1240LU24R0004 Construction_RFP_CCC Campground Updates DPG.docx

DOCX document 104 KB Posted

Attached to
Civilian Conservation Corps Campground Updates Dakota Prairie Grasslands
Solicitation number
1240LU24R0004
Issued by

About this file

This request for proposal from the Department of Agriculture Forest Service solicits offers for a construction project to reconstruct three campground loops and associated facilities at the Civilian Conservation Corps Campground near Maah-Daah-Hey in North Dakota. Offerors must complete all items in the total base bid, optional item bid, and Bureau of Indian Affairs funded item bid. The period of performance is from July 15, 2024 through November 15, 2024. Proposals will be evaluated on past performance, experience, technical approach, and price, with non-price factors being approximately equal to price.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 1240LU24R0004 Project Name: CCC Campground Updates Dakota Prairie Grasslands

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

i. The solicitation number and a statement that the solicitation is issued as a Request for Proposal RFP).

ii. A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2023-06 dated 12/04/2023.

iii. A notice regarding any set-aside and the associated NAICS code 237990 Other Heavy and Civil Engineering Construction, size standard $39.5 Million.

iv. A list of line-item number may be found in Section B.1 Schedule of Items.

v. Description of requirements for the items to be acquired may be found in Section B.1 Schedule of Items.

vi. Date(s) and place(s) of delivery and acceptance and FOB point may be found in Section L Instructions, Conditions, and Notices to Offerors or Respondents.

vii. A statement that the provision at 52.212-3, may be found in Section K Provisions.

viii. A statement regarding the applicability of the provision may be found in Section K Provisions.

ix. A statement advising offerors to include a completed copy of the provision point may be found in Section L Instructions, Conditions, and Notices to Offerors or Respondents.

x. A statement regarding any additional contract requirement(s) or terms and conditions (such as contract financing arrangements or warranty requirements) determined by the contracting officer to be necessary for this acquisition and consistent with customary commercial practices may be found in Section I—Contract Clauses.

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

See 1240LU24R0004- Attachment 1 – Schedule of Items CCC Campground Update Dakota Prairie Grasslands

B.2 SCHEDULE NOTES

a) Basis of Award: The bidder must bid on all items in the total base bid, option item bid and BIL funded item bid. Round to the nearest cent. One award will be made from this solicitation.

b) Intent of Contract is to award all items in both schedules. Optional items will be awarded based on availability of funding.

c) In the event of an error in extending the bid prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations.

d) Offers for Quantities less than those listed in the numbered items may be rejected.

e) Payment for bond premiums in accordance with FAR 52.232-5. Payments under Fixed-Price Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.

f) The pay items in the Schedule of Items may have suffixes that do not appear on the pay items in the specifications. The suffixes pertain only to sizes, classes, and/or types indicated in the item ‘Descriptions,’ and are used by the Government for computer tabulation of bid schedules.

g) One contract will be awarded to the responsive and responsible bidder offering the best value to the Government (see Section M – Evaluation Factors for Award).

h) The successful Contractor must be registered in the System for Award Management (SAM) data base (reference Section I, FAR 52.204-7) before an award is issued.

i) This is a Request for Proposal (RFP); no public opening will be held. Results will not be made public prior to award. Offers submitted in response to this RFP will not be returned and will be retained by the U.S. Forest Service for official record purposes. This RFP does not commit the Government to pay any costs incurred in the preparation or the submission of a quote, or to make any award.

j) Offers received after the stated closing date and time for submission, specified in Section L, will be deemed late and will not be considered for award. Vendors are urged to thoroughly read the solicitation and to review all attachments prior to preparing and submitting an offer.

k) Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract.

l) Complete the Representations and Certifications electronically via the System for Award Management (SAM) website at https://www.sam.gov THIS IS A FREE REGISTRATION.

m) Contractor must provide acknowledgement of Amendment(s) (If Any)

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

This project consists of reconstructing Civilian Conservation Corps Campground Updates Near Maah-Daah-Hey 1CB known as CCC Campground and reconstructing three campground loops with associated camp units. The work will be performed on the roads, parking spurs, living spaces, paths/trails, new water and well improvements, electrical hookups/distributions system and new toilet(s).

