA) Ombudsman Program

The USDA is committed to issuing solicitations and awarding contracts in a fair and prompt manner.

The Ombudsman Program for Agency Protests (OPAP) was established to address protest issues within the agency, providing an alternative to costly and time-consuming litigation. Operating independently, OPAP offers relief comparable to that granted by the Government Accountability Office (GAO). Interested parties are encouraged to resolve concerns through USDA’s internal Alternative Dispute Resolution (ADR) process before pursuing external forums such as the GAO.

Concerns may be addressed informally or through a formal agency protest filed with either the Contracting Officer or the Ombudsman.

Informal Forum with the Ombudsman

1. Initial Point of Contact: Interested parties who believe a specific USDA procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer.

2. Escalation: If the Contracting Officer is unable to address their concerns, interested parties are encouraged to contact the USDA Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Utilization of the informal forum does not suspend any time requirement for filing a formal protest with the agency or other forums.

3. Required Information: To ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman

1. Effort to Resolve: Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions.

2. Independent Review: If the protester’s concerns remain unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest with either the Contracting Officer or, alternatively, with the Ombudsman under the OPAP program. Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined in writing to be in the best interest of the Government.

3. Resolution Timeline: The agency’s goal is to resolve protests within 35 calendar days from the date of filing.

4. Required Information: Protests shall include the information set forth in FAR 33.104(a)(3).

Failure to submit the required information may result in a delay or dismissal of the protest.

5. Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.

6. Submission: Formal protests under the OPAP program should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer.

Election of Forum. By initiating a protest with the USDA, the protester agrees not to pursue the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If a protest is filed externally, the agency protest will be dismissed.