1240LU24Q0043 Attachment 2 - Maps and Plans.pdf
PDF 12 MB Posted
- Attached to
- GAOA MT Bitterroot - Rombo Campground Shoreline Stabilization Federal contract opportunity
- Solicitation number
- 1240LU24Q0043
- Issued by
- Department of Agriculture Forest Service
About this file
This document appears to be a set of maps and plans related to the Bitterroot Rombo Campground Shoreline Stabilization project solicited by the U.S. Forest Service. The key details are:
The U.S. Forest Service is seeking to stabilize the shoreline at the Bitterroot Rombo Campground located in the Bitterroot National Forest. The maps and plans included in this document provide detailed information about the project site and scope of work. No specific response dates, award information, pricing terms, or set-asides are provided in this attachment. This appears to be a supplementary document that provides additional context and technical details related to the overall federal contract opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1240LU24Q0043-0002 GAOA MT Bitterroot Rombo Campground Shoreline Stabilization.pdf | ||
| Sol_1240LU24Q0043-P0001.pdf | ||
| 1240LU24Q0043 Attachment 4 - Rombo Campground Shoreline Stabilization Project - Technical Specifications.pdf | ||
| 1240LU24Q0043 Attachment 3 - Rombo Campground Shoreline Stabilization Project - Special Provisions.pdf | ||
| 1240LU24Q0043 Attachment 6 - Wage Determination WD MT20240078.pdf | ||
| 1240LU24Q0043 SF1442 RFQ Bitterroot Rombo Campground.pdf | ||
| 1240LU24Q0043 Attachment 1 - Statement of Work.pdf | ||
| 1240LU24Q0043 Attachment 5 - Rombo Wood Locations.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF AGRICULTURE FOREST SERVICE, REGION ONE
CONSTRUCTION PLANS FOR:
ROMBO CAMPGROUND SHORELINE STABILIZATION PROJECT
BITTERROOT NATIONAL FOREST
WEST FORK RANGER DISTRICT
RAVALLI COUNTY, MONTANA
INDEX TO SHEETS
No. DESCRIPTION
0 COVER PAGE
1 EXISTING CONDITIONS & SURVEY CONTROL
2 SITE ACCESS, STAGING, AND WORK ISOLATION PLAN
3 PLAN VIEW AND PROFILE
4 MATERIALS AND QUANTITIES
5 LARGE WOOD STRUCTURE DETAIL
6 VEGETATED WOOD MATRIX DETAILS
7 WILLOW TRENCH DETAIL
8 CROSS SECTIONS
9 BMP DETAILS
100 % DESIGN
GOVERNMENT FURNISHED ITEMS
BORROW SITE
WASTE SITE
LEGAL DESCRIPTION:
NW 1/4 S11, T1S R22W, P.M.,M
RAVALLI COUNTY, MONTANA
VICINITY MAP
SOUTHWESTERN MONTANA
FOREST ENGINEER
REVIEWED:
BITTERROOT NATIONAL FOREST
DATE
WEST FORK DISTRICT RANGER
RECOMMENDED:
BITTERROOT NATIONAL FOREST
FOREST SUPERVISOR
APPROVED:
DATE
DATE
BITTERROOT NATIONAL FOREST
REGION 1
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
WYATT
AutoCAD SHX Text
42005 PE
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text
NATHAN M.
0+00
1+00 2+00 3+00
4+00
5+00
6+00 7+00
8+00
9+00
10+00
11+00
12+00
12+38
EXISTING SITE CONDITIONS
1" = 100'
CONTROL POINTS
POINT NUMBER EASTING NORTHING POINT ELEVATION RAW DESCRIPTION
100 749292.1150' 590088.5520' 4472.348' 5/8" REBAR WITH A 2" ALUMINUM
CAP MARKED "RDG"
101 748993.2320' 589681.2170' 4476.959' 5/8" REBAR WITH A 2" ALUMINUM
CAP MARKED "RDG"
PROJECT DATUM
THE PROJECT COORDINATES ARE BASED ON
THE FOLLOWING:
HORIZONTAL
PROJECTION: MONTANA STATE PLANE
HORIZONTAL
DATUM:
NAD83 (CORS96 2002.00)
UNITS: US SURVEY FEET
VERTICAL
DATUM:
NAVD88 (GEOID 9)
TOPOGRAPHY AND CROSS SECTION
GROUND LINES ARE BASED
ON SURVEY WORK PERFORMED BY RDG IN
OCTOBER 2022. LIDAR DATA WAS
ACQUIRED IN 2019 AND MERGED WITH RDG
GROUND SURVEY.