A copy of the CAD drawing will be provided to the Contractor for surveying and construction staking. It is the Contractor’s responsibility to extract any necessary data for surveying and construction staking.

The work will include but not be limited to construction staking and blue topping, clearing and grubbing, demolition and disposal, excavation, grading, roadway demolition, salvage and reuse of existing gravel surfacing, furnishing and placing new aggregates, furnishing and installing culverts, signs, toilet, picnic tables, fire rings, grills, living space timber borders, parking blocks, corrals, manure stations, hitching rails, bike racks, bike washing stations, new electrical improvements, water well improvements, and new water distribution system. There is approximately 100 bank cy of excavation that will be collected at approved borrow locations with 1 mile of the campground entrance.

The contractor shall be responsible for salvaging all pay tubes, designated signage, well hand pump, and other government property as identified by the CO. All identified salvaged materials will be the property of the Forest Service and shall be stockpiled at the USFS office location in Watford City, ND. The contractor shall be responsible for loading salvaged items, transporting, and offloading at the USFS office location in Watford City, ND.

The Contractor will dispose of unsalvageable picnic tables, fire rings, grills, signage, information boards, posts, culverts, horse hitching rails, horse loading/offloading unit, concrete, and other miscellaneous items in a lawful manner off National Forest System Lands.

The contractor shall construct new well improvements and new water distribution system improvements following all water design report requirements and specifications.

The Contractor shall be required to clean up and dispose of all construction waste in a lawful manner off National Forest System Lands.

C.2 PROJECT LOCATION

The project is located on the McKenzie Ranger District in McKenzie County, North Dakota. CCC Campground is in Section 3, T147N, R99W, 1 mile off Highway 85 and immediately south of the Little Missouri River.

C.3PERIOD OF PERFORMANCE
The Period of Performance is July 15,2024 through November 15, 2024. It is estimated it will take up to one hundred and twenty days to complete this project.

C.4 MAGNITUDE OF CONSTRUCTION PROJECT

The Magnitude of Construction for this project is between $500,000 and $1,000,000.

C.5 TECHNICAL SPECIFICATIONS

This project makes use of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) U.S. Customary Units. Copies are available electronically on the U.S. Department of Transportation Federal Highways Administration website at https://highways.dot.gov/sites/fhwa.dot.gov/files/docs/federal-lands/specs/12851/fp14.pdf

C.6 GOVERNMENT FURNISHED PROPERTY

A copy of the CAD drawing will be provided to the Contractor for surveying and construction staking. It is the Contractor’s responsibility to extract any necessary data for surveying and construction staking.

452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

D.1 PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.

D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

52.246-12Inspection of Construction (AUG 1996)
52.246-13Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

52.236-15Schedules for Construction Contracts (APR 1984)
52.242-14Suspension of Work (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/31/2024 The time stated for completion shall include final cleanup of the premises.

F.2 OTHER REQUIREMENTS

Submittals. Contractor shall submit all required submittals including but not limited to the following: tests for aggregate, well log, all water system components and other required water development submittals, work schedule, copies of manufacturer’s instructions and specifications, colors, and warranty information to the Contracting Officer’s Representative. Additional submittals are located in the specifications.

Work Schedule. The Contractor shall supply a work schedule prior to starting the project. The Contractor shall notify the Contracting Officer a minimum of 48 hours in advance of changes in the work schedule.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled by contacting the Contracting Officers’ Representative (COR) Curtis Grudniewski at curtis.grudniewski@usda.gov or 707-227-7855.

G.2 OTHER REQUIREMENTS

None

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

452.228-71 Insurance Coverage (NOV 1996) Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence. (2) The Contractor shall have property damage liability insurance shall be required in the amount of $200K per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

452.237-74 Key Personnel (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel: On site Supervisor.

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H.2 OTHER REQUIREMENTS

Security and Protections. Security is the responsibility of the Contractor. The Contractor shall be responsible for protecting all equipment and supplies for use on the project and stored on site. The Contractor shall be responsible for all costs required to provide such protection. The Government is not responsible for equipment or supplies.

Staging Area. The Contractor shall coordinate with the COR on a staging area location. Staging will be allowed at a specified area at CCC Campground. The campground shall be closed during the construction. The Contractor shall operate all equipment and store, transport and handle materials in a manner that will not damage the existing roads, parking lots, and landscaping on federal lands or adjacent properties.

