1240LU24R0004-0001 Amendment Attachment 1 Plan Changes CCC Campground Updates DPG.docx

DOCX document 14 KB Posted

Attached to
Civilian Conservation Corps Campground Updates Dakota Prairie Grasslands
Solicitation number
1240LU24R0004
Issued by

About this file

This document contains an amendment attachment with plan changes for the Civilian Conservation Corps Campground Updates Dakota Prairie Grasslands solicitation. The amendment provides three clarifications to the plans on sheets E2.0 and E3.0, adjusting the utility allowance amount, changing the feeder size on circuit MDP-1 from a single run to a parallel run due to voltage drop concerns, and clarifying that a #3/0 ground conductor must be provided with all #250 KCMIL direct bury conductors. The related solicitation is for Civilian Conservation Corps Campground Updates at the Dakota Prairie Grasslands, issued by the Department of Agriculture Forest Service with solicitation number 1240LU24R0004.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

a. Plan Changes CCC Campground Updates DPG

Item 1 – Sheet E2.0, Note 1: Change utility allowance amount to $4,500. Coordinate requirements with McKenzie Electric Cooperative.

Item 2 – Sheet E2.0, Circuit MDP-1: Change feeder size on circuit MDP-1 from a single run of 3#250 KCMIL and #3/0 Ground to parallel run of 3#250 KCMIL and #3/0 Ground (for voltage drop). Note that lugs in pedestals are already configured for parallel conductors.

Item 3 – Sheet E3.0, Detail 5: Clarification – provide #3/0 ground conductor with all #250 KCMIL direct bury conductors (250-250-250-3/0 direct bury cable typical).