PLAN VIEW
IMAGE: MAXAR 2022
CONTROL
POINT 100
CONTROL
POINT 101
USDA FO
REST S
ERVICE
TO WEST FORK ROAD (473)
USDA FO
REST S
ERVICE
EXISTING ALIGNMENT
ROMBO CREEK CAMPGROUND ROAD
SITE PHOTO: A
A
B C
SITE PHOTO: B
SITE PHOTO: C
F l o w
CONSTRUCTION EXTENTS
WEST FORK
BITTERROOT RIVER
100 % DESIGN
Sheet: 1 of 9
Drawn By: LS
Designed By: NW
Drawing Checked: NW
Design Checked: MD
ROMBO CAMPGROUND
EXISTING CONDITIONS & SURVEY CONTROL
0+50
1+00
1+50
2+00
2+50 3+00 3+50 4+00 4+50
5+00
5+50
6+00
6+50
7+00
7+50
8+00
8+50
9+00
9+50
10+00
10+50
11+00
11+50
12+00
12+50
12+74
IMAGE: MAXAR 2022
USDA FO
REST S
ERVICE
TO WEST FORK ROAD (473)
USDA FO
REST S
ERVICE
ROMBO CREEK CAMPGROUND ROAD
F l o w
ISOLATED WORK AREA/
CONSTRUCTION EXTENTS
WEST FORK
BITTERROOT RIVER
ACCESS, STAGING AND WORK ISOLATION PLAN VIEW
1" = 100'
DIRECTIONS TO THE SITE: BEGIN AT THE TOWN OF DARBY, MONTANA. TRAVEL SOUTH ON US 93 FOR 4.4 MILES TO THE INTERSECTION OF STATE HIGHWAY 473 (WEST FORK ROAD). TRAVEL SOUTHWEST ON STATE HIGHWAY 473 (WEST FORK ROAD) FOR 17.9 MILES. TURN RIGHT (WEST) ON ROMBO CREEK CAMPGROUND ROAD AND
CONTINUE FOR 0.3 MILES TO THE PROJECT SITE.
TEMPORARY ACCESS ROADS IN THE CAMPGROUND WILL BE CONSTRUCTED TO FACILITATE THE SHORELINE STABILIZATION CONSTRUCTION. ALL TEMPORARY ACCESS ROADS WILL BE RECLAIMED AFTER USE.
ACCESS AND STAGING
NOTES: CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ACCESS
ROADS AND TEMPORARY HAUL ROADS. EQUIPMENT AND
MAINTENANCE AREA TO BE STAGED MINIMUM 150' FROM RIVER.
CONTRACTOR IS RESPONSIBLE FOR RECLAIMING TEMPORARY
ACCESS ROADS PRIOR TO MOBILIZATION AWAY FROM SITE.
PLAN VIEW
LEGEND
SYMBOL
COFFER DAM
BYPASS
TEMPORARY ACCESS ROAD
STAGING AREA
WORK AREA ISOLATION PLAN
FLOW
TEMPORARY COFFER DAM
AND BYPASS CHANNEL
TEMPORARY ACCESS ROADS
TEMPORARY ACCESS ROADS
INSTALL TEMPORARY COFFER DAM AND EXCAVATE A 12 FT BY 2.5 FT BYPASS CHANNEL FROM STATION 5+60
TO STATION 9+40 AS SHOWN (SEE SHEET 9).
DEWATER ISOLATED WORK AREAS WITH A SUMP AND PUMP AS NECESSARY IF GROUND WATER IS PRESENT.
FLOW
FLO
W
RIVER CENTERLINE ALIGNMENT
FLOW
100 % DESIGN
Sheet: 2 of 9
Drawn By: LS
Designed By: NW
Drawing Checked: NW
Design Checked: MD
ROMBO CAMPGROUND
SITE ACCESS, STAGING, AND WORK ISOLATION
FLOW
STAGING AREA
0+20
0+40
0+60 0+80 1+00 1+20 1+40
1+60
1+80
2+00
2+20
2+40
2+60
2+80
3+00
3+20
3+40
3+60
3+80
4+00
4+13
5+00
5+50
6+00
6+50
7+00 7+50
8+00
8+50
9+00
9+50
10+00
-0.65%
4462'
4464'
4466'
4468'
4470'
4472'
4474'
4476'
4462'
4464'
4466'
4468'
4470'
4472'
4474'
4476'
5+
5+
5+
5+
5+
6+
6+
6+
6+
6+
7+
7+
7+
7+
7+
8+
8+
8+
8+
8+
9+
9+
9+
9+
9+
+0
+2
+4
+4
STRUCTURE LAYOUT
1" = 50'
STRUCTURE SCHEDULE
STATION
START
STATION
END BANK STRUCTURE
6+16 6+90 R VWM
6+90 7+20 R LWS
7+20 8+36 R VWM
8+36 8+66 R LWS
8+66 9+16 R VWM
PLAN VIEW
RIVER CENTERLINE ALIGNMENT