Existing Utilities. It is solely the Contractor’s responsibility to locate the utilities prior to excavation. Contractor is responsible for calling One Call 1-800-795-0555 before you dig.

Safety Plan. The Contractor shall provide adequate safety briefings and ensure safe practices are followed by all personnel involved in the project. Emergency contact numbers shall be readily available on site. A safety plan shall be submitted to the COR prior to starting work.

Protection of Improvements. The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract. In addition to the requirements of the Use of Premises Clause, AGAR 452.236-70, all existing facilities including but not limited to fences, cattleguards, and drainage structures damaged by the Contractor shall be replaced or repaired by the Contractor at no additional cost to the Government.

Water. There may be potable water available on this site for drinking purposes. Contractor shall furnish water for all construction needs including suitable moisture for compaction and processing, flushing, and testing.

Toilet Facilities. There are available toilets on this job. The Contractor shall keep the toilets clean and is responsible for all costs, maintenance, and upkeep of the toilet during the performance of the contract. The toilets shall be cleaned at the end of the project and prior to final acceptance.

Pollution and Erosion Control. During all operations under this contract, the Contractor shall exercise reasonable measures to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes, from the Contractor’s operations including but not limited to job site, staging area and equipment maintenance areas shall be stored, collected, and disposed of in a sanitary and nuisance-free manner. Refuse shall be disposed of in State-approved landfills as approved by the COR. During all the work, the Contractor shall make every reasonable effort to direct surface runoff water to stabilized waterways and to keep the drainage systems functioning effectively to minimize soil erosion and water pollution.

Noxious Weed Control. In order to prevent the potential spread of noxious weeds, the Contractor shall be required to furnish proof of weed-free equipment. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the construction area. All subsequent move-ins shall be treated the same as the initial move-in. Prior to move-in, the contractor shall make equipment available for Forest

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses: https://www.acquisition.gov/agar (AGAR clauses begin with 452) FAR and AGAR Deviations to clauses may be viewed at: Policies & Regulations | USDA

52.202-1Definitions (JUN 2020)
52.203-3Gratuities (APR 1984)
52.203-5Covenant against Contingent Fees (MAY 2014)
52.203-6Restrictions on Subcontractor Sales to the Government (JUN 2020)
52.203-7Anti-Kickback Procedures (JUN 2020)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014)

52.203-10Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014)
52.203-12Limitation on Payments to Influence Certain Federal Transactions (JUN 2020)
52.203-17Contractor Employee Whistleblower Rights & Requirements to Inform Employees of Whistleblower Rights (JUN 2020) (Whistleblower Guidance to contractor employees)
52.203-19Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
52.204-2Security Requirements (MAR 2021) Alternate II (APR 1984)
52.204-4Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011)
52.204-10Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020)
52.204-13System for Award Management Maintenance (OCT 2018)
52.204-14Service Contract Reporting Requirements (OCT 2016)
52.204-18Commercial and Government Entity Code Maintenance (AUG 2020)
52.204-19Incorporation by Reference of Representations and Certifications (DEC 2014)
52.204-23Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021)
52.204-25Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)

52.204–28 Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts 52.204–30 Federal Acquisition Supply Chain Security Act Orders—Prohibition 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021)

52.209-9Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018)
52.209-10Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015)
52.215-2Audit and Records -- Negotiation (JUN 2020)
52.215-8Order of Precedence—Uniform Contract Format (OCT 1997)
52.219-6Notice of Total Small Business Set-Aside (NOV 2020)
52.219-8Utilization of Small Business Concerns (SEP 2023)
52.219-9Small Business Subcontracting Plan (SEP 2023)
52.219-14Limitations on Subcontracting (OCT 2022)

☐ By the end of the base term of the contract and then by the end of each subsequent option period; or ☐ By the end of the performance period for each order issued under the contract.