STRUCTURE LAYOUT
1" = 50'
PROFILE VIEW
RIGHT BANK FILL EXTENTS
TOP OF BANK PROFILE
EXISTING CHANNEL THALWEG PROFILE
Flow
IMAGE: MAXAR 2022
CONSTRUCTION EXTENTS
Flow
DETAIL LEGEND
SYMBOL DETAIL
SHEET #
LARGE WOOD STRUCTURE 5
VEGETATED WOOD MATRIX 6
WILLOW TRENCH 7
FLOODPLAIN FILL
WEST FORK
BITTERROOT RIVER
ACTIVE CHANNEL
STREAMBANK
ACTIVE CHANNEL
STREAMBANK
CHANNEL TOP OF BANK
ELEVATIONS
STATION
START
ELEVATIONS
(FT)
6+50 4472.5 6+70 4472.4 6+90 4472.3
CHANNEL TOP OF BANK
ELEVATIONS
STATION
START
ELEVATIONS
(FT)
7+10 4472.1 7+30 4472.0 7+50 4471.9
CHANNEL TOP OF BANK
ELEVATIONS
STATION
START
ELEVATIONS
(FT)
7+70 4471.7 7+90 4471.6 8+10 4471.5
CHANNEL TOP OF BANK
ELEVATIONS
STATION
START
ELEVATIONS
(FT)
8+30 4471.4 8+50 4471.2 8+70 4471.1
CHANNEL TOP OF BANK
ELEVATIONS
STATION
START
ELEVATIONS
(FT)
8+90 4471.0 9+10 4470.8 9+30 4470.7
SIDE CHANNEL
100 % DESIGN
Sheet: 3 of 9
Drawn By: LS
Designed By: NW
Drawing Checked: NW
Design Checked: MD
ROMBO CAMPGROUND
PLAN VIEW AND PROFILE
COFFER DAM ALIGNMENT
TEMPORARY COFFER DAM
AND BYPASS CHANNEL
STAGING AREA
TOTAL WOOD QUANTITIES
ITEM QUANTITY DIAMETER LENGTH ROOTWAD
CATEGORY 1 WOOD 30 10-12 IN 20 FT YES
CATEGORY 2 WOOD 740 4-6 IN 20 FT OPTIONAL
CATEGORY 3 WOOD 1,380 1-3 IN 8-10 FT OPTIONAL
WILLOW CUTTINGS 2,200 0.25-1.0 IN 6-8 FT NO
NOTE:
WOOD LENGTHS SHOWN WILL PRODUCE THE PROPER AMOUNT OF MATERIAL FOR
STRUCTURES WHEN SPLIT INTO APPROPRIATE SIZES DURING CONSTRUCTION. IT IS
CONTRACTOR'S RESPONSIBILITY TO CUT WOOD INTO APPROPRIATE SIZE LENGTHS TO FIT
STRUCTURE DIMENSIONS.
TOTAL ROCK QUANTITIES
ITEM QUANTITY (CY) GRADATION
STREAMBANK FILL 55 SIZE (IN) PERCENT
PASSING
12 95 10 80-90 8 60-75 5 45-55 2 30-40 1 20-25
0.08 10-15*
*A MINIMUM OF 10% OF MATERIAL SHALL BE RETAINED ON THE 0.08 INCH SCREEN
AND A MAXIMUM OF 20% OF THE MATERIAL SHALL BE RETAINED ON THE SCREEN.
TOTAL EARTHWORK QUANTITIES
ITEM QUANTITY (CY)
BYPASS CHANNEL* 200
CUT TO SUBGRADE 125
STREAMBANK FILL 55
FLOODPLAIN FILL 150
NET (IMPORTED BACKFILL) 80
*BYPASS CHANNEL VOLUME IS A CUT-FILL BALANCE.
VOLUME SHOWN FOR BIDDING PURPOSES.
NOTE:
ALL VOLUMES ARE NEATLINE, CONTRACTOR TO APPLY
EXPANSION FACTORS TO DETERMINE A MORE ACCURATE
BACKFILL VOLUME.
LARGE WOOD STRUCTURE QUANTITIES
ITEM QUANTITY (EA)
LARGE WOOD STRUCTURES 2
CATEGORY 1 WOOD 30
CATEGORY 2 WOOD 20
CATEGORY 3 WOOD 60
WILLOW CUTTINGS 400
VEGETATED WOOD MATRIX QUANTITIES
ITEM QUANTITY (LF)
VEGETATED WOOD MATRIX 240
CATEGORY 2 WOOD 720
CATEGORY 3 WOOD 1,200
WILLOW CUTTINGS 1,200
WILLOW TRENCH QUANTITIES
ITEM QUANTITY (LF)
WILLOW TRENCH 120
CATEGORY 3 WOOD 120
WILLOW CUTTINGS 600
100 % DESIGN
Sheet: 4 of 9
Drawn By: LS
Designed By: NW
Drawing Checked: NW
Design Checked: MD
MATERIALS AND QUANTITIES
LARGE WOOD STRUCTURE
MATERIAL SCHEDULE (PER STRUCTURE)
ITEM DIA. (IN) LENGTH (FT) ROOTWAD (Y/N) QTY.