52.219-16Liquidated Damages --Subcontracting Plan (SEP 2021)
52.219-28Post Award Small Business Program Rerepresentation (SEP 2023)
52.222-3Convict Labor (JUN 2003)
52.222-4Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018)
52.222-6Construction Wage Rate Requirement (AUG 2018)
52.222-7Withholding of Funds (MAY 2014)
52.222-8Payrolls and Basic Records (JUL 2021)
52.222-9Apprentices and Trainees (JUL 2005)
52.222-10Compliance with Copeland Act Requirements (FEB 1988)
52.222-11Subcontracts (Labor Standards) (MAY 2014)
52.222-12Contract Termination - Debarment (MAY 2014)
52.222-13Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014)
52.222-14Disputes Concerning Labor Standards (FEB 1988)
52.222-15Certification of Eligibility (MAY 2014)
52.222-21Prohibition of Segregated Facilities (APR 2015)
52.222-26Equal Opportunity (APR 2016)
52.222-27Affirmative Action Compliance Requirements for Construction (APR 2015)
52.222-30Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Pricing Method) (AUG 2018)
52.222-35Equal Opportunity for Veterans (JUN 2020)
52.222-36Equal Opportunity for Workers with Disabilities (JUN 2020)
52.222-37Employment Reports on Veterans (JUN 2020)
52.222-40Notification of Employee Rights Under National Labor Relations Act (DEC 2010)
52.222-50Combating Trafficking in Persons (NOV 2021)
52.222-54Employment Eligibility Verification (MAY 2022)
52.222-55Minimum Wages for Contractor Workers under Executive Order 14026 (JAN 2022)
52.222-62Paid Sick Leave under Executive Order 13706 (JAN 2022)
52.223-2Affirmative Procurement of Biobased Products under Service and Construction Contracts (SEP 2013)
52.223-5Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6Drug-Free Workplace (MAY 2001)
52.223-12Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016)
52.223-17Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (AUG 2018)
52.223-18Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020)
52.225-13Restrictions on Certain Foreign Purchases (FEB 2021)
52.226-1Utilization of Indian Organizations and Indian-Owned Economic Enterprises (JUN 2000)
52.227-1Authorization and Consent (JUN 2020)
52.227-2Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020)
52.227-4Patent Indemnity -- Construction Contracts (DEC 2007)
52.228-2Additional Bond Security (OCT 1997)
52.228-5Insurance – Work on a Government Installation (JAN 1997)
52.228-12Prospective Subcontractor Requests for Bonds (DEC 2022)
52.228-14Irrevocable Letter of Credit (NOV 2014)
52.229-3Federal, State, and Local Taxes (FEB 2013)
52.229-4Federal, State, and Local Taxes (State and Local Adjustments) (FEB 2013)
52.232-5Payments under Fixed-Price Construction Contracts (MAY 2014)
52.232-17Interest (MAY 2014)
52.232-23Assignment of Claims (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts (JAN 2017)

52.232-33Payment by Electronic Funds Transfer – System for Award Management (OCT 2018)
52.232-39Unenforceability of Unauthorized Obligations (JUN 2013)
52.232-40Providing Accelerated Payments to Small Business Subcontractors (MAR 2023)
52.233-1Disputes (MAY 2014) Alt 1 (DEC 1991)
52.233-3Protest after Award (AUG 1996)
52.233-4Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2Differing Site Conditions (APR 1984)
52.236-3Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5Material and Workmanship (APR 1984)
52.236-6Superintendence by the Contractor (APR 1984)
52.236-7Permits and Responsibilities (NOV 1991)
52.236-8Other Contracts (APR 1984)
52.236-9Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
52.236-10Operations and Storage Areas (APR 1984)
52.236-11Use and Possession Prior to Completion (APR 1984)
52.236-12Cleaning Up (APR 1984)
52.236-13Accident Prevention (NOV 1991)
52.236-14Availability and Use of Utility Services (APR 1984)
52.236-17Layout of Work (APR 1984)
52.236-21Specifications and Drawings for Construction (FEB 1997)

Alternate I (APR 1984) Alternate II (APR 1984)

52.242-13Bankruptcy (JUL 1995)
52.243-4Changes (JUN 2007)
52.244-2Subcontracts (JUN 2020)
52.244-6Subcontracts for Commercial Products and Commercial Services (SEP 2023)
52.245-1Government Property (SEP 2021) - Alt 1 (APR 2012)
52.245-9Use and Charges (APR 2012)
52.246-21Warranty of Construction (MAR 1994)

Alternate I (MAR 1994)