STREAMBANK FILL 12" MINUS 15 CY
CATEGORY 1 WOOD 10"-12" 20 YES - 3 FT. DIA. MIN 14-16 EA
CATEGORY 2 WOOD 4"-6" 20 NO 8-10 EA
CATEGORY 3 WOOD 1"-3" 8-10 OPTIONAL 1-2 FT 30 EA
WILLOW CUTTINGS 0.25"-1.0" 6-8 NO 200 EA
EXAMPLE OF A LARGE WOOD STRUCTURE
PLAN VIEW
LARGE WOOD STRUCTURE
0' 2.5' 5'
100 % DESIGN
Sheet: 5 of 9
Drawn By: LS
Designed By: NW
Drawing Checked: NW
Design Checked: MD
ROMBO CAMPGROUND
LARGE WOOD STRUCTURE DETAIL
LARGE WOOD STRUCTURE
FLOODPLAIN
SECTION VIEW
STRUCTURE
DEPTH = 8'-10'
4' - 6' PROJECTION
EXISTING
GROUND
PROPOSED
TOP OF BANK
ROOTWAD LOG
(CATEGORY 1 WOOD)
BRUSH AND LIMBS
(CATEGORY 3 WOOD)
FOOTER LOG
(CATEGORY 2 WOOD)
~2.5'
(REFERENCE VWM)
NTS
SUBGRADE
EXCAVATION
FLOODPLAIN
STREAMBANK FILL
FINISH GRADE
FLOODPLAIN
BASEFLOW WIDTH = +/- 30'
BANKFULL WIDTH = +/- 100'
WILLOW
BUNDLE
CONSTRUCTION NOTES
1. CONSTRUCTION OF LARGE WOOD STRUCTURES WILL OCCUR BEFORE THE VEGETATED WOOD MATRIX BANK TREATMENTS ARE INSTALLED.
2. ANY CHANGES TO THE CONSTRUCTION SEQUENCE MUST BE APPROVED THE C.O.
GENERAL NOTES
1. EXCAVATE TO THE EXCAVATION LIMITS. EXCAVATED MATERIAL SHALL BE STOCKPILED ON THE FLOODPLAIN OUTSIDE OF THE IMMEDIATE WORK AREA.
2. INSTALL FOUR-FOOTER LOGS (CATEGORY 2 WOOD) AT THE BASE OF THE EXCAVATED TRENCH AT THE ORIENTATIONS NOTED IN PLAN VIEW. FOOTER LOGS SHALL PROJECT NO GREATER THAN 1 FT. BEYOND THE FINISH GRADE BANK LINE. EXPOSED ENDS OF FOOTER LOGS SHALL BE BROKEN/ROUGHENED SO AS TO APPEAR
NATURAL. SAWED ENDS OF FOOTER LOGS SHALL NOT BE EXPOSED.
3. INSTALL EIGHT ROOTWAD LOGS (CATEGORY 1 WOOD) INTERSECTING BOTH FOOTER LOGS AT THE ORIENTATION NOTED IN PLAN VIEW. THE UPSTREAM ROOTWAD SHALL NOT PROJECT INTO THE CHANNEL AND SHALL BE FLUSH WITH THE FINISHED BANK LINE. THE DOWNSTREAM ROOTWAD SHALL PROJECT NO GREATER THAN 4-6 FT.
BEYOND THE FINISHED BANK LINE.
4. BACKFILL TRENCH WITH STOCKPILED MATERIAL UP TO THE TOP OF THE FOOTER LOGS (CATEGORY 2 WOOD). BACKFILL SHALL BE BUCKET COMPACTED.
5. INSTALL A SECOND TIER OF FOUR-FOOTER LOG (CATEGORY 2 WOOD) FOOTER LOGS SHALL PROJECT NO GREATER THAN 1 FT. BEYOND THE FINISH GRADE BANK LINE.
EXPOSED ENDS OF FOOTER LOGS SHALL BE BROKEN/ROUGHENED SO AS TO APPEAR NATURAL. SAWED ENDS OF FOOTER LOGS SHALL NOT BE EXPOSED.
6. INSTALL SMALL WOOD AND BRUSH (CATEGORY 3 WOOD) AT APPROXIMATE 45° ANGLE TO ROOTWAD STEMS. BRUSH AND LIMBS SHALL PROJECT NO GREATER THAN 3
FT. BEYOND THE FINISHED BANK LINE.
7. INSTALL SIX TO SEVEN ROOTWAD LOGS (CATEGORY 1 WOOD) INTERSECTING THE LOWER TIER OF ROOTWADS AT THE ORIENTATION NOTED IN PLAN VIEW. THE
ROOTWADS SHALL PROJECT NO GREATER THAN 2 FT. BEYOND THE FINISHED BANK LINE.
8. INSTALL SMALL WOOD AND BRUSH (CATEGORY 3 WOOD) AND WILLOW CUTTINGS INTERWOVEN INTO WOOD MATRIX UP TO FINISHED GRADE. BRUSH, LIMBS, AND WILLOW CUTTINGS SHALL PROJECT NO GREATER THAN 4 FT. BEYOND THE FINISHED BANK LINE.
9. BACKFILL WOOD MATRIX WITH STREAMBED FILL UP TO FINISHED GRADE WITH STOCKPILED NATIVE MATERIAL. NO AREAS BEHIND THE FINISHED BANKLINE ARE TO BE
LEFT BELOW THE FINISHED GRADE.
10. INSTALL DEFLECTOR LOGS (CATEGORY 2 WOOD) AT APPROXIMATE 45° ANGLE TO ROOTWAD STEMS. DEFLECTOR LOGS SHALL BE HALF EMBEDDED IN THE FLOODPLAIN AND PROJECT NO GREATER THAN 4 FT. BEYOND THE FINISHED BANK LINE. EXPOSED ENDS OF FOOTER LOGS SHALL BE BROKEN/ROUGHENED SO AS TO APPEAR
NATURAL. SAWED ENDS OF FOOTER LOGS SHALL NOT BE EXPOSED.
STREAMBANK FILL
GRADATION
SIZE (IN) PERCENT
PASSING
12 95 10 80-90 8 60-75 5 45-55 2 30-40 1 20-25
0.08 10-15
EXCAVATION
LENGTH = 35'
WILLOW BUNDLE
EXCAVATION LIMITS
MINIMUM ROOTWAD
DIAMETER = 3'
ROOTWAD LOG
(CATEGORY 1 WOOD)
BRUSH AND LIMBS
(CATEGORY 3 WOOD)
FOOTER LOG
(CATEGORY 2 WOOD)
FINISHED GRADE BANKLINE
BANK KEY-IN
DISTANCE = 10-15'
MAXIMUM STRUCTURE
PROJECTION = 4' - 6'
AVERAGE STRUCTURE
LENGTH = +/-30'
F
LO
W
NOTES ON VEGETATED WOOD MATRIX INSTALLATION
1. CONSTRUCTION OF THE VEGETATED WOOD MATRIX WILL OCCUR AFTER THE
CHANNEL STREAMBED IS CONSTRUCTED AND IN CONJUNCTION WITH LWS.
2. IF VEGETATED WOOD MATRIX STRUCTURES ARE INSTALLED PRIOR TO OCTOBER
1, LEAVE BACK TRENCH UNFILLED AND COMPLETE STRUCTURE WHEN
DORMANT WILLOWS ARE AVAILABLE.
3. IT IS CONTRACTOR'S RESPONSIBILITY TO CUT WOOD INTO APPROPRIATE SIZE
LENGTHS TO FIT STRUCTURE DIMENSIONS.
GENERAL NOTES
1. EXCAVATE TO THE EXCAVATION LIMITS AS SHOWN. EXCAVATED MATERIAL
SHALL BE STOCKPILED OUTSIDE OF THE IMMEDIATE WORK AREA.
2. PREPARE THE BENCH OF THE STRUCTURE BY PLACING CHANNEL
STREAMBANK FILL ALLUVIUM FROM THE BASE OF THE EXCAVATION
DEPTH/BOTTOM OF EXCAVATION TO WITHIN 1.0 FT. MIN. THICKNESS.
3. CATEGORY 2 AND CATEGORY 3 WOOD, AND CHANNEL STREAMBANK
ALLUVIUM SHALL BE PLACED IN ALTERNATING LAYERS AND BUCKET
COMPACTED UP TO THE TOP OF BANK ELEVATION AS SHOWN BELOW IN THE
INSTALLATION SEQUENCE. PLACE SIX (6) FT TO EIGHT (8) FT. DORMANT
WILLOW CUTTINGS AT A DENSITY OF 5 PER LINEAR FT ALONG THE TOP OF
BANK LINE ELEVATION. WILLOW CUTTINGS SHALL SLOPE AT AN
APPROXIMATE 1:1 SLOPE AS SHOWN IN SECTION VIEW. STEMS MAY
OVERLAP. THE CUT ENDS SHALL BE PLACED AT THE BASE OF THE SLOPES
WITH THE UN-CUT ENDS EXTENDING BEYOND THE EDGE OF THE TRENCH SO
NO GREATER THAN ONE-THIRD OF THE TOTAL CUTTING LENGTH IS EXPOSED
BEYOND THE TOP OF BANK EDGE. WILLOW CUTTINGS SHOULD INTERCEPT THE
DESIGN TOP OF BANK LINE AS SHOWN IN STEP 5 OF THE INSTALLATION
SEQUENCE.
4. THE UPSTREAM AND DOWNSTREAM ENDS OF THE STRUCTURE SHALL
TRANSITION SMOOTHLY INTO ADJACENT STREAMBANK STRUCTURES TO
MINIMIZE EROSION, FLANKING, AND BANK FAILURE. STRUCTURE ENDS MAY
BE STABILIZED WITH ADDITIONAL CATEGORY 1 ROCK AS APPROVED BY C.O.
5. AFTER INSTALLATION OF THE VEGETATED WOOD MATRIX, BACKFILL THE
STRUCTURE WITH STOCKPILED MATERIAL TO FINISHED GRADE, AND BUCKET
COMPACT. NO AREAS BEHIND THE FINISHED BANKLINE ARE TO BE LEFT
BELOW FINISHED GRADE.
1" = 5'
STEP 1
PREPARE BENCH AT
CHANNEL BED ELEVATION
2:1
WILLOW TRENCH
(SEE SHEET 7)
1" = 3'
RECOMMENDED VEGETATED WOOD
MATRIX INSTALLATION SEQUENCE
SECTION VIEW
VEGETATED WOOD MATRIX
PLAN VIEW
STEP 2
PLACE CATEGORY 2 WOOD AT BED
ELEVATION AND BACKFILL
WITH ALLUVIUM
STEP 3
PLACE A LAYER OF CATEGORY 3
WOOD, BACKFILL WITH ALLUVIUM,
AND PRESS WITH BUCKET
STEP 4
PLACE A WINDROW OF ALLUVIUM
AND PRESS WITH BUCKET TO FORM
A POINT AT THE TOP OF BANK LINE
STEP 5
INSTALL WILLOWS AT TOP OF
BANK LINE AND BACKFILL WITH
NATIVE MATERIAL
VEGETATED WOOD MATRIX
MATERIAL SCHEDULE (PER
LINEAR FOOT)
ITEM DIA. (IN) QTY.
CATEGORY 2 WOOD 4"-6" 3
CATEGORY 3 WOOD 1"-3" 5
WILLOW CUTTINGS 0.25"-1.0" 5
STREAMBANK FILL 12" MINUS 0.1 CY
1" = 3'
1:1
WILLOW TRENCH
(SEE SHEET 7)
BACKFILL
STREAMBANK FILL
CATEGORY 3 WOOD
6' - 10'2' MAX PROTRUSION
4' - 8'
STREAMBED
WILLOW CUTTINGS
VEGETATED WOOD MATRIX
SECTION VIEW
BANKFULL
WATER SURFACE
BASEFLOW
WATER SURFACE
FI
N
IS
H
ED
T
O P
O F
BA
N
KL
IN
E
FINISHED GRADE
2:1
CATEGORY 2 WOOD
STREAMBANK FILL
GRADATION
SIZE (IN) PERCENT
PASSING
12 95 10 80-90 8 60-75 5 45-55 2 30-40 1 20-25
0.08 10-15
100 % DESIGN
Sheet: 6 of 9
Drawn By: LS
Designed By: NW
Drawing Checked: NW
Design Checked: MD
ROMBO CAMPGROUND
VEGETATED WOOD MATRIX DETAIL
DESIGN
CHANNEL
STREAMBANK
20°- 40°
INSTALL CATEGORY 2
WOOD AT VARYING
ANGLES FROM BANKLINE
EXAMPLE OF A CONSTRUCTED WILLOW TRENCH
1. WILLOW TRENCHES WILL BE CONSTRUCTED TO INCREASE FLOODPLAIN CONNECTIVITY, DISPERSE SURFACE FLOWS AND PROMOTE REVEGETATION.
CONSTRUCTION OF WILLOW TRENCHES WILL OCCUR AFTER WILLOWS HAVE ACHIEVED DORMANCY, TYPICALLY AFTER OCTOBER 15TH.
2. CONTRACTOR SHALL MARK AND C.O. SHALL APPROVE THE GENERAL CONSTRUCTION LOCATION FOR EACH WILLOW TRENCH PRIOR TO CONSTRUCTION.
WILLOW CUTTINGS
TRENCH EXCAVATED AND
BACKFILLED WITH
MATERIAL REMOVED TO
CREATE TRENCH
WILLOW CUTTINGS
TRENCH EXCAVATED AND
BACKFILLED WITH
MATERIAL REMOVED TO
CREATE TRENCH
FLOODPLAIN BACKFILL
OR EXISTING GROUND
FLOODPLAIN BACKFILL
OR EXISTING GROUND WILLOW TRENCHES
CONSTRUCTED AS LINEAR
FEATURES THAT MAY BE
CURVED OR STRAIGHT
FLOODPLAIN BACKFILL
APPROX. 5'
APPROX. 5'
FINISHED FLOODPLAIN SURFACE
GENERAL NOTES
EXTENDS LATERALLY THE
LENGTH OF THE STAKED
TREATMENT LOCATION
EXTENDS LATERALLY THE
LENGTH OF THE STAKED
TREATMENT LOCATION
1. WILLOW TRENCHES WILL BE CONSTRUCTED WITHIN THE FLOODPLAIN AT THE DIRECTION OF THE CO.
2. A TRENCH WILL BE CONSTRUCTED APPROXIMATELY 5' DEEP AND EXTEND THE LENGTH OF THE STAKED TREATMENT LOCATION. LIVE WILLOW CUTTINGS AND CATEGORY 3 WOOD WILL BE PLACED IN THE TRENCH SUCH THAT THEY ARE INTERMIXED AND ORIENTED AT A NEAR VERTICAL ANGLE.
3. THE TRENCH WILL THEN BE BACKFILLED WITH THE SAME MATERIAL REMOVED TO CREATE THE TRENCH AND SHOULD MATCH THE ELEVATION OF THE
SURROUNDING FLOODPLAIN GRADE.
NOTES ON WILLOW TRENCH INSTALLATION
EXAMPLE OF A WILOW TRENCH INSTALLATION
FINISHED FLOODPLAIN SURFACE
WILLOW TRENCH
SECTION VIEW
NTS
WILLOW TRENCH
PROFILE VIEW
NTS
VEGETATED BRUSH TRENCH
PLAN VIEW
NTS
WILLOW TRENCH MATERIAL SCHEDULE
(PER LINEAR FOOT)
ITEM DIA. (IN) QTY.
WILLOW CUTTINGS 0.25"-1.0" 5
CATEGORY 3 WOOD 1"-3" 1
100 % DESIGN
Sheet: 7 of 9
Drawn By: LS
Designed By: NW
Drawing Checked: NW
Design Checked: MD
WILLOW TRENCH DETAIL
EL
EV
AT
IO
N
ALIGNMENT OFFSET STATIONING
STATION 6+90
4466'
4468'
4470'
4472'
4474'
4476'
4466'
4468'
4470'
4472'
4474'
4476'
EL
EV
AT
IO
N
ALIGNMENT OFFSET STATIONING
STATION 7+10
4466'
4468'
4470'
4472'
4474'
4476'
4478'
4466'
4468'
4470'
4472'
4474'
4476'
4478'
EL
EV
AT
IO
N
ALIGNMENT OFFSET STATIONING
STATION 6+70
4468'
4470'
4472'
4474'
4476'
4478'
4468'
4470'
4472'
4474'
4476'
4478'
EL
EV
AT
IO
N
ALIGNMENT OFFSET STATIONING
STATION 7+30
4466'
4468'
4470'
4472'
4474'
4476'
4478'
4466'
4468'
4470'
4472'
4474'
4476'
4478'
EL
EV
AT
IO
N
ALIGNMENT OFFSET STATIONING
STATION 7+50
4466'
4468'
4470'
4472'
4474'
4476'
4478'
4466'
4468'
4470'
4472'
4474'
4476'
4478'
EL
EV
AT
IO
N
ALIGNMENT OFFSET STATIONING
STATION 7+70
4464'
4466'
4468'
4470'
4472'
4474'
4476'
4478'
4464'
4466'
4468'
4470'
4472'
4474'
4476'
4478'
EL
EV
AT
IO
N
ALIGNMENT OFFSET STATIONING
STATION 7+90
4464'
4466'
4468'
4470'
4472'
4474'
4476'
4478'
4464'
4466'
4468'
4470'
4472'
4474'
4476'
4478'
EL
EV
AT
IO
N
ALIGNMENT OFFSET STATIONING
STATION 8+10
4466'
4468'
4470'
4472'
4474'
4476'
4478'
4466'
4468'
4470'
4472'
4474'
4476'
4478'
EL
EV
AT
IO
N
ALIGNMENT OFFSET STATIONING
STATION 8+30
4466'
4468'
4470'
4472'
4474'
4476'
4478'
4466'
4468'
4470'
4472'
4474'
4476'
4478'
EL
EV
AT
IO
N
ALIGNMENT OFFSET STATIONING
STATION 8+50
4466'
4468'
4470'
4472'
4474'
4476'
4478'
4466'
4468'
4470'
4472'
4474'
4476'
4478'
EL
EV
AT
IO
N
ALIGNMENT OFFSET STATIONING
STATION 8+70
4466'
4468'
4470'
4472'
4474'
4476'
4478'
4466'
4468'
4470'
4472'
4474'
4476'
4478'
LEGEND
EXISTING GRADE
SUBGRADE
FINISHED GRADE
FILL
100 % DESIGN
Sheet: 8 of 9
Drawn By: LS
Designed By: NW
Drawing Checked: NW
Design Checked: MD
CROSS SECTIONS
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
0+20
0+40
0+60 0+80 1+00 1+20 1+40
1+60
1+80
2+00
2+20
2+40
2+60
2+80
3+00
3+20
3+40
3+60
3+80
4+00
4+13
6+00
6+50
7+00 7+50
8+00
8+50
9+00
STATION
4467' 4468' 4469' 4470' 4471' 4472' 4473' 4474'
4467' 4468' 4469' 4470' 4471' 4472' 4473' 4474'
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
-0.86%
TEMPORARY COFFER DAM WITH BYPASS CHANNEL
PLAN VIEW
LINE COFFER DAM WITH
POLYETHYLENE SHEETING
TO PREVENT SEEPING
CONSTRUCT COFFER
DAM WITH EXCAVATED
CHANNEL MATERIAL
CLEARWATER BYPASS
CHANNEL
12" MIN. BURY
EXCAVATE A 2.5 FT X 12 FT
TEMPORARY BYPASS CHANNNEL
EXAMPLE OF AN ISOLATED STREAMBANK
100 % DESIGN
Sheet: 9 of 9
Drawn By: LS
Designed By: NW
Drawing Checked: NW
Design Checked: MD
ROMBO CAMPGROUND
BMP DETAILS
NOTES: CONTRACTOR SHALL CONSTRUCT
A MINIMUM 2.5 FT DEEP BY 12 FT WIDE
BYPASS CHANNEL TO CONVEY THE
APPROXIMATE BASE FLOW OF 70 CFS.
ADDITIONAL BMP'S SHALL BE INSTALLED
AT THE DIRECTION OF THE C.O.
RIVER CENTERLINE ALIGNMENT
FLOW
TEMPORARY COFFER DAM AND
BYPASS CHANNEL ALIGNMENT
TEMPORARY COFFER DAM
AND BYPASS CHANNELFLOW
FLOW
TOP OF COFFER DAM
BYPASS CHANNEL THALWEG
EXISTING GROUND
EXTENTS OF COFFER DAM AND
BYPASS CHANNEL GRADING
TEMPORARY COFFER DAM WITH BYPASS CHANNEL
PROFILE VIEW
TEMPORARY COFFER DAM WITH BYPASS CHANNEL
SECTION VIEW
1" = 40'
1" = 40'
NTS
EARTHWORK
EXCAVATION OF BYPASS CHANNEL
AND CONSTRUCTION OF COFFER DAM
WILL RESULT IN APPROXIMATELY
200 CY OF CUT AND PLACEMENT.
| 2023-02-02 Rombo Working Drawing Set 100%-0 COVER PAGE AND NOTES |
| Sheets and Views |
| 2023-02-02 Rombo Working Drawing Set 100%-0 COVER PAGE AND NOTES |
| 2023-02-02 Rombo Working Drawing Set 100%-1 EXISTING CONDITIONS AND CONTROL |
| Sheets and Views |
| 2023-02-02 Rombo Working Drawing Set 100%-1 EXISTING CONDITIONS AND CONTROL |
| 2023-02-02 Rombo Working Drawing Set 100%-2 ACCESS STAGING |
| Sheets and Views |
| 2023-02-02 Rombo Working Drawing Set 100%-2 ACCESS STAGING |
| 2023-02-02 Rombo Working Drawing Set 100%-3.0 PLAN VIEW AND PROFILE |
| Sheets and Views |
| 2023-02-02 Rombo Working Drawing Set 100%-3.0 PLAN VIEW AND PROFILE |
| 2023-02-02 Rombo Working Drawing Set 100%-4.0 MATERIALS AND QUANTITIES |
| Sheets and Views |
| 4.0 MATERIALS AND QUANTITIES |
| 2023-02-02 Rombo Working Drawing Set 100%-5.0 LARGE WOOD STRUCTURE DETAIL |
| Sheets and Views |
| 2023-02-02 Rombo Working Drawing Set 100%-5.0 LARGE WOOD STRUCTURE DETAIL |
| 2023-02-02 Rombo Working Drawing Set 100%-6 VEGETATED WOOD MATRIX DETAIL |
| Sheets and Views |
| 2023-02-02 Rombo Working Drawing Set 100%-6 VEGETATED WOOD MATRIX DETAIL |
| 2023-02-02 Rombo Working Drawing Set 100%-7 WILLOW TRENCH |
| Sheets and Views |
| 2023-02-02 Rombo Working Drawing Set 100%-7 WILLOW TRENCH |
| 2023-02-02 Rombo Working Drawing Set 100%-8 TYPICAL CROSS SECTIONS |
| Sheets and Views |
| 2023-02-02 Rombo Working Drawing Set 100%-8 TYPICAL CROSS SECTIONS |
| 2023-02-02 Rombo Working Drawing Set 100%-9 BMP |
| Sheets and Views |
| 2023-02-02 Rombo Working Drawing Set 100%-9 BMP |
| 2023-05-22T09:16:49-0600 | |
| AMBER RICHARDSON |
| 2023-05-22T09:42:01-0600 | |
| DANIEL PLILEY |
| 2023-05-23T09:14:33-0600 | |
| MATTHEW ANDERSON |
File details come from the government source that posted it. Updated .