52.248-3Value Engineering – Construction (OCT 2020)
52.249-2Termination for Convenience of the Government (Fixed-Price) (APR 2012) Alternate I (SEP 1996)
52.249-3Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements) (APR 2012)
52.249-10Default (Fixed-Price Construction) (APR 1984)

Alternate I (APR 1984)

52.253-1Computer Generated Forms (JAN 1991)
452.232-70Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)
452.236-70Additive or Deductive Items (FEB 1988)
452.236-71Prohibition Against the Use of Lead-Based Paint (NOV 1996)
452.236-72Use of Premises (NOV 1996)
452.236-73Archaeological or Historic Sites (FEB 1988)
452.236-74Control of Erosion, Sedimentation, and Pollution (NOV 1996)
452.236-76Samples and Certificates (FEB 1988)
452.236-77Emergency Response (NOV 1996)

52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023)

(a) Definitions. As used in this clause— Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.

Information technology, as defined in 40 U.S.C. 11101(6)—

(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use—

(i) Of that equipment; or

(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;

(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but

(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.

(b) Prohibition. Section 102 of Division R of the Consolidated Appropriations Act, 2023 (Pub. L. 117-328), the No TikTok on Government Devices Act, and its implementing guidance under Office of Management and Budget (OMB) Memorandum M-23-13, dated February 27, 2023, “No TikTok on Government Devices” Implementation Guidance, collectively prohibit the presence or use of a covered application on executive agency information technology, including certain equipment used by Federal contractors. The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor’s employees; however, this prohibition does not apply if the Contracting Officer provides written notification to the Contractor that an exception has been granted in accordance with OMB Memorandum M-23-13.

(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts, including subcontracts for the acquisition of commercial products or commercial services.

52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)

(a) Definitions. As used in this clause— “Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”

“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall—

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and

(2) Submit this estimate to patricia.newberry@usda.gov.

52.225-9 Buy American Act-Construction Materials (OCT 2022)

(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if– (A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all component used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

None

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.

(B) For domestic construction material that is a critical item or contains critical components.

(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1) (i)Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description
Unit of Measure
Quantity
Price (Dollars)*

Item1

Foreign construction material
_______
_______
_______
Domestic construction material
_______
_______
_______

Item 2

Foreign construction material
_______
_______
_______
Domestic construction material
_______
_______
_______

[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] (End of clause)

52.228-1 Bid Guarantee (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –

(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3M, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.228-11 Individual Surety - Pledge of Assets (FEB 2021) (DEVIATION MAY 2023)

(a) The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond - (1)A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and

(2) Standard Form 28, Affidavit of Individual Surety, [except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the Standard Form 28 is not required to be sworn and notarized in block 12].

(b)The Contracting Officer may release a portion of the security interest on the individual surety's assets based upon substantial performance of the Contractor's obligations under its performance bond. The security interest in support of a performance bond shall be maintained—

(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.

(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.

(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.

(c) A surety's assets pledged in support of a payment bond may be released to a subcontractor or supplier upon Government receipt of a Federal district court judgment, or a sworn statement by the subcontractor or supplier that the claim is correct along with a notarized authorization of the release by the surety stating that it approves of such release. The security interest on the individual surety's assets in support of a payment bond shall be maintained—

(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 which require performance and payment bonds (40 U.S.C. 3131). For 1 year following final payment, or until resolution of all pending claims filed against the payment bond during the 1-year period following final payment, whichever is later.

(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.

(3) Other contracts not subject to the requirements of paragraph (c)(1) of this clause. For 90 days following final payment.

(d)The Contracting Officer may allow the Contractor to substitute an individual surety, for a performance or payment bond, after contract award. The Contractor shall comply with the requirements of paragraph (a) of this clause within the timeframe established by the Contracting Officer.

52.228-15 Performance and Payment Bonds -- Construction (JUN 2020) (DEVIATION MAY 2023) (a)Definitions. As used in this clause -- “Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance Bonds (Standard Form 25, EXCEPT THAT A SEAL IS NOT REQUIRED). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds (Standard Form 25-A, EXCEPT THAT A SEAL IS NOT REQUIRED). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(3) Additional bond protection.

(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier’s check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:

U.S. Department of Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782 Or via the internet at http://www.fms.treas.gov/c570/.

(